A pull out laundry hamper looks simple on a drawing: two or three baskets behind a cabinet door, on slides. In production it is one of the easiest built-in items to get wrong, because the basket, the runner, the door and the ventilation all have to agree with each other. Below is the checklist we ask project teams to settle before custom Pull Out Laundry Hampers go into manufacturing.

1. Confirming production scope: the room condition comes before the cabinet size

Most of these units are specified for residential bathroom projects, where the wall they sit against is rarely straightforward. Before we cut anything, we need the finished dimensions on site, not the structural ones: tiled depth, the position of waste and water outlets, any soil pipe or isolation valve that sits inside the carcass zone, and the door swing of the room itself. A hamper column planned into a bathroom alcove also has to leave clear space for the cabinet door to open with baskets loaded.

Send us the room layout or at least a set of on-site measured dimensions with finish build-up noted. Where drawings and site disagree, we confirm which one governs before production starts.

2. Baskets to produce: count, capacity, material and how they come out

  • Number of compartments — a single basket, or separated sorting (for example lights, darks, and towels). Sorting changes the carcass width and the divider positions.
  • Basket capacity and depth — deep baskets hold more but need taller pull zones; shallow banks suit under-counter positions.
  • Basket material and liner — metal frame with fabric liner, or rigid basket. Liners need to lift out for washing, so we confirm whether they are removable or fixed.
  • Access type — full-extension slides on the baskets themselves, or a door-mounted bank that swings forward. This decides the runner load rating and the clearance behind the door.

3. Runners and load rating to confirm before production

A loaded hamper is heavier than it looks, and the load moves. We confirm the extension length, whether slides are soft-close, and the runner series' rated load for the basket size chosen. Where a project needs long travel in a narrow carcass, we say so at quotation stage rather than substituting a shorter runner later.

4. Ventilation and odour control — decide before the door is made

A sealed cabinet holding used linen will hold odour. We confirm whether the door carries louvres or perforation, whether the rear panel is vented, and how that relates to any bathroom exhaust path. This decision changes the door construction, so it cannot be left until production.

5. Finish and door style to confirm before the units are produced

The Pull Out Laundry Hampers in our Laundry Integration collection are made to measure, with material and finish options specified per project. To keep the bathroom joinery consistent, we match the door to the vanity or wardrobe fronts already on the schedule: same substrate, same lacquer or melamine system, same handle or handleless detail. If the hamper is part of a wider fit-out, we cross-reference it against Laundry & Storage Combo and Compact Laundry Solutions so door heights, plinth lines and reveals repeat across the room.

6. Where these confirmations sit in the production programme

Item to confirmWho confirms itWhen
Finished on-site dimensions and services positionsBuyer / site teamBefore quotation
Basket count, capacity and liner typeBuyer / designerAt design proposal
Runner series, extension and soft-closeSANTERSON + buyerBefore detail confirmation
Ventilation method and door constructionBuyer / designerBefore detail confirmation
Door finish matched to vanity or wardrobe frontsSANTERSON + designerBefore production
Packaging, container loading and delivery addressSANTERSON logistics coordinatorBefore shipment
One point worth settling in writing: our Laundry Integration items are made to measure for each project, so the dimensions and selected specification on the approved drawing are what we manufacture to. Changes after production starts affect both the unit and the schedule.

7. Production, delivery and installation sequence

Once the drawing is approved, the units are produced at our China factory and shipped with packaging and container loading arranged by our logistics team, including the freight paperwork for import. On site, we support installation and inspection so slides, doors and self-closing mechanisms are signed off before handover — the snag list on a hamper bank is nearly always door alignment and slide action, which is quicker to fix while the joinery is still uncovered.

What we need from you to start production pricing

Send us the room drawing, the number of compartments you need, and the finish schedule for the surrounding joinery. We will come back with a proposal covering carcass size, basket configuration, runner selection and matched door finish — and flag anything in the drawings that needs a site check first.

Talk to our project team about custom laundry integration for your bathroom or apartment package: https://www.santerson.com/contact/