A request for quote only works when the manufacturer can price the job you actually want. For handleless matte cabinets, the details that decide the price are hidden in plain sight: how the door opens without a handle, which matte surface you have specified, what sits inside the carcase, and where the units have to travel to. Send those details up front and you get comparable numbers back; leave them out and you receive three different quotes for three different kitchens.

The checklist below is the one we work through when a buyer sends drawings for our matte finish kitchen cabinet range. Cover each point and your enquiry becomes something a factory can price line by line instead of guessing at.

1. The project basics, before any cabinet detail

Manufacturers quote projects, not products. Put the commercial frame at the top of the enquiry so the quotation comes back in the right shape:

  • Project name, delivery city and site type — private villa, apartment block, hotel or serviced apartments.
  • Number of kitchens or units. A single villa kitchen and a multi-apartment fit-out are built, packed and shipped differently.
  • Required delivery date on site, and whether the schedule is firm or indicative.
  • Your Incoterms preference — ex works, FOB, CIF or door-to-door. State it; do not assume the supplier will offer one.
  • Who signs off the drawings: your designer, your builder, or the local joiner who will install.

2. Drawings and dimensions that can actually be built from

Handleless work is unforgiving of approximate dimensions: with no handle to break up the face, an out-of-square wall or an uneven reveal shows up immediately. For each kitchen send:

  • Wall-to-wall and floor-to-ceiling dimensions in millimetres, with finished floor level marked.
  • A sketch or CAD layout showing run lengths, corners, and where the tall units sit.
  • Window sills, radiators, pipework, flues and any obstruction that reduces cabinet depth.
  • Appliance schedule with model numbers and cut-out dimensions for oven, hob, extractor, dishwasher, fridge and wine cooler.
  • Worktop material and thickness, since the edge profile changes how the top door clears the counter.

Our cabinets are made to measure rather than to a fixed module grid, so state where you need a non-standard height or depth — a ceiling-height pantry, a shallow bank under a sloped ceiling, an island with services running through it.

3. How the door opens without a handle

"Handleless" is not one detail, it is a family of details, and each one carries a different cost. Say which you want:

Opening methodWhat the factory needs from you
Recessed J-pull or routed channel in the door edgeWhich edge the pull sits on for wall units, base units and drawers, and whether the reveal should read as a shadow line.
Profile rail (G-push / C-profile) fixed to the carcaseRail finish — matching the door colour, or a contrasting metal tone.
Touch-to-open mechanism with no visible pullWhich doors and drawers are touch-opened. Note that a heavy pantry door on a touch mechanism needs a different hinge from a small wall cabinet.
Integrated handle cut-out or finger recessCut-out position and whether the recess should be visible or concealed by shadow.

Also state your hardware expectation. Soft-close hinges and drawer runners are standard on our handleless minimalist kitchen cabinets, but if your project specifies a particular hinge brand, an inset rather than overlay door, or a specific runner extension, name it in the enquiry so the hardware is priced as you require.

4. The matte surface: name the material, not just the look

A flat matt finish can be produced several ways, and a quote that says only "matte grey" tells you nothing about what the door is made of or how it will wear. Specify the door construction and surface you want:

Surface optionTypical use on our projects
Matte acrylic door panelSmooth, uniform colour on feature walls and open-plan kitchens where the doors catch the light.
Matte lacquered door with routed or flat faceVilla and apartment fit-outs needing a painted finish in a specific tone.
Matte melamine / laminate boardApartment schemes and volume unit counts where consistency across many identical kitchens matters.
Matte wood veneer or wood grain with a neutral toneWarm schemes pairing timber grain with a flat matt colour, as in our wood and taupe handleless kitchen cabinets.
PVC-wrapped matte doorProjects where a wipe-clean surface and controlled unit cost are the priority.

Then give three more things: the colour reference (RAL code, Pantone, or a photo of an existing sample), the sheen level you expect — deep matt or low-sheen — and whether both faces of the door must match. A coloured core or a light reverse on a dark door is common practice and lower cost; if your designer wants colour-matched doors on both faces, say so before the price is issued.

Ask for a physical sample board before you sign off a matte colour. Photographs of matt surfaces shift with lighting, and a screen cannot show how the finish behaves under kitchen task lighting or where fingerprints show.

5. Carcase and interior fittings

A large part of the difference between two handleless quotes sits inside the box rather than on the door face. List:

  • Carcase board thickness and colour, and whether exposed ends are finished in matching door material.
  • Drawer count per bank, and drawer side style — slim metal sides or matched box drawers.
  • Internal fittings: pull-out larder racks, corner carousel or pull-out corner systems, cutlery inserts, bin housings, shelf pins versus fixed shelves.
  • Plinth detail — recessed and continuous, or square and flush to the door face.

6. Lighting and back panels

Two items sit between cabinetry and other trades, so settle them before the price is fixed:

  • Integrated lighting: LED strips in open display niches, under-wall-unit task lighting, and where the transformers are allowed to sit.
  • Back panels, and whether tiling or a stone splashback is fixed before or after the cabinets go in.

7. Quantities, packaging and delivery terms

For multi-unit work, ask for the quote split by unit type so you can compare like for like across suppliers. Alongside the price, request:

  • Packed volume in cubic metres and the number of packages per kitchen — this drives your local freight cost.
  • Packaging method: assembled boxes versus flat-packed panels, and how doors are protected on a long sea leg.
  • Container loading plan if you are consolidating cabinets with other materials such as built-in kitchen cabinetry, wardrobes, vanities or flooring from the same supplier.
  • Documents supplied with the shipment — commercial invoice, packing list and certificate of origin.
  • Lead time stated as production time plus transit time separately, so you can see where buffer is needed on site.

8. Sample, approval and after-sales terms to settle in writing

Close the enquiry with the process questions that cause disputes later:

  • Cost and lead time for a sample door or one fully built test kitchen before full production.
  • Who approves the shop drawings, and how many revision rounds are included.
  • What happens if a panel arrives damaged: replacement part shipped, or credit against a later order.
  • Whether spare parts — hinges, runners, colour-matched panels — can be reordered for the same project months later.
  • Whether on-site installation guidance is available, and in what form: an assembly manual, a video walkthrough, or a supervisor attending.

How to write the enquiry itself

Compare a short enquiry such as "quote 18 linear metres of matte grey handleless kitchen" with one that also states run lengths in millimetres, door board and thickness, colour reference and sheen level, which units take a routed pull and which take a profile rail, where touch-open is allowed, hinge and runner type, drawer box style, carcase thickness and finish, plinth setback, the appliance schedule reference, who supplies the worktop, and the delivery term with an on-site target month.

The second version leaves a factory far less room to add caveats, and it lets you place two or three enquiries side by side and compare the numbers honestly.

SANTERSON is a China-based furniture and building materials manufacturer supplying custom cabinetry and interior fixtures for villa, apartment and hospitality projects. Send us your drawings, appliance schedule and finish reference, and we will return an itemised quotation with packed volume and lead time broken out — contact our project team to start.