Outdoor Swim Spa WS-S07M is a 7-metre swim and hydrotherapy unit in our configurable range, catalogued at 7000 × 2200 × 1480 mm with 40 jets, three water pumps, one filter pump, ozone, a waterfall and four water columns. Those numbers are the easy part of a specification. The decisions that change how the spa looks after five years of sun, salt and foot traffic are the material and finish choices sitting underneath them. This guide walks through each layer — shell, frame and cabinet, insulation, trim and hardware — and shows what to ask a supplier so two quotations can actually be compared side by side.

Start with the water-contact surface, not the jet count

Jet counts, pump quantities and total power are printed in every catalogue. They also happen to be the specification lines that vary most between configurations of the same model, which is why we always ask buyers to confirm included equipment and electrical requirements for the selected configuration before comparing prices. Materials do not move around like that: once a shell or frame construction is chosen, it stays chosen, and it drives replacement cost, cleaning effort and how the unit reads from the pool deck.

In this range the interior surface is an acrylic sheet. Acrylic is thermoformable, so it takes the stepped bench seating, deep therapy wells and rounded corners that a 1480 mm deep shell needs. It can also be polished if the surface is scratched, which matters on a villa or resort deck where guests walk barefoot across the seating area. When you compare two quotations, ask three things about the shell rather than accepting the word "acrylic":

  • Gauge and backing. Ask for the sheet thickness before forming and how the back is reinforced. A thin acrylic shell over a weak backing bed flexes under load, and flex is what eventually shows up as hairline cracking around jet fittings.
  • Colour and gloss retention. Ask whether the colour runs through the sheet or sits as a surface layer. Through-coloured sheet hides scuffs; a surface-coated finish shows wear first at the steps, where abrasion is highest.
  • Jet and fitting surrounds. Ask how jets, water columns and the overflow are mounted — bonded through the shell, or clamped from behind. Clamped fittings on a flexing shell are where leaks start, and the surround finish is what discolours first when sanitiser levels drift.
A note on how specifications are published: figures such as jet totals and total power are transcribed from the catalogue page for each configuration. They describe that configuration only. Treat them as a starting point for a conversation, not as a promise about the unit you receive.

Frame, cabinet and the finish that faces the weather

The shell holds the water; the frame and cabinet decide whether the spa survives where it is installed. For an outdoor unit on a terrace, in a garden or beside a villa pool, the cabinet is doing the same job as exterior joinery: resisting UV, absorbing temperature swing, and shrugging off chlorinated splash-out. Ask for the actual construction rather than a marketing word such as "weatherproof".

What to specify on the structure

  • Frame material and coating. Ask which frame material is used for your build and what the coating system is. On coastal sites, ask specifically whether fasteners, brackets and jet surrounds are compatible with the frame metal. A coated frame paired with uncoated fixings will stain and pit at the contact points long before the panel finish fails.
  • Cabinet panel substrate. Ask what sits behind the visible cladding — how it is sealed at edges and cut-outs, and whether the sealant is compatible with the cladding finish. Unsealed panel edges are a common route for moisture into an outdoor cabinet.
  • Access design. Equipment access should be removable panel, not crawl-under. On WS-S07M the plant set — three water pumps, one filter pump, control system and ozone — needs routine access without draining anything. Confirm which panels are hinged or removable before the cabinet is colour-matched to a terrace scheme.

Matching the cabinet to your deck

Because we manufacture furniture and building materials as well as spas, cabinet cladding on this range can be coordinated with the surrounding scheme rather than ordered as a fixed grey box. In practice that means choosing a cladding finish and hardware tone in the same review as the outdoor furniture, wall panels and paving around the spa. For projects already specifying outdoor furniture collections — aluminium frames with rope weave, wicker or teak-look tops — matching the cabinet cladding tone to those pieces keeps a 7-metre shell from reading as an industrial object dropped into a designed space. Ask us for the available cladding and trim options at quotation stage; finish availability changes with production runs, so we confirm it case by case.

Insulation, heat pump and the cost of a decision deferred

Total power is listed as 10.75 kW for the WS-S07M catalogue configuration. What that figure translates into on an electricity bill depends heavily on how the shell and cabinet are insulated and whether a heat pump is specified. Insulation appears in the catalogued options list alongside UV sterilisation, additional water pumps, sand filtration and steps — which means it is easy to leave off a first quotation and costly to add after the unit is installed.

  • Ask whether insulation is applied to the shell, the cabinet cavity, or both, and what material and thickness are used in each location.
  • Ask whether the quoted total power includes a heat pump. A unit quoted with and without one looks like two different products on paper; normalise the comparison before judging price.
  • Ask how the insulation is protected from splash-out and cleaning chemicals at the base of the cabinet, where a sealed but unshielded layer absorbs water over years.

If you are weighing an insulated outdoor spa against a covered indoor installation, our guide to a customizable shape outdoor spa covers how shape and siting choices interact with the same shell and reinforcement decisions.

Comparing WS-S07M against nearby configurations

The value of a materials comparison only becomes clear when you line the specification up against the model you would otherwise buy. All three units below are catalogued configurations from the same range, so differences in shell depth and jet layout tell you something concrete about how each is meant to be used.

Catalogued configurationCatalogue dimensionsJet totalListed features
Outdoor Swim Spa WS-S07M 7000 × 2200 × 1480 mm 40 Water jets, LED lighting, ozone, waterfall, 4 water columns
Outdoor Swim Spa WS-S07B 7000 × 2200 × 1335 mm 48 Water jets, LED lighting, ozone, waterfall
Outdoor Swim Spa WS-S07B-T 7000 × 2200 × 1365 mm 44 Water jets, LED lighting, ozone, swim training system

Read the table as a use-case question rather than a ranking. The deeper 1480 mm shell of WS-S07M with four water columns suits a spa used standing and for seated therapy, while the shallower 7000 mm variants spread their jet totals across other body positions — and WS-S07B-T is the one of the three whose catalogue page lists a swim training system. If lap swimming drives the purchase, confirm the swim system specification in writing before you compare cabinet finishes at all; if hydrotherapy and entertaining drive it, spend your attention on the shell seating, the waterfall arrangement and how the cabinet finish will hold up beside your deck.

A procurement checklist for the enquiry

Send these six items to every supplier you are quoting, including us. The point is not to sound technical — it is to make three quotations comparable on paper instead of discovering differences after delivery.

  1. The configuration you want quoted, with included equipment and electrical requirements written out, not assumed.
  2. Shell material, thickness and backing construction for that configuration.
  3. Frame and cabinet construction, coating system, and the fastener and trim metals used at the contact points.
  4. Insulation location, material and thickness, plus whether a heat pump is inside or outside the quoted power figure.
  5. The cladding and hardware finish options available for your order quantity, with samples rather than colour names.
  6. Delivery and site-readiness scope: what arrives, what the site must provide, and who sets the unit. Our logistics and door-to-door delivery service covers freight and paperwork; on-site preparation is confirmed per project.

If the spa is one line in a larger villa or hospitality package, coordinating it through turnkey project delivery means the cabinet finish, the surrounding outdoor furniture and any adjacent wall cladding are specified once instead of reconciled across three separate orders.

Frequently asked questions

Does WS-S07M include a swim training system?

The captured specification for this configuration does not list one, so we do not assume it. If swimming is a requirement, tell us at enquiry stage and we will quote the configuration that lists a swim training system.

Can the cabinet be matched to my terrace or deck scheme?

Cabinet cladding and trim can be coordinated with the wider project palette, subject to what is available for your order at quotation time. Request samples rather than approving a colour name from a screen.

Are the jet count and power figures fixed for this model?

They are catalogued values for one configuration of WS-S07M. Optional items in the catalogue — control systems, UV sterilisation, additional water pumps, heat pumps, sand filtration, insulation and steps — change what is installed, so confirm the exact build before signing.

Send your siting details, desired configuration and finish references to our team and we will return a specification sheet you can place beside two competing quotations. As a furniture and building materials manufacturer working on villa and hospitality projects, we can also quote the outdoor furniture, cladding and finishes that surround the spa in one package.