A wooden sliding door looks simple on a drawing, which is exactly why it goes wrong so often in production. The panel has to slide smoothly, sit flush with the wall, match the joinery around it and survive years of use — and every one of those outcomes depends on information you give the factory before the first panel is cut. Below is the brief we ask project teams to send when they specify Santerson Wooden Sliding Doors, so that quotation, production and site installation line up from the start.

Start with the opening, not the door

Sliding doors are made to measure, so the opening governs everything else. Send us the clear opening width and height at three points across each dimension (top, middle, bottom), plus the wall build-up: what the finished wall face is, how much floor finish will be added on site, and whether the ceiling is a slab, a grid or a bulkhead. If the door is pocket-sliding rather than surface-mounted, tell us early — the pocket has to be built around the gear, so its depth and structural framing are part of the wall detail, not something to sort out later.

For wardrobe and closet applications, send the internal carcass dimensions as well as the room opening. Our Wooden Sliding Door Wardrobes are built around the storage layout inside, so panel count and rail positions follow from what has to be reachable.

State the operation you actually want

"Sliding door" covers several different mechanisms, and they need different details. In your brief, specify:

  • Panel count and stacking direction — two, three or more panels, and which side they park.
  • Track type — top-hung or floor-guided, and whether a visible track across the floor is acceptable. Where a flush, step-free finish matters, say so; Santerson Flush Sliding Doors are specified when the door should read as part of the wall.
  • Panel overlap and clearance — how much the panels must overlap at the closing edge, and any skirting, handle or furniture that sits in the travel path.
  • Daily user profile — a guest-room closet and a busy corridor door are not specified the same way. Tell us who operates it and how often, so the gear is matched to the duty.

Give finish and material direction in writing

We work to the finishes you name rather than guessing from a photograph. Useful detail includes the substrate and surface treatment, sheen level, grain direction, edge treatment, and whether the door face should match an adjacent item such as wall panelling, a wardrobe front or cabinetry. Where matching matters, send the reference — a laminate or veneer code, a sample number, or a physical sample in the courier parcel. A written finish schedule by room beats a mood board every time.

If you want the sliding face to continue a wall design, look at Wooden Sliding Panels in our sliding panel systems and note that preference in the brief; the detailing differs from a door in an opening.

The information we need to quote accurately

ItemWhat to send
ScheduleOne line per door: tag number, room, clear opening size, panel count, stacking side, track type.
DrawingsWall sections at the opening, floor build-up levels, and the pocket or reveal detail where relevant.
FinishesNamed material, colour or code, sheen, edge profile, and any matching reference to other joinery.
Hardware intentHandle style and position, lock or latch requirement, soft-close or magnetic catch preference.
Access and packagingLift size, service entrance dimensions, floor level, storage area on site, and delivery address with receiving hours.
ProgrammeRequired on-site date, the trade that closes the opening, and which other fit-out items ship in the same container.
Send one consolidated pack per project rather than answers spread across a long email chain. A single schedule sheet plus sections is the fastest route from enquiry to a quotation you can compare against your budget.

How the brief moves through production

Once we have the above, the sequence follows our standard project path: consultation and planning, then design and specification confirmation, then production with quality control, logistics to site, installation support and after-sales. We can produce doors as part of a wider package — cabinetry, wardrobes, panelling and other interior fixtures for the same project — which keeps finishes consistent across trades and reduces the number of deliveries you have to manage.

Before cutting, we return shop drawings for your sign-off. Check three things on them: opening sizes against your latest site survey, panel stacking against furniture layouts, and finish codes against your schedule. Corrections at that stage are cheap; corrections after packing are not.

Site conditions worth flagging early

  • Floor levels. Sliding doors need a known finished floor level. If screed or tile thickness is still undecided, the bottom detail cannot be finalised.
  • Wall tolerance. Tell us whether the opening will be made good by your builder or by us. Out-of-plumb openings are fixable, but only if we know before the frame is built.
  • Storage. Panels need a dry, flat place on site between delivery and installation. Confirm this exists before the container arrives.
  • Trade sequence. Sliding doors go in after wet trades and floor finishes are complete. Put that dependency in the programme, not just the email.

Questions we are asked most often

Can you match an existing door or cabinet front? Send the material code or a sample and we will confirm what is achievable before quoting. Where exact matching matters, we say so plainly rather than promising a result we cannot verify.

What sizes can you make? Doors are made to measure for each project, so size comes from your opening and the mechanism chosen — confirm dimensions and selected specifications on the shop drawing before production.

Can the doors ship with other fit-out items? Yes. Many projects consolidate sliding doors, wardrobes, cabinetry and wall panelling into one production and delivery plan; tell us in the brief which items belong in the same consignment.

Ready to send your brief?

Send us your door schedule, opening sections and finish references, and we will come back with a specification and quotation for review. If you are still deciding between surface-mounted and flush detailing, tell us the site condition that is driving the decision — we will advise on what the wall build-up can actually support.