A pocket door looks simple on a drawing: a leaf that slides into a cavity in the wall. In practice it is one of the few openings in a project where the frame, the wall build-up, the hardware and the finish all have to agree before the first panel arrives on site. That is why the supplier you choose for Classic Pocket Doors matters more than the unit price on a quotation. Here is what a project buyer should actually check before placing an order.

1. Does the supplier build to your opening, or sell you a standard size?

Pocket doors fail far more often from measurement error than from material failure. Wall thickness varies with stud depth, plasterboard layers and insulation; floor levels vary between bays; and the clear opening a joiner draws is not always what the bricklayer leaves. A supplier who works only in fixed sizes will ask you to adapt the building to the door. A made-to-measure supplier does the opposite.

For our pocket door range we specify each set to the opening on the approved drawings — leaf height and width, wall cavity depth, jamb detail and finish — rather than offering a single catalogue size. That is standard across the collection, including Wood Veneer Pocket Doors and Glass Pocket Doors, where the leaf construction changes but the sizing logic does not.

What to ask for: a shop drawing per opening, with a schedule that lists every door number, its rough opening, finished opening, wall thickness and hand/slide direction. If a supplier cannot produce that schedule quickly, they will be slow when the drawings change.

2. Can the finish match the rest of the joinery package?

A classic pocket door is usually specified to sit flush with wall panelling, wardrobe fronts or architraves in the same room. When the doors come from one supplier and the cabinetry from another, small differences in veneer cut, grain direction, lacquer sheen or edge profile become visible as soon as the light hits them.

This is the strongest argument for buying doors inside a wider fit-out package. As a furniture and building materials manufacturer, we produce pocket doors, wardrobes, vanities, wall panelling and kitchen cabinetry in the same factories, so a wood veneer door leaf, its architrave and a matching wardrobe front can be ordered to the same species, cut and finish. For villa and apartment work, including projects in Australia, that single-source approach removes most of the finish-matching correspondence that normally eats project time.

3. Does the supplier understand the wall build-up, not just the leaf?

The pocket is a small piece of building construction: a steel or timber buck, a header carrying the track, side returns, a floor guide, and enough clear cavity for the leaf plus hardware travel. Buyers should expect a supplier to confirm:

  • the rough opening dimensions they need, and who is responsible for building the pocket;
  • how the header is supported where the wall carries other loads;
  • whether skirting, architrave or flush trim details are supplied with the set;
  • which hardware is included — track, rollers, floor guide, door stop, strike and handle furniture;
  • how the leaf edge is finished where it disappears into the pocket.

A supplier who answers these questions in writing before production is doing quality control. A supplier who answers them after the containers are booked is creating a snag list.

4. How do they handle change orders and site corrections?

Openings move on site. A partition shifts 50 mm, a door schedule is renumbered, one bathroom becomes a laundry. Made-to-order doors cannot simply be swapped from a shelf, so the practical question is how the supplier handles a correction: what information they need, how fast a replacement leaf or set can be remade, and who pays for freight on the reshipment.

Ask specifically about spare parts and replacement supply after handover. For hotel and apartment owners, a door that is out of service in one room should not require a new container. Our installation and after-sales support covers inspection and snags at handover, spare parts and replacement supply, and ongoing maintenance; we also keep project documentation so a later matching leaf can be reproduced to the original specification.

5. What arrives on site, and in what condition?

Doors are high-value, low-tolerance goods and they travel badly if packed carelessly. Check how leaves are packed — vertical or flat, edge protection, separation between lacquered faces — and whether hardware travels in the same crate or separately. Then check the packing list: it should tie each crate to a door number on the schedule, so installers know which set belongs to which room.

We arrange sea, air and rail freight with customs paperwork, container loading plans and door-to-door delivery, so door sets reach the site rather than a port warehouse. For multi-trade packages this also means doors can be consolidated with cabinetry, wardrobes and bathroom fixtures in one shipment instead of three.

6. Do they make only doors, or the whole interior envelope?

Pocket doors rarely sit alone. The same wall usually carries panelling, a concealed door elsewhere in the corridor, and a wardrobe or vanity nearby. Consolidating those items with one manufacturer reduces the number of drawings to coordinate, the number of samples to approve, and the number of suppliers pointing at each other when something does not fit.

SANTERSON works as a one-stop project furnishing supplier: interior design and space planning, custom and OEM manufacturing of furniture and building materials, production quality control, logistics, and installation support. For door buyers this means one specification language across flush sliding doors, hinged and concealed doors, panelling systems and built-in storage.

A short supplier checklist before you order

  • Made-to-measure sizing from your drawings, with a door schedule per opening
  • Written confirmation of rough opening, wall thickness and who builds the pocket
  • Hardware list stated in the quotation: track, rollers, guide, stops, furniture
  • Finish samples matched to the joinery package, approved before production
  • Crate-to-door-number packing list for the site team
  • A named process for corrections and spare parts after handover
If you are specifying pocket doors for a villa, apartment or hospitality project, send us the door schedule and wall sections. We will return shop drawings, a hardware specification and a quotation with matched finishes — contact SANTERSON.

Product reference: Classic Pocket Doors, part of the Pocket Doors collection. Dimensions, materials and finishes are confirmed per project before production.