A shaker panel wardrobe rarely stalls a project because of the door design itself. It stalls because the people who sign off on it are not in the same conversation. The designer wants the recessed frame profile to read cleanly against the wall finish. The client likes the sample but asks whether the timber tone matches the flooring already ordered. The builder needs to know where the carcass sits before the skirting and cornices go in. Purchasing needs a price they can commit to. If those four conversations happen one after another, each round of questions costs another week. The checklist below is how we run those approvals at SANTERSON, using our shaker panel wardrobe as the worked example.

Start by naming who signs off on what

Before any drawing is issued, list the approvers and give each one a single, written area of responsibility. For wardrobe packages on villa and apartment projects we normally see five roles, and confusion starts when two of them think the other one owns the same decision.

ApproverWhat they are signingEvidence they need in front of them
Interior designer or architectDoor profile, panel proportion, finish and handle detailElevation drawings with dimensions, physical finish sample, close-up photo of the shaker rail and stile
Client or owner's representativeAppearance, layout and budgetOne page comparing two or three layouts, plus the price for each
Main contractor or site foremanSetting-out dimensions, floor level, wall build-up, service runsSite survey record and setout drawing, with the fixing method stated
Procurement or quantity surveyorScope, quantities, delivery package and payment stagesBill of quantities broken down by room, and the delivery terms
End user or facilities teamInternal layout, hanging heights, drawer configuration, door swingInterior elevation showing what hangs where, and hardware schedule

One person per decision, one name against each line. That single habit removes most of the back-and-forth that appears later as variation cost.

Run three approval gates, not an open-ended review

Our built-in furniture packages move through the same three gates on every project. Each gate has a defined output and a deadline, and each one is answered by the named approver above.

  • Gate 1 — Design intent. Output: approved elevations showing the shaker door layout, overall height and width, and the chosen finish family. At this stage the wardrobe is specified to the space, since sizing, material, finish and layout are all set per project rather than picked from a fixed catalogue size.
  • Gate 2 — Technical confirmation. Output: signed setout dimensions, wall and floor conditions, door type (hinged or sliding), and the internal configuration. This is also where the site team confirms openings, out-of-level floors and anything that sits behind the carcass.
  • Gate 3 — Commercial sign-off. Output: final quantities, confirmed specifications and agreed delivery package. Nothing enters production until this gate is closed in writing.

Keeping the gates separate stops the common failure where a client approves a rendering, then changes the internal layout after production has started. Design approval and technical approval are different documents; we ask for both.

Give each approver something they can physically judge

A shaker profile is a shadow-line detail, and shadow lines do not survive a small screen. Designers approve these doors by looking at the rail width against the panel, and clients decide by holding the finish next to their flooring and paint. We send physical samples for this reason, and we ask that sample review be given a date rather than left open.

Two practical points from projects in Australia, including villa work in Sydney and Melbourne: ship the sample pack early enough to survive customs and internal courier time, and keep the signed sample on site with the setout drawing. When the same physical sample is the reference at both design sign-off and installation inspection, the snag list gets shorter.

Write down what is not yet decided

Approvals fail quietly when open items are left implicit. Put them in an open-points register attached to the approval sheet, with an owner and a date for each. For a wardrobe package we usually carry items such as final timber or laminate tone, handle selection, integrated lighting, soft-close hardware specification, mirror or glass inserts, and whether adjacent joinery is ordered from the same custom kitchen cabinetry batch so the veneers match.

Open-points registers are also where you record anything the product page does not settle for your project — hardware brand, load ratings, fire performance or local code requirements. Those items need confirmation from the supplier and the project's own consultants; do not assume a catalogue listing covers them.

Close the loop at handover

The last approval is the inspection after installation. Walk the wardrobes with the same elevation drawings used at Gate 1, check door alignment and operation, check that internal layouts match the signed configuration, and record anything outstanding as a snag with a date. Our installation and after-sales support covers this stage along with spare parts and replacement, so the same document that opened the job also closes it.

Done properly, the approval process is not extra administration on top of the wardrobe order — it is what makes the order deliverable in one pass.