A submittal package is how a shower set gets approved before anyone orders it in quantity. For the Gun Grey Digital Display Rain Shower System, Wall Mounted Bathroom Shower Set with Handheld Sprayer, the package has to do two jobs at once: prove that a digital, wall-mounted set is safe and serviceable in a real bathroom, and prove that it will still look right after years of guest use. Below is the list we prepare for architects, contractors and procurement teams on villa, hotel and apartment projects, item by item.

What a submittal actually has to answer

Reviewers are not asking for marketing copy. Each document in the package answers one practical question: does it fit the wall and the pipework; does it fit the finish schedule; what happens when a part fails in year four; who replaces it. Write the package around those four questions and it clears review faster than a brochure that only lists features.

For this set, the starting point is its published description: a matte gun grey wall-mounted shower set with a digital screen showing real-time water temperature, a wide square overhead rain shower, a multi-function handheld sprayer on a slide bar with height adjustment, and installation accessories supplied in the box. Every item below expands one of those elements into evidence.

1. Product identification and scope of supply

Open with a single page that leaves no ambiguity about what is being bought:

  • Product name and model reference exactly as it appears on the quotation, plus the product page link.
  • A clear scope-of-supply list: overhead rain shower, handheld sprayer and hose, slide bar, wall-mounted mixer body with digital display, fixing brackets, and the installation accessories included with the set.
  • An itemised "not included" line — rough-in valve bodies, shut-off valves, supply pipework, tiling and any wall reinforcement are usually site or plumbing-contractor scope unless the quotation says otherwise.
  • Finish name as ordered (matte gun grey) and whether matching finishes are available for other sanitary ware on the same floor.

2. Dimensional drawings and wall set-out

A wall-mounted shower set fails review most often over geometry, not appearance. Include:

  • An elevation showing the overall height of the column, the projection of the overhead shower from the finished wall face, and the adjustable travel range of the slide bar.
  • A plan section showing clearances to the bath rim, glass screen or enclosure frame, so the overhead spray does not hit the glass or fall outside the wet area.
  • Centre lines and heights for the water connections, marked against finished floor level and finished wall face, with a note stating which dimension is taken from the product drawing and which is set on site.
  • A ceiling-height check. In low-ceiling apartments and guest rooms, confirm the overhead shower clears the tallest user comfortably instead of assuming it will.
Do not copy heights off a rendering. Take them from the product drawing for the exact variant being ordered, then have the plumbing contractor confirm them against the as-built wall build-up before the tiles go on.

3. Water supply, pressure and flow

Rainfall heads are the part that gets blamed when a shower feels weak, so state the working conditions rather than promising performance:

  • The supply pressure range the set is designed for, and whether the figures apply to the overhead head, the handheld sprayer or both.
  • Flow rate at the stated reference pressure, so the engineer can check it against the hot-water plant and the project's water-efficiency targets.
  • Hot-water requirements: minimum incoming temperature and any mixing or thermostatic control needed upstream.
  • Behaviour across multiple bathrooms on the same riser — how many outlets can run at once without the shower dropping in temperature or volume.

Where a project sits below the required pressure, say so in the submittal and propose the remedy: booster pump, pressure-reducing valve, or a change to a set with a smaller head. Flagging it at submittal stage is far cheaper than fixing it at handover.

4. The digital display and its power source

A temperature screen on a shower raises two legitimate reviewer questions, and the package should answer both directly:

  • Where the display gets its power — battery, external supply, or water-driven generation. If an external supply is needed, state the voltage, where the transformer sits, and who provides the electrical feed and conduit.
  • What the screen indicates in practice: on this model it shows real-time water temperature, which supports safe set points for children's bathrooms, elderly users and guest rooms where staff cannot pre-check every shower.

If a project prefers no electronics at all, keep the submittal honest and show the alternative instead of forcing this model through. The Modern Rainfall Shower System with Handheld Sprayer is a comparable wall-mounted set with an overhead rainfall head, multi-mode handheld sprayer and slide bar, without a digital screen — useful as the value-engineered line on guest-room floors.

