Open wardrobes with a metal frame look simple on a mood board, which is exactly why their quotations go wrong. A single line drawing and a photo of a bedroom are not enough for a manufacturer to price the job properly. Below is the information pack we ask for on every Metal Frame Open Wardrobes enquiry, and what each item changes in the final number.

Why open wardrobe quotations move so much between suppliers

A closed wardrobe can be described by three numbers: width, height, depth. An open wardrobe adds variables that are invisible from a distance — the frame profile and its finish, how far each shelf spans without sagging, whether the verticals carry load or the wall does, and how the unit meets the floor, ceiling and skirting. Two drawings that look identical can sit in different price bands because one uses a slim aluminium profile fixed to a masonry wall and the other uses a heavier frame with a base plinth on a suspended timber floor.

We build these units as made-to-measure work, so we quote from your documents rather than from a catalogue size. Send us the information below and the first quotation is usually close to the final one; leave items out and you get a range instead of a number, followed by a revision after the site survey.

1. Dimensions, and how they were measured

Give us the clear opening for the wardrobe wall: overall width, overall height and the maximum depth available, plus the position of anything that intrudes — power points, switches, air-conditioning outlets, downlights, skirting boards, door architraves and radiators. A sketch with handwritten dimensions is fine; a scaled plan is better.

  • Finished floor level to finished ceiling level, not structural slab to slab.
  • Depth measured at the deepest point, including skirting projection.
  • Out-of-plumb or out-of-square walls called out, with the size of the deviation.
  • Whether the unit stops short of the ceiling or is scribed and filled to it.
  • Room access: stairwell turns, lift dimensions, corridor widths and door openings on the delivery route.

Access matters more than people expect. A three-metre vertical standard will not pass a tight apartment stair, so we may design the frame in bolted sections instead. That decision changes both the profile spec and the price, and it is cheaper for us to make it at quoting stage than after production.

2. Frame material, profile and finish

Tell us which you want, or tell us the look you are working toward and we will propose a profile:

ItemWhat to specifyWhy it affects price
Frame materialSteel or aluminium profile; tube size or section if you already have a detailSection size drives the metal content and the fixing detail
Surface finishPowder-coat colour reference, brushed metal, wood-effect transfer or paintedColour-matched and textured finishes need separate batches
Frame roleDecorative trim around carcass boxes, or a structural frame that carries shelvesA load-carrying frame needs thicker sections and engineered fixings
Edge detailMitred corners, butt joints with concealed connectors, or visible bolted jointsMitred metal corners are hand-finished work

If the metal frame has to match joinery elsewhere in the project — a Minimalist Open Wardrobes detail, or bedroom cabinetry already on site — send us that reference. Matching an existing profile is straightforward; inventing one from a photograph usually takes two rounds.

3. Interior layout and what you intend to store

Open wardrobes are storage, not decoration, so the hanging and shelf rhythm comes from your client's wardrobe, not ours. Tell us how many metres of hanging rail you need, whether you want double hang, and how much of the run is shelves versus drawer units.

  • Hanging heights: long garments, shirts and jackets, or a mix.
  • Shelf span and intended load — folded knitwear behaves differently from boxes and books.
  • Drawer units, pull-out trays, laundry hampers, shoe shelving, trouser pulls.
  • Integrated lighting: strip lights in the frame rebate, sensor switches, transformer location and where the power feed arrives.
  • Security or privacy needs: curtains, sliding panels, or doors added later to part of the run.

Shelf span is the detail most often left out of a drawing. A shelf that spans more than roughly 800 mm under real load needs either a thicker board, a mid support or a stiffer frame bay. We will flag it in the quotation rather than let it appear as movement after handover.

4. Board, panel and hardware choices

Metal frames are usually paired with a board panel — melamine, lacquered or veneered fronts, glass panels where the design calls for them. Send us the board type, thickness and colour reference, or the supplier's product code if one has already been specified. For our wider Freestanding Open Wardrobes work we confirm these choices in writing before cutting, because a finish change after cutting is a re-manufacture, not a substitution.

For hardware, specify the hinge and runner brand if your project has an approved list, otherwise tell us the expected usage intensity: a guest room, a family bedroom and a hotel room are three different duty levels. Where a project needs doors added to some bays later, we can prepare the frame for that now — Glass Open Wardrobes details are a common route when the design wants display rather than concealment.

5. Site conditions and fixing method

We need to know what the frame is fixing into. Concrete, masonry, timber stud, plasterboard over a cavity and steel framing all take different fixings and different blocking.

  • Wall construction type, and whether the wall can carry the unit or needs a floor-mounted base.
  • Floor finish and build-up height — tiled, timber, carpet — and whether the unit sits on a plinth or is floated above the finish.
  • Skirting treatment: cut around, removed and replaced, or scribed to.
  • Room humidity and exposure: an internal bedroom and a bathroom-adjacent dressing area take different board edges.
  • Whether site trades will prepare the setting-out, or you want our drawing issued to their builder.
If your drawings are still at concept stage, send them anyway. We mark up what is missing and tell you which decisions have to be locked before we can price, so your client sees a cost band with named assumptions instead of a guess.

6. Quantities, phasing and the delivery route

State the number of identical units and the number of unique ones. Repeat units are where made-to-measure work gets efficient: one approved detail runs across every bedroom, and variations are limited to widths and finish pairings. Then tell us how the job is phased — which rooms or floors first, and whether units are needed before or after wet trades finish.

Delivery scope changes the price as much as materials do. Tell us:

  • Quantity of each configuration, by room or floor.
  • Destination address and whether it is a private residence, a hotel in operation or a construction site.
  • Incoterms you want quoted — ex works, FOB, CIF to port, or door-to-door delivery.
  • Packaging expectation: flat-packed frames with panel bundles, or partly assembled modules.
  • Who installs: your joiner, our installation team, or us on site with supervision.

7. Drawings, references and approvals

A useful enquiry pack for an open wardrobe package contains:

  • Room plans and elevations with dimensions, PDF or DWG.
  • A detail of the frame-to-panel junction if you have one; a photograph of a similar installed unit is acceptable as a starting point.
  • Finish schedule: metal colour reference, board code, hardware brand.
  • Site photographs and a video walk-through of the room and the delivery route.
  • The approval chain — who signs off the shop drawings, and by when.

We work from your documents through design coordination, production and site guidance, so the same pack that gets you an accurate quotation also drives manufacturing. As a furniture and building materials supplier handling cabinetry alongside flooring, wall panelling, lighting and sanitaryware, we can also cross-check the wardrobe detail against adjacent trades — for example that the skirting stops cleanly at the frame, or that the power feed for in-frame lighting is where the drawing says it is.

What you receive back

For a complete enquiry pack we return an itemised quotation — frame, panels, hardware, lighting, packaging and freight separated rather than one blended figure — plus shop drawings for your approval before cutting starts. Where a specification is still open, we quote two or three defined options with the difference between them explained in writing, so the choice is a commercial decision you make rather than a surprise at delivery.

If you want to test the process on one room first, send us the plan and finish schedule for that room alone. A single accurate quotation on one wardrobe run is the fastest way to judge whether our detailing matches your project before you commit the full package.

Send your drawings, dimensions and finish references to SANTERSON — phone and WhatsApp +86-13928214007, contact PHILLIP, email santerson@qq.com. We reply with an itemised quotation or a list of the missing decisions, whichever the drawings allow.