A glass partition quote is rarely a single number. It is the sum of the opening you measured, the glass and framing you chose, the hardware that carries the moving panels, and the conditions of the site they have to travel through and land on. Send a supplier "about 3 metres of glass partition" and you will get a guess back. Send the checklist below and you will get a price you can actually compare with other bids.
Here is what we ask project teams for before we price glass partitions, and why each item changes the number.
1. The measured opening, not the nominal one
Send width and height for every run, and state clearly whether those are finished-floor-to-soffit dimensions or clear openings after the ceiling and floor finishes are in place. Glass partitions are made to measure, so a dimension taken off a bare slab and a dimension taken off the completed floor are two different products.
- Overall run length, plus the height at floor, at mid-height and at ceiling if the ceiling is not level.
- Where the run starts and ends — against a brick wall, a plasterboard wall, a column, or another partition.
- Obstacles inside the opening: skirting, cornice, downlights in the soffit, exposed services, sprinkler heads, door swings.
- Whether the run turns a corner, and if so which side carries the post.
If you have drawings, send the plan view and one elevation with dimensions marked. A sketch with real numbers beats a beautiful render with none.
2. Where it is being installed and what it has to do
The same glass in two rooms needs two different builds. Tell us the room type and the job the partition is doing:
- Bathroom or wet area — this drives water exposure, privacy, and how the base detail is built.
- Bedroom, study or living area — usually a storage, dressing or zoning partition.
- Office, reception or meeting room — sightlines, acoustics and door frequency come into play.
For openings that need to move, say so at the start. A fixed screen, a partition sliding system and an acoustic operable wall are different products with completely different price structures — the moving versions carry tracks, carriers, floor guidance and jambs that a fixed panel never needs.
3. Fixed or operable — and how it moves
For moving systems, these details decide both the mechanism and the cost:
- Number of panels and the stacking pocket you want them to disappear into.
- Top-hung or floor-guided, and whether a floor track is acceptable in that location.
- Opening width available for the stack, and the required pass-through width when open.
- Whether panels need to fold, slide on a straight track, or follow a curved track.
- Doors within the partition — hinged, sliding or pocket — and which direction they open.
Where a door is part of the same wall line, send it with the partition instead of as a separate enquiry. Glass sliding doors ordered alongside the screen share framing, glass specification and shipment; ordered separately they carry two sets of frames, two deliveries and two site visits.
4. Glass, frame and finish choices
You do not need to specify everything — that is what a supplier is for — but state your preference and the reason behind it so we can confirm or push back:
| Item | What to tell the supplier |
|---|---|
| Glass look | Clear, frosted, ribbed, tinted or mirrored — and whether privacy or light transfer matters more in that room. |
| Frame | Frameless, slim aluminium frame, or a timber/metal frame matching other joinery on the job. Send the colour or finish reference. |
| Hardware | Handle style, lock requirement, soft-close or plain runners, and the traffic level the hardware has to survive. |
| Adjacent finishes | Flooring, wall tile and ceiling line at the partition, so the reveal and junction details match. |
If you are matching an existing fit-out — wardrobes, vanities, timber panelling — send photographs of it. Wood panel partitions and glass screens on the same wall line should be quoted together, because the junction between them is where most site problems appear.
5. Quantities, phasing and the project calendar
- Number of each identical opening — a schedule of openings with one line per partition beats a single total.
- Whether the order is one drop or several phases, and which areas come first.
- The date partitions must be on site, working backwards from wet trades, flooring and handover.
- Any hold points where your design may still change, so we can price around them instead of absorbing the risk.
6. Site access, delivery and installation
Glass is heavy, awkward and fragile, and site conditions are a real cost line rather than an afterthought:
- Building address, floor level, lift dimensions, stair width, and whether a crane or hoist is available.
- Delivery windows and any permit requirements for the loading area.
- Who installs — your builder, or do you need installation support?
- For overseas projects: destination port or site, who acts as importer of record, and preferred Incoterms. We handle freight forwarding, customs paperwork and door-to-door delivery, so tell us how far you want us to take it.
7. What you need us to confirm in writing
A useful quote request also lists the questions you want answered, not just the price:
- Panel weight and whether the supporting floor or ceiling can carry it.
- Glass type and safety build for the location you described.
- Track, carrier and hardware specification, plus expected service life under your traffic level.
- Lead time from approved drawings, packing schedule and container breakdown.
- What is excluded — site preparation, making good, structural support, on-site supervision.
A simple brief template that works
Copy this into your enquiry and you will usually get a firm price in one round instead of three:
- Project: location, building type, stage of construction.
- Scope: schedule of openings — one row per partition, with width, height, fixed or operable, and panel count.
- Drawings: plan, elevation, and photographs of the space and adjacent finishes.
- Preference: glass look, frame finish, hardware style, and what matters most (privacy, light, acoustics, durability).
- Program: required delivery date, phasing, installation responsibility.
- Logistics: destination, access constraints, Incoterms or door-to-door.
Send us your opening schedule
SANTERSON has been manufacturing furniture and building materials since 2008, with custom and OEM production for villa, hospitality and office projects. Send drawings, an opening schedule and the site details above, and we will come back with a specification and a quotation you can compare line by line.
Contact: PHILLIP | Phone / WhatsApp: +86-13928214007 | Email: santerson@qq.com
Specifications, hardware and safety builds are confirmed per project once dimensions and site conditions are verified.