A glossy sliding wardrobe looks simple on a drawing: two or three panels, a track, a reflective front. In production it is one of the more input-heavy items in a bedroom fit-out, because the door system, the carcass and the room structure all have to agree before anything is cut. The checklist below is what our workshop uses when a project sends us high gloss sliding door wardrobes, and it works just as well if you are preparing an enquiry for a villa, an apartment block or a hotel room floor.
Start with the wall-to-wall envelope, not the wardrobe
Sliding door wardrobes in our range are made to measure, so the first numbers we need are the room's, not a catalogue size. Send the width and height of the opening the wardrobe must fill, measured at several points across the width and several points up the height. Plasterboard on a timber frame, brick, and lightweight partition all behave differently, and even a small difference between the left and right side of an opening changes how the track is levelled on site.
Record these dimensions for each unit:
- Clear width of the wall run, and whether the run stops at a perpendicular wall, a window reveal or a corner
- Finished floor level to ceiling — and state clearly whether the height is measured to the structural slab or to a finished ceiling, because that decides whether we build a scribe or a filler panel
- Depth available from the wall face to the front of the wardrobe line, including skirting, architraves, radiator protrusions and door swings that cross in front of it
- Position and thickness of the skirting board, and whether it is being removed or the carcass is scribed around it
Then specify the door system
The door system drives both the cost and the usable opening. Tell us how many door leaves you expect and which combination you want: a two-panel bypass for a standard bedroom run, or wider panels where the opening allows it. Panel width has practical limits set by the track and by how heavy a high gloss panel is to handle during installation, so we confirm the leaf count with you before quoting rather than fixing it on the drawing.
For each unit, specify:
- Number of door leaves and the intended overlap when closed
- Top track or bottom track arrangement, and whether the ceiling can carry a suspended track — some projects cannot, and that changes the detail
- Handle or profile pull preference; a handleless front keeps the gloss surface uninterrupted but needs a finger allowance at the panel edge
- Whether any panel carries glass, mirror or an insert — that changes the panel weight and how the leaf is built, and it is a separate line item from a plain gloss front
If the same bedroom group also includes corner units, note that separately. A sliding door corner wardrobe needs the return dimension and the position of the corner post, and it is quoted as its own item rather than as an extension of the straight run.
Fix the internal layout before the doors are drawn
Doors hide the storage plan, so the interior has to be agreed first. Send the hanging zones, drawer banks and shelf stacks per unit, and say which zone is for long garments. We build internal layouts around how the space is actually used — hanging areas, drawer zones and shelf storage are all customised per project — and a layout change after the door elevation is issued means re-cutting panels.
| Input | What to send | Why it matters |
|---|---|---|
| Hanging zones | Single or double hang, and the length of each long-garment bay | Sets carcass height and shelf positions |
| Drawer banks | Number of drawers and whether they sit above or below the hang | Affects internal frame and access clearance |
| Shelving | Fixed or adjustable, and shelf spacing | Determines peg-hole drilling and panel spans |
| Lighting | Interior light positions and where the transformer sits | Needs cable routes decided before panels are machined |
| Room occupancy | Villa, apartment, hotel room or rental stock | Guides hardware grade and finish durability choice |
Choose the gloss surface with the project's use in mind
High gloss reads as a bright, reflective front that lifts a small bedroom, but it also shows fingerprints and edge chips more readily than a matte front. For high-traffic hotel rooms and rental apartments we ask which finish is intended for which room, so the specification matches the wear pattern rather than the render. If you want the same look with a softer surface, matte sliding door wardrobes in the same collection let you keep one door system across a floor while changing the front.
Send the board material and finish reference for each room group, plus the colour or texture sample code. Where the project has a broader joinery package — custom minimalist bedroom wardrobes, vanity units, media walls — we can match the wardrobe fronts to those items so one material schedule covers the whole floor.
What a complete enquiry looks like
Before you send a request, check that it includes:
- Room-by-room dimensions: width and height measured at several points, plus the total available depth
- Confirmation of finished floor and finished ceiling levels, with skirting details
- Door leaf count, track arrangement and handle preference per unit
- Internal layout sketch or marked plan showing hang, drawers and shelves
- Board material, finish reference and any glass or insert panels
- Project type, room count and delivery destination, so packaging and container loading are planned with the order
With those inputs in one file, we can return a quotation with confirmed dimensions and selected specifications rather than an estimate full of assumptions. As part of our custom & OEM service, SANTERSON handles the wardrobes alongside the rest of the joinery package, so the bedroom cabinetry, wall panelling and loose furniture come from one production plan and ship together under door-to-door delivery.
Send your dimension sheet and internal layout for each bedroom, and our project team will confirm the door configuration, finish options and pricing for your high gloss sliding wardrobe package. Contact SANTERSON to start the specification.