5. Materials, finish and durability evidence

For a coloured set in a shared bathroom, the finish is a maintenance issue, not just an aesthetic one:

  • Base material and coating method for the gun grey surface, with the cleaning agents the manufacturer recommends and — equally important — the ones to avoid, such as abrasive or acidic cleaners that dull a matte coating.
  • Corrosion and surface test reports where they exist for the variant being ordered. Report numbers should match the finish in the schedule; a report for chrome does not cover gun grey.
  • Seal and cartridge specification, since replacement parts rather than the whole column are what keep a hotel bathroom fleet alive.
  • A physical sample or mock-up panel showing the true tone under the project's lighting. Matte grey reads differently under warm guest-room lighting and cool lobby lighting.

6. Installation, access and maintenance

  • Fixing details for the wall build-up in use — solid masonry, steel stud with noggin, or timber frame — including any required backing plate or reinforcement, which must be built in before the lining goes up.
  • Tolerance allowance for uneven walls and out-of-plumb tiling, so installers know how much adjustment the brackets allow.
  • A parts diagram with individual component references and a recommended spare-parts list per 100 rooms: handheld sprayer, hose, seals, cartridge, display module.
  • Whether the set can be serviced from the room side without removing tiles. On a hotel fit-out, tile replacement costs dwarf the price of the fixture.

7. Quantities, packaging and delivery

  • Quantity per bathroom, plus spares held by facilities staff — commonly a set of wear parts per floor rather than whole units.
  • Packaging detail: number of pieces per carton, carton dimensions and gross weight, which the contractor needs for lifts, storage and damage inspection on arrival.
  • Batch and finish consistency across reorders, since a later top-up order in a slightly different grey is visible once installed side by side.
  • Pack list and marking convention that matches the room schedule, so cartons go straight to the right floor instead of being sorted on site.

8. Coordination with the rest of the bathroom

Shower sets are approved as part of a set of rooms, not alone. Reference how the gun grey finish sits alongside the other sanitary ware on the same floor — wall-hung basins, WC suites, mirror cabinets and vanity lighting — so the reviewer sees one coordinated specification rather than nine unrelated products. Where the schedule calls for matching hardware across several bathrooms, we specify those items together from the Bathroom Sanitary Fixtures range, which keeps finishes, delivery windows and spare-part supply on one order.

Also state who signs off each interface: plumbing contractor for supply and drainage, tiler for set-out and falls, electrician if a power feed is required, and the interior designer or client for the finish sample. Naming the responsible party next to each item removes most of the round trips that delay approval.

A submittal checklist you can send back with your enquiry

ItemWhat it must showUsual provider
Scope of supplyIncluded parts and excluded site worksSupplier
Elevation and plan sectionsProjections, heights, clearances to glass and bathSupplier
Connection set-outCentre lines and heights against finished levelsSupplier + plumbing contractor
Pressure and flow dataWorking range, flow at reference pressure, hot-water needsSupplier + MEP engineer
Display power detailPower source, feed location, electrical interfaceSupplier + electrician
Finish evidenceCoating method, cleaning regime, matching sampleSupplier + designer sign-off
Wall fixing detailFixings and reinforcement per wall build-upSupplier + structural/main contractor
Parts and sparesExploded diagram, spare list per 100 roomsSupplier
Packaging and quantitiesCarton data, room-schedule marking, reorder consistencySupplier + contractor

Send us the drawings and we will draft the package

SANTERSON is a China-based manufacturer and one-stop supplier of furniture, building materials and interior fixtures for villa, hospitality and office projects, operating since 2008, with custom and OEM service, door-to-door logistics, installation support and after-sales service. For this shower set we prepare the submittal documents above around your drawings and room schedule, and support bulk orders for engineering and project customers.

Send the bathroom layout, wall build-up and available mains pressure, and tell us which finishes are already approved. We will return a marked-up submittal draft for your review before anything is ordered.