Open modular wardrobes read beautifully on a rendering: no doors to fight, storage laid out in the open, and a run of carcasses that can be sized to almost any bedroom wall. That same openness is exactly why they need more sign-off attention than a closed wardrobe. Before your project team approves the package, work through the confirmations below — the ones that decide whether the installation goes smoothly or turns into a snag list.

What "open modular" actually means in our catalogue

Our Open Modular Wardrobes sit within the Modular Wardrobes collection for residential projects. Each run is made to measure, with material and finish selected per project and a layout tailored to the room — which means the approval stage is where those choices get locked down, not guessed at.

1. The measured opening, not the drawing dimension

Modular carcasses are built to the dimensions your team confirms. Before approval, ask which numbers were used: architectural drawing sizes, or a site re-measure of the actual opening once flooring, ceiling linings, skirting and any wall packing are complete. Runs that meet a fitted ceiling, a recess, a beam or an uneven floor need those conditions recorded on the shop drawing.

  • Who took the final measurements, and when in relation to wet trades and floor finishes?
  • Are out-of-plumb walls and floor levels noted, with scribing or packing agreed?
  • Is total run length, height and depth confirmed for every module position?

2. Interior configuration, room by room

An open wardrobe shows everything, so the internal layout has to be right at the first attempt. Confirm hanging lengths against actual garment heights, shelf spacing against stored items, and drawer positions against what will realistically go in them. Where a project needs mixed storage rather than one repeated module type, our Combination Modular Wardrobes and Drawer Focused Modular Wardrobes cover hanging-dominant and drawer-dominant zones inside the same make-to-measure system.

  • Hanging areas split into short-hang and long-hang, with rail heights marked on the elevation?
  • Shelf depths and clear openings checked against luggage, boxes and folded stacks?
  • Drawers specified at the heights people actually use, rather than stacked by default?
  • Lighting provisions, if required, agreed before panels are cut?

3. Finish and material selection in writing

With no door front to set the tone, the carcass edge, interior panel and any open frame become the visible design. Confirm the exact board, edge treatment and finish for both exterior and interior faces, and match them against adjacent joinery — vanities, wall panelling and kitchen cabinetry on the same project should be specified together so tones do not drift between trades.

  • Finish reference confirmed on a physical sample or swatch, not a screen render?
  • Interior face finish specified explicitly, since it stays fully exposed?
  • Edge detail agreed for visible module ends?

4. Housekeeping and wear expectations

Open storage collects dust and shows clutter far sooner than closed doors do. Hold that conversation with the client before approval, not after handover: who maintains the pieces, how often, and whether some zones should still be closed or dressed with boxes and trays. In rental or shared use, an open layout also puts more wear on rails and shelf edges, so hardware specification and fixing details carry more weight.

5. Anchoring, wall conditions and interface trades

Tall open runs transfer load and overturning force straight into the wall, so the fixing method must be confirmed against the real substrate — masonry, stud partition, or a lined wall with limited fix depth. Get the wall build-up onto the drawing, and agree how the wardrobe meets skirting, architraves, curtains and lighting, so each trade knows the tolerance it is working to.

6. Sequence, delivery and the installation window

Built-in joinery arrives late in a programme and blocks no other trade, which makes it the first line cut when a schedule slips. Confirm the production slot, the shipping arrangement and who installs on site. As a custom furniture manufacturer handling logistics and door-to-door delivery as well as installation and after-sales support, we carry the chain from shop drawing to handover — but the site-readiness date still comes from your programme.

  • Approval deadline set backwards from the required install date, allowing for production and transit?
  • Storage on site agreed for deliveries that land early or in stages?
  • Snag and sign-off route named before the first module is fixed?

7. Documentation to hold at approval

A clean approval pack prevents most disputes later: signed elevations with every dimension, the finish schedule with references, the interior layout drawing for each wardrobe, confirmed fixing details, and a clear note of anything excluded from scope. If other units in the same development use Glass Modular Wardrobes or open walk-in rooms, keep one schedule per unit type so variations are tracked rather than assumed.

Open modular wardrobes reward preparation. Send us the room dimensions, the wall build-up and how each bedroom will be used, and we will return make-to-measure layouts, finish options and a configuration your team can approve with confidence.