A glass-front tall cabinet looks simple on a drawing. It is one of the most specification-heavy items in a joinery package, because the door glazing, internal layout and structural support all have to be agreed before production starts. This guide explains what to send SANTERSON so that the quotation for our glass-front tall cabinets reflects what you actually intend to build, rather than an estimate you later have to correct.

What the product covers

Santerson Glass Front Tall Cabinets sit within our Tall Cabinets collection and are made for residential projects. Each unit is configured rather than ordered off a fixed shelf list: the finish, the internal layout and the overall dimensions are set to suit the room it is going into. The same approach applies across the wider tall-cabinet family, including Santerson Utility Tall Cabinets and Santerson Corner Tall Cabinets, which is why we quote them project by project instead of publishing a single price.

We do not publish standard dimensions, glass specifications or load ratings for this range. Those figures depend on the configuration you select and on how the unit is fixed and used on site, so they are confirmed with you during quotation rather than assumed from a catalogue sheet.

Where a glass-front tall cabinet is specified

The Tall Cabinets collection records this range as being designed for residential bathroom projects. In practice the same glazed, made-to-measure carcass answers several jobs in a home fit-out: a full-height store beside a vanity, with glazing above to keep light moving through a narrow room and closed doors below for linen and supplies; a display bay where glassware or ceramics are shown rather than stored; or a floor-to-ceiling unit that carries the vertical line of a run of wardrobes and panelling. Tell us which job you want the unit to do, because the internal layout follows from it — and if your project needs the same tall form in a laundry, kitchen or corridor, we price those variants alongside it.

What to send us with your enquiry

The more of the following you can supply at the start, the closer the first number will be to the final one. Items marked as drawings are not always available at early stage — tell us what you have and we will work from that.

InformationWhy it changes the price
Room, wall length and clear height; ceiling typeSets whether the unit is a standard-height carcass or a floor-to-ceiling build, and whether a scribe or filler is needed at the top.
Layout drawing or marked-up planDetermines number of doors, drawer stacks, adjustable shelves and any integrated appliance bay.
Glass type and frame detailTint, clarity, surface texture and the profile around the glazing are the largest single cost driver on a glass-front door.
Body and door finishLacquer, laminate, veneer and wood finishes are priced differently, and the same finish has to be matched across adjoining units.
Intended contents and loadingGlass shelf thickness, shelf spacing and hardware grade follow from what the cabinet will actually hold.
Door opening direction and clearanceAffects hinge choice, handle detail and whether doors interfere with a wall, a corner or an adjacent tall unit.
Lighting requirementCabinet lighting is configurable for these projects, but cable routes, a transformer location and a switching decision have to be agreed before the carcass is drilled.
Quantity and site addressSets the production run, packaging plan and freight method to your project.

Decisions to settle before we quote

  • Display or storage first. A cabinet meant to show glassware is glazed on most of the front and lit inside. A cabinet meant to hide a household store uses glazing only in the upper section, with closed doors below. Decide which job the unit has before choosing how much glass to specify.
  • How visible the interior should be. Clear glass shows everything, including the back panel and any cable. A tinted or textured surface hides clutter while keeping light in the room. Both are available; the choice is a design one, not a technical limitation.
  • Fixed or adjustable shelving. Adjustable shelves need pitch holes in the carcass sides. If you know the contents will change over time, say so at specification stage rather than at handover.
  • Where the tall unit sits in the run. A single unit and a bank of units sharing a finish are produced differently, and matching several orders across different production runs is harder than producing them together.

How the quotation process runs

  1. Enquiry and brief. You send the drawings, quantities and finish direction you have. We review what is specified and what is still open.
  2. Clarification. We come back with specific questions on glazing, internal layout and fixing detail. This step is where most cost differences get resolved.
  3. Quotation. You receive an itemised price for the agreed configuration, together with any alternatives we think are worth pricing for comparison.
  4. Detail confirmation. Before production, drawings and material selections are confirmed in writing so that what is built matches what was priced.
  5. Production, shipment and follow-up. Once details are signed off, the units enter production, then packaging and delivery to your project, with installation support and after-sales service arranged around the site programme.
If your enquiry is for a villa or apartment fit-out where cabinets, wardrobes, doors and other finishes all have to match, tell us at the start. Coordinating one joinery package through Turnkey Interior Project Solutions is usually simpler than matching separate orders from different suppliers.

Questions we are often asked before pricing

Can you match a finish I already have? Send a sample panel, a photograph in daylight, or the make and reference of the existing finish. We will confirm what can be matched and what can only be closely approximated.

Can the cabinet be built to a non-standard height? Yes — dimensions are set per project. Very tall units need a fixing and support decision, which is why we ask for ceiling type and wall construction early.

Do you supply only this item? Yes, single-item enquiries are welcome. Many customers also order adjoining cabinetry, doors and panelling from the same production run so that finishes match exactly.

Send us your drawings

Email santerson@qq.com, or call/WhatsApp +86-13928214007 and ask for Phillip. Include the room, quantities, your preferred finish direction and any drawings you have; we will tell you what else is needed before pricing.

Enquiries are answered within 24 hours during business hours, Monday to Saturday, 8:00 AM – 6:00 PM (GMT+8).