Wardrobe Specification & Approvals

A wooden sliding door wardrobe looks simple on a rendering. It is the drawings, track details and finish samples behind that image that decide whether the unit works for years — or becomes a snag list item at handover.

Sliding wardrobe doors are a common answer for bedrooms where a hinged door would fight with the bed, a bedside table or an en-suite entry. Because our Wooden Sliding Door Wardrobes are made to measure for each project, almost everything that follows is a decision the project team has to make before we start production. Approval drawings and finish samples are issued so you sign off what will actually be built — not a rendering.

1. Confirm the opening with finished dimensions, not architectural ones

Sliding doors need the opening to be square, plumb and at a known height, because the panels travel on a track that cannot absorb much out-of-tolerance wall. Before you approve a