A swim spa on a hotel site has to work hard. It is used by guests at six in the morning and again after dinner, it sits outdoors all year, and it has to be maintainable by housekeeping and engineering staff rather than a specialist pool contractor. That is why Outdoor Swim Spa WS-PC05ST-L keeps appearing on hospitality procurement lists: it delivers a swim lane, hydrotherapy jets and lighting in a footprint that fits a terrace, a rooftop deck or a garden corner where a full pool would not. The following is how we approach specifying this model for a hotel fit-out, step by step.
Why a hotel fit-out starts with the footprint
In a hotel fit-out the swim spa is not chosen in isolation. It has to sit on a prepared base within an outdoor area that is also carrying circulation, loungers and shading, and it has to be reachable by a delivery route that does not disturb guest operations. The footprint therefore decides feasibility before features do.
WS-PC05ST-L occupies a 5490 × 2400 mm plan area with a 1470 mm shell height — a compact rectangle that fits a rooftop deck, a walled garden corner or a podium terrace where a constructed pool would need structural excavation and a much longer programme.
Where the long variant earns its space
Within our configurable outdoor swim and hydrotherapy range, the WS-PC05ST family shares the same width and depth but differs in length. The catalog dimensions for WS-PC05ST-L are 5490 × 2400 × 1470 mm, against 5000 × 2400 × 1470 mm for WS-PC05ST-S and WS-PC05ST. Those extra 490 mm of length are the whole argument for the -L variant: they give an adult enough water to complete a stroke cycle against the swim training system without constantly stopping at the wall.
In practice we recommend the long variant whenever the spa is sold as a fitness amenity — business hotels, apartment-style serviced residences and resort villas with a wellness pitch. Where the spa is positioned purely as a relaxation or hydrotherapy feature, the standard length frees up deck space for loungers and tends to be the better use of the plot.
What the catalog specification covers
Before any room-by-room coordination, the procurement team needs a fixed equipment list. For this model the catalog shows:
| Model | WS-PC05ST-L |
| Catalog dimensions | 5490 × 2400 × 1470 mm |
| Control system | 1 set |
| Swim training system | 1 set |
| Filter pump | 1 pc |
| Jet total | 6 pcs |
| LED lights | 4 pcs |
| Total power | 6.55 kW |
| Features shown | Water jets, LED lighting, Ozone, Swim training system |
Six jets plus a dedicated swim training set is the configuration that lets one shell serve two very different guest needs: a morning lap session and an evening soak. The four LED lights matter more than they look on paper — an outdoor spa used after dark needs to be lit from inside the water so guests can see the steps, and it doubles as a visual feature for the terrace at night.
One line deserves attention during design coordination: the water pump is not listed in the catalog entry for this model. Treat the pump as an item to confirm with us for your configuration rather than assuming it is included, and do the same for the electrical supply. Total power is shown as 6.55 kW, which is a figure your MEP engineer should verify against the local supply, the chosen heating option and the distribution board before the cable schedule is frozen.
Options to decide at quotation stage
Catalog-listed options for this range include control systems, UV sterilization, water pumps, heat pumps, sand filtration, insulation and steps. Availability and compatibility vary by model, so the list below is what we normally walk through with a hotel buyer — not an automatic inclusion:
- Heat pump. The single biggest factor in whether guests actually use the spa outside peak season. Specify it early, because it affects plant location, noise separation from guest rooms and the electrical load alongside the 6.55 kW base figure.
- Insulation. Relevant for spas in cooler or highly variable climates, where shell insulation changes running cost over the operating life of the asset.
- UV sterilization and sand filtration. Worth pricing against the included ozone and filter pump when the spa is close to guest rooms or dining areas and you want a simpler chemical routine for the maintenance team.
- Steps. A 1470 mm shell height means entry height matters for families, older guests and staff running towel service. Decide whether steps are built into the deck or supplied with the unit, because it changes the surround detail.
Specify on the configuration you will actually receive. Two identical sites can order the same model number with different pumps, heating and filtration, and the maintenance plan follows those choices — not the brochure.
Coordinating the spa with the rest of the fit-out
A swim spa rarely arrives as a standalone purchase on a hospitality project. It sits next to poolside loungers, an outdoor dining set, pergola or louvered shading overhead, and lighting that carries the terrace look into the evening. Ordering these from one supplier keeps finishes matched and puts delivery, installation support and after-sales with a single accountable party.
SANTERSON has operated as a China-based furniture and building materials manufacturer since 2008, supplying project customers in hospitality, villas and offices under turnkey project solutions that run from design and custom/OEM production through door-to-door delivery, installation support and after-sales. The wider swimming pools and swim spas catalogue covers alternative lengths and configurations if the site conditions rule this model out, alongside the outdoor furniture and lighting ranges that finish the same terrace.
Questions we get from hotel buyers
Is this model suitable for a rooftop installation?
The shell is compact enough for rooftop and podium decks, but a filled spa of this size is a heavy structural load with drainage and waterproofing consequences. Structural sign-off from your engineer is required before we can confirm a rooftop position — send us the deck layout and we will work to it.
How does it differ from a swimming pool?
A swim spa gives you a counter-current lane and hydrotherapy jets in a shallow, factory-built shell that can sit above ground on a prepared base. It serves fitness and recovery rather than recreation swimming, and it is far smaller to build and maintain — which is why it suits hotels with limited outdoor area.
Can the specification be changed after the order?
Options such as heating, sterilization and steps should be fixed at quotation stage, since they affect production. Once in production, changes delay the build. Confirm guest-room counts, deck drawings and the electrical supply before we lock the configuration.
If you are specifying a swim spa for a hotel, resort or villa project, send us the model number, your site drawings and the equipment you expect to be included. We will confirm the exact configuration of WS-PC05ST-L for your scheme, together with delivery and installation support as part of the package.