Why the WS-115AⅢ Is Rarely the Last Model You Compare

Specifying Outdoor Swim Spa WS-115AⅢ usually starts from a drawing: a villa terrace, a resort garden or a pool deck with a fixed footprint. The model is the first one that fits those dimensions on paper — 3880 × 2200 × 1250 mm in the catalogue, with a swim training system, water jets, ozone and LED lighting listed as shown features. Buying on that fit alone is where procurement mistakes happen. A short comparison pass across the rest of the range usually changes the specification, and on some pairings it changes the electrical load more than it changes the footprint.

This guide sets out what to check before you lock in an alternative, using models we actually publish in the same series so the comparison is real rather than theoretical.

Start With the Duty, Not the Model Number

Two units can share a shell length and serve completely different programmes. Before comparing anything else, decide which of these the asset has to deliver:

  • Lap training in a compact footprint. A short tank plus a swim training system is the only way to get continuous swimming into a narrow terrace or an indoor plant room.
  • Hydrotherapy seating first, swimming second. More jets and more pumps matter here; a swim current is optional.
  • A long, uninterrupted swim channel. Where length is available, a dedicated channel removes the need for a swim unit altogether.
  • A shaped feature element. Square, round, oval or curved basins designed around the architecture rather than a standard cabinet.

WS-115AⅢ sits in the first group: 3880 mm long with one swim training system and one water pump. If the client's brief is really "a spa to sit in", that single-purpose configuration is the wrong starting point, and no amount of option upgrading will fix it.

Read the Pump and Jet Line Before the Dimensions Line

Within the same series, the "-U" variants are where hydrotherapy capacity moves. The published specifications make the trade-off visible: WS-115AⅢ lists one water pump, 24 jets and a total power figure of 8.05 kW. Outdoor Swim Spa WS-115AⅢ-U shares the same catalogue dimensions — 3880 × 2200 × 1250 mm — but lists four water pumps, 23 jets and 11.85 kW, with no swim training system shown.

That single line change moves the published total power figure from 8.05 kW to 11.85 kW on the same footprint. For a project team this is not a spec-sheet curiosity; it determines the supply you request from the electrical engineer, the cable run, the protection device and where the plant can be located relative to the deck. It also means the two units are not interchangeable late in a programme — swapping them after the services design is fixed normally triggers rework.

Specification shownWS-115AⅢWS-115AⅢ-U
Catalogue dimensions3880 × 2200 × 1250 mm3880 × 2200 × 1250 mm
Swim training system1 setNot listed
Water pump1 pc4 pcs
Filter pump1 pc1 pc
Jet total24 pcs23 pcs
LED lights4 pcs1 pc
Total power8.05 kW11.85 kW

The figures above are transcribed from the catalogue pages for each model. Included equipment and electrical requirements depend on the configuration ordered, so confirm them in writing against your quotation before any service design is signed off.

Compare the Alternatives That Actually Change the Answer

Same footprint, more jets: WS-115AⅢ-U

Where the terrace is fixed at about 3.9 m and the brief leans toward massage seating rather than swimming, this is the direct alternative. The envelope does not move; only the water side of the specification does. Note that LED lighting drops from four fittings to one, so if the design relies on underwater light for a night-time terrace scheme, that needs reviewing rather than assuming it carries over.

Same family, longer tank: WS-115FⅢ and WS-115EⅢ-U

If the swim current is non-negotiable but 3880 mm feels tight for the user, Outdoor Swim Spa WS-115FⅢ keeps the 2200 × 1250 mm section and stretches the length to 5000 mm, still with one swim training system, 24 jets and the same 8.05 kW total power. In practice this is the least disruptive upgrade: the electrical load does not change, only the deck layout does.

Outdoor Swim Spa WS-115EⅢ-U goes the other way — 5280 × 2200 × 1250 mm, three water pumps, 24 jets and 9.65 kW, with no swim training system shown. It buys jet capacity and length, not a current to swim against.

A step up in section: WS-125AⅢ and WS-125AⅢ-U

Outdoor Swim Spa WS-125AⅢ moves to 5500 × 2300 × 1350 mm with one swim training system, one water pump, 20 jets and 8.05 kW — deeper and wider, same power figure as the 115AⅢ. The WS-125AⅢ-U again trades the swim unit for four water pumps, 23 jets and 11.85 kW on identical dimensions.

Full-length swim channel: WS-130AⅢ

Where a site can take it, Outdoor Swim Spa WS-130AⅢ at 8000 × 3000 × 1400 mm changes what the asset does. With one swim training system, 20 jets, seven LED fittings and 10.85 kW, it reads as a lap pool with a spa end rather than a spa with a swim option.

The WS-130AⅢ-U follows the same pattern as the other "-U" models in this series: four water pumps, 23 jets, five LED fittings and 11.85 kW on identical dimensions, with no swim training system shown for that variant.

When the standard cabinet is wrong: shaped and extended options

Some terraces and resort settings need a basin set into a curved deck or aligned to a facade. A Customizable Shape Outdoor Spa covers square, round, oval and curved layouts with an acrylic shell and structural reinforcement, which is the route when geometry drives the design. For programmes where length is available and both exercise and recovery matter, a Long Outdoor Swim Spa with Hydrotherapy & Relaxation Pool separates the two functions into a swim channel and a dedicated relaxation area instead of forcing one tank to do both.

What to Confirm in Writing Before You Order

  • Configuration, not model code. The catalogue lists optional control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps. Availability and compatibility vary by model, so the quotation must state what is included in your build.
  • Total power and supply arrangement. Compare the kW figure of the unit you specified against the alternative you are considering — 8.05 kW versus 11.85 kW on an identical footprint is a real design change, not a rounding difference.
  • Swim training system present or absent. On "-U" variants this is not shown in the published specifications; do not assume it can be added later.
  • LED fitting count. It varies across the series, from one to seven fittings depending on model and variant.
  • Deck, access and plant clearances. Catalogue dimensions are the shell. Confirm site access for delivery, crane or rigging needs, and where the filter pump sits.

Specifying It as Part of a Wider Package

On the villa and resort projects we supply, a swim spa is only one line in a longer schedule: terrace furniture around it, a pergola or hardtop above it, wall cladding and finishes behind it. When those items come from one manufacturer, the project runs on a single production schedule and a consolidated container plan instead of several suppliers coordinating with each other.

As a furniture and building materials manufacturer, we quote the swim spa alongside that wider scope. Our services cover design consultation, custom/OEM production, logistics and door-to-door delivery, installation and after-sales support. If you are weighing the WS-115AⅢ against other models in this series, send us the drawing and the duty you need covered — training, hydrotherapy or both — and we will confirm the configuration that fits rather than steer you to the nearest model code.

Send your terrace dimensions, site access notes and the duty you need the unit to cover. We will confirm the included equipment, total power requirement and delivery arrangement for the selected configuration before you commit the services design.