Two-tone melamine wardrobes are ordered to the millimetre, so the wardrobe itself is rarely the last surprise on site. The unwrapping usually is: a panel that arrived chipped on a corner, an edge banding that split along a transit mark, or a crate whose contents do not match the packing list. Because melamine-faced panels are finished goods — the decorative surface and the edges are the product — packaging decides whether what you approved in the sample matches what your installer opens. Before you release an order, confirm these points with your supplier.
1. How the wardrobe is shipped: assembled cabinet or knock-down
The first question is not what protects the panels but whether the carcasses travel built or flat. Assembled cabinets carry more air, cost more per container and put the finished face of a door panel against every other box in the load. Knock-down shipments save space and reduce handling damage, but they move the assembly step to your side of the transaction — which means hardware, cam fittings, dowels and clear assembly instructions must arrive with the panels.
Ask which method applies to your order and, if it is knock-down, ask who assembles on site: your own joiner or a local contractor you brief from the supplier's drawings. That choice changes the labour line in your project budget more than the packaging itself does.
2. Panel and door protection: corner guards, edge protection, interleaving
Melamine fails at two places — the corners and the joint between the board substrate and the edge banding. A dent in a melamine corner cannot be sanded out or touched up the way a lacquered door can, so ask specifically how these are protected:
- Corner protection on every panel and door, not only on the outermost pieces in a bundle.
- Interleaving between panels so two finished faces do not rub against each other during road and sea vibration.
- Edge protection along the long sides of door panels, where banding lifts first if a strap bites into the stack.
- Surface protection on high-gloss or textured melamine doors in particular, since scuffs show immediately under raking light.
Our Two Tone Melamine Wardrobes are made to measure with the finish, layout and dimensions you specify for each room, so every panel in a shipment is project-specific. A replacement cannot be pulled from stock; it has to be re-manufactured and re-shipped. That single fact is the strongest argument for insisting on protective packaging rather than accepting a standard export carton.
3. Two-tone detail: labelling which face is which
A two-tone design carries two finishes across one elevation — a lighter field panel against a darker frame, or a wood-grain door against a solid carcass. In an unassembled bundle those panels look similar from the back. Confirm that each component is labelled to a part number on the assembly drawing, and that the labels identify the show face and the hinge side. Without that, an installer working to a schedule has to test-fit doors before fixing them, which costs time in every room.
Ask for the packing list to use the same part numbers as your shop drawings. When the two documents agree, a shortage is obvious at delivery instead of at the third week of installation.
4. Hardware and accessories: packed loose or pre-fitted
Sliding-door tracks, soft-close hinges, drawer runners, handles, integrated lighting components and shelf pins are the small items that hold a wardrobe together and are the easiest to lose in transit. Confirm:
- Whether hardware ships pre-fitted, in a separate marked box inside the same carton, or in its own carton.
- That spare fixings and at least one spare of each moving part are included.
- That glass, mirror or ribbed-glass components — if your design includes them — are crated separately with their own handling marks.
5. Crating for the voyage: plywood cases, strapping, moisture barriers
Wardrobes bound for Australia normally travel by sea, and a container moves through several temperature swings between loading and delivery. Condensation inside a container is the risk, not rain. Confirm with your supplier:
- Whether panels ship in plywood cases or heavy-duty cartons, and whether cases are strapped and blocked so nothing shifts inside.
- Moisture protection — wrapping plus desiccant — for melamine panels and any pre-fitted doors.
- Handling marks on the outside of each case: which face is up, which side opens, and a case number that ties back to the packing list.
- How many cases your order will occupy and how that compares with the container space you have booked alongside cabinetry, flooring and lighting.
Our Logistics & Door-to-Door Delivery service covers packaging and container loading alongside freight forwarding by sea, air or rail, customs paperwork such as commercial invoices, packing lists and certificates of origin, shipment tracking and delivery to site. Ask for the packing list and the container loading plan before the container is sealed, so you can check both against your order.
6. Receiving the delivery: what to do in the first ten minutes
Damage claims depend on what you record at handover, before the crew leaves and before you move cases into storage:
- Count the cases against the packing list; note any missing case immediately.
- Photograph any punctured, split or crushed case from more than one angle, with the case number visible.
- Open one case and inspect corners and edges before signing, rather than opening everything at once — that keeps evidence intact for the rest.
- Note damage on the delivery paperwork instead of writing it only in an email afterwards.
7. Where packaging cost belongs in your quotation
Packaging is not an optional line to be trimmed at the end of a purchase order. Compare quotations on the same basis: state for each whether cases are plywood or carton, whether doors travel assembled, and what protection is used on corners and edges. A lower price that assumes loose stacking in a shared container will look expensive after one damaged two-tone door panel has to be remade and flown out.
| Confirm before order release | Why it matters for melamine wardrobes |
|---|---|
| Assembled or knock-down | Sets who assembles on site, container volume and exposure of finished faces |
| Corner, edge and face protection | Chipped corners and lifted banding cannot be repaired like lacquer |
| Part numbering that matches shop drawings | Prevents two-tone panels being fitted the wrong way round or in the wrong room |
| Hardware packing and spares | Missing runners or hinges stop installation while replacements are shipped |
| Case type, strapping, moisture barrier | Container condensation is the main sea-freight risk to board panels |
| Packing list and loading plan before sealing | A shortage found on site costs weeks, not days |
Ordering wardrobes as part of a wider fit-out
Wardrobes rarely travel alone. A villa or apartment fit-out usually combines melamine joinery with Two Tone Acrylic Wardrobes in dressing areas and wet rooms, plus kitchen cabinetry, vanities, flooring and lighting — and those categories have different packing conventions and different unpacking sequences. Coordinating one packaging and delivery plan across the whole order, rather than accepting whatever each category ships in, is where a single supplier earns their keep. The project services listed on this site run from design and material selection through production, logistics, installation and after-sales support, so packaging and delivery sequencing can be agreed at quotation stage instead of improvised at the port.
If you are specifying wardrobes for a project now, send the room dimensions and the two finish combinations you are considering. We will confirm the specification, the packing method and the case count for your order before production starts.