A swim spa is one of the few line items in a villa or hospitality bill of quantities where the quoted model name, the shell on the slab and the electrical supply all have to agree. This guide sets out what procurement teams should record before awarding Outdoor Swim Spa WS-PC05, so that the specification, the purchase order and the site handover pack describe the same unit.
Most swim spa disputes do not start with a faulty product. They start with a document gap: the enquiry named a model, the quotation confirmed a different equipment set, and the civil contractor built to a third drawing. The WS-PC05 sits inside our configurable outdoor swim and hydrotherapy range, which means several elements of the unit are chosen rather than fixed. What follows is the paperwork we ask buyers to complete for this model, item by item.
1. Record the exact model code, not just the product family
The PC05 family covers several distinct shells. A buyer who writes "5 m swim spa" on an enquiry invites substitution. Document the full model code on the quotation request and on the purchase order, and keep that code identical across drawings, invoices and packing lists.
| Model code | Catalogue shell dimensions (L × W × H) | Features shown in catalogue |
|---|---|---|
| WS-PC05 | 5000 × 3000 × 1100 mm | Water jets, LED lighting, Ozone, 4 water columns |
| WS-PC05CH | 5000 × 3000 × 900 mm | Water jets, LED lighting, Ozone |
| WS-PC05ST | 5000 × 2400 × 1470 mm | Water jets, LED lighting, Ozone, swim training system |
| WS-PC05ST-S | 5000 × 2400 × 1470 mm | Water jets, LED lighting, Ozone, swim training system |
| WS-PC05ST-L | 5490 × 2400 × 1470 mm | Water jets, LED lighting, Ozone, swim training system |
The WS-PC05ST-L shell is 490 mm longer than the other ST variants, and the CH variant is 200 mm shallower than WS-PC05. Those differences change the pit excavation, the deck setback and the seating posture, so they belong on the drawing sheet, not in an email thread. If your project needs a footprint that no catalogue shell matches, our Customizable Shape Outdoor Spa covers square, round, oval and curved shells instead.
2. Attach the equipment schedule for the selected configuration
For WS-PC05 the catalogue lists one control system, one water pump, one filter pump, eighteen jets in total, two LED lights and a total power figure of 2.25 kW. Treat that list as the starting point, then confirm each line against the quotation you receive. The same page also notes "Swim training system: not listed" for WS-PC05 — if your client expects counter-current swimming in this shell, that expectation must be resolved in writing before the order is placed, or the ST variants should be specified instead.
- Circulation and filtration: water pump quantity, filter pump quantity, filter type (cartridge or sand filtration).
- Hydrotherapy: jet count and jet layout, plus the four water columns shown for this model.
- Water treatment: ozone as standard on the catalogue record; UV sterilization is an option to confirm.
- Lighting: LED fitting quantity and control method.
- Thermal package: heat pump, insulation and cover — all listed as options, so state explicitly whether each is included or excluded.
- Access: steps, and any handrail the site team requires.
3. Freeze the electrical and siting data before production
The total power figure printed on a product page is not an installation instruction. Before manufacturing starts, the buyer should record the supply available at the plant room — voltage, phase, dedicated circuit capacity, protective device rating and cable run length — and send that data with the order. The electrical requirement for a configured unit is confirmed with the selected equipment set, which is why it belongs on the purchase order rather than in a post-delivery conversation.
Siting details should be documented at the same time:
- Finished floor level and slab or plinth dimensions, with load-bearing confirmation from the structural engineer.
- Whether the unit is above ground, semi-recessed or recessed, and the access panel size needed for pump and filter service.
- Drain route and overflow connection; ventilation for a recessed pit.
- Clearance for the cover swing and for step placement.
- Distance from the plant room to the spa, which drives cable and pipework cost.
4. Specify the scope of supply and the delivery split
Swim spas arrive as bulky cargo, and the boundary between our supply and the site contractor's work has to be written down. Document who provides the crane or lifting gear, who prepares the base, and where title and risk transfer. For international projects we arrange sea, air and rail freight with customs paperwork, packaging and container loading plans, shipment tracking and door-to-door delivery; the Incoterms, destination port and delivery address should appear on the same purchase order as the model code.
For buyers managing several packages at once — pool, poolside furniture, paving, bathroom fixtures — consolidating them with a single One-stop Furniture and Building Materials Supplier reduces the number of handover packs and avoids the situation where the spa is delivered to a site that cannot receive it.
5. Keep a written record for commissioning and after-sales
At handover, the procurement file for this line item should contain: the approved configuration sheet with all option lines marked included or excluded; the as-built dimensions handed to the civil contractor; the electrical data exchanged before production; the packing list matching the model code on the order; and the commissioning notes from the installer. That single pack is what makes a later spare-part request or warranty claim quick, because both sides are reading the same configuration.
A short pre-award checklist
- Model code on enquiry, quotation and order are identical.
- Equipment schedule confirms pump, filter, jet count, LED quantity, ozone and any UV option.
- Heat pump, insulation, cover and steps explicitly included or excluded in writing.
- Electrical supply data sent with the order; requirement confirmed for the selected configuration.
- Civil drawing shows shell dimensions, access panels and drain route.
- Delivery terms, destination and lifting responsibility recorded on the order.
Send us your configuration sheet
Share the model code, the equipment list and your site's electrical data, and we will confirm the configuration for your project and return a quotation with every option line itemised. Browse the wider range in Swimming Pools and Swim Spas, or contact our team directly.