A matte acrylic wardrobe rarely fails because of the door panel alone. It fails on the paperwork behind it: an opening measured once instead of twice, a finish named in words rather than by sample, a carcase left open to whoever quotes first, and hardware described as "soft close" with nothing written down about what that actually means for this run of doors. If you are sourcing these wardrobes from a manufacturer overseas, the specification sheet is the single document that decides whether the delivered joinery matches the drawing you approved.
The Matte Acrylic Wardrobes we supply are made to measure, with the finish, layout and dimensions specified per project. That flexibility is an advantage only when the specification carries enough detail to be produced consistently. Below is the structure we ask buyers, designers and builders to work through before a quotation is requested.
Start With the Room Data, Not the Door Colour
Finish selection is the last decision, not the first. Begin with the constraints that will shape everything else, because each one changes the panel build, the hardware set and how the unit has to be delivered.
- Floor to ceiling height at more than one point. Record the finished floor level and note where it varies. A run that is 2,400 mm at one end and 2,435 mm at the other needs either a scribed filler or a cut carcase, and that choice belongs on the drawing.
- What sits above and beside the run. Ceiling cornices, bulkheads, skirting, light switches and door reveals all consume depth. State whether the wardrobe butts into the reveal or is set back from it.
- Wall construction. Stud walls, brick and render, and tiled surfaces take fixings differently. Note which faces are load-bearing and where the top fixing rail can be anchored.
- Access route on site. Lift dimensions, stair width, corridor turns and the final carrying path determine whether a full-height side panel arrives as one piece or is split with a connector. Splitting is not a defect; it is a delivery decision that must appear in the specification before production.
Specify the Carcase Separately From the Door
Matte acrylic is a door and panel finish. It says nothing on its own about the box behind it, and this is where quotations stop being comparable. Two suppliers can quote the same door colour and deliver completely different wardrobes.
| Item | What to write down | Why it matters at quotation stage |
|---|---|---|
| Carcase material | Board type, thickness and edge treatment by face | Determines load behaviour on long spans and how edges look when a door stands open |
| Shelf span and thickness | Clear span for each shelf, and where a mid-span support is required | A 900 mm shelf and a 1,200 mm shelf are not the same line item |
| Back panel | Thickness, fixed or housed, and whether it is visible in any open bay | Affects racking, wall fixing method and how the unit squares up on site |
| Interior finish | Whether interior faces match the exterior colour or default to a standard tone | Open shelving and glass-fronted bays expose the interior; matching it is usually a priced option |
| Plinth or recessed base | Height, recess depth, and whether the plinth is continuous or cut around obstructions | Set by the finished floor level and any underfloor services |
A practical rule: if a line item cannot be compared across two quotations without a phone call, it is not specified yet.
Name the Matte Finish by Sample, Not by Word
"Matte grey", "soft touch white" and "matt charcoal" are descriptions, not specifications. Similar names cover different sheen levels, undertones and surface textures, and a matte surface reads very differently under warm bedroom lighting than under cool corridor lighting.
For each colour in the run, record:
- The supplier's own finish reference or code, copied exactly as they publish it — not a trade name you have adopted internally.
- A physical sample assessed on site, against the actual wall and floor finishes, at both day and artificial light.
- Which surfaces carry the matte face: door fronts only, or also drawer fronts, open shelving, end panels and any tall mirror or glass-adjacent trim.
- Direction of grain or texture where relevant, so panels from different batches align when installed side by side.
Where a project mixes finishes within one built-in run — matte fronts paired with a Two Tone Acrylic Wardrobe detail, or acrylic fronts combined with glass in a Glass & Acrylic Combination Wardrobe — specify each transition explicitly. Show which element carries which finish, and how the two meet at the joint.
Set Out the Interior Layout Against How the Space Is Used
Interior configuration is where a wardrobe earns its keep day to day, and it is also the cheapest place to overbuild. Hang heights should follow the actual garment mix rather than a default template.
Hanging zones
- Single hang for shirts, jackets and folded-on-hanger items; double hang for shorter garments in a compact run.
- A dedicated long-hang bay for coats, dresses and garment bags — worth committing to at drawing stage rather than adding later.
- Pull-down rails make high hanging reachable, but they add a mechanism that must be rated for the width of the opening it sits in.
Drawers, shelves and open bays
- Drawers suit folded clothing and small items; shelves suit bulk and stored linen. Count what you actually store before fixing the ratio.
- Decide drawer depth per bank: shallow for accessories, deep for knitwear. A uniform set of identical drawers is usually wasted travel.
- Open bays display, so their interior finish and edge detailing need to be specified at the same standard as the doors.
Where a bedroom needs storage that reads as architecture rather than furniture — floor-to-ceiling runs integrated with wall panelling or niche details — that is a design-coordination conversation, and our Interior Design Services cover space layout planning, drawings and production coordination for exactly this kind of built-in work.
Hardware Belongs in the Specification
Hinges, slides and handles are frequently treated as a supplier default, then discovered on site. Each one is a decision with a cost and a service consequence:
- Hinges: inset, overlay or full-overlay determines the reveal between doors and how much clearance an open door needs against a bed or wall.
- Soft close: state whether it applies to every door and drawer in the run, and on which sizes. A soft-close mechanism sized for one door weight is not interchangeable with another.
- Drawer slides: side-mounted and undermount slides behave differently under load, and full-extension matters when the drawer is the only way to reach the back of a deep carcase.
- Handleless or handle: handleless fronts need a profile, jig or motorised mechanism that must be agreed before the panel is cut. Retrofitting is not equivalent.
- Integrated lighting: if open bays or interior drawers are to be lit, specify the fitting, its switch or sensor, and where the transformer sits — this needs a cable route decided during production, not after installation.
Fix the Verification Steps Before Production Starts
Made-to-measure joinery carries one obvious risk: the numbers on the drawing are not the numbers on the finished building. Build these checkpoints into the programme.
Pre-production checklist
- Site re-measure taken after the finished floor level, plasterboard and fixings are complete — not at frame stage.
- Approval drawing showing every elevation, with heights, opening directions and reveals dimensioned.
- Finish confirmed against a physical sample reference held on file by both parties.
- Hardware schedule listing each item, its quantity and the opening it applies to.
- Delivery method agreed: assembled or flat-packed, panel splits, and the carrying path on site.
For buyers coordinating wardrobes alongside other joinery and finishes, our Custom & OEM Service covers bespoke material finishes and textures, prototyping and flexible order quantities, so a wardrobe run can be produced to the same finish standard as the kitchen or vanity cabinetry in the same building. Freight and door-to-door delivery are arranged through Furniture Logistics and Door-to-door Delivery. On-site installation and snagging sit under Furniture Installation and After-sales Support; confirm the scope available for your site before the order is placed.
The Specification Is the Negotiating Document
A clear specification does more than protect quality. It makes quotations comparable, exposes the lines where a low price is hiding an omission — an unmatched interior, a thinner shelf, default hinges — and removes most of the variation orders that appear after delivery. If you are preparing a wardrobe enquiry for a villa or apartment project, send the room data, the finish references and the hardware schedule together; we can then quote against your drawings rather than against assumptions.
Send us your drawings. Share elevations, measured openings and your preferred matte finish reference, and we will return a quotation itemising carcase, interior layout and hardware line by line — including any panel splits required by the site access route.
Contact: PHILLIP | Phone / WhatsApp: +86-13928214007 | Email: santerson@qq.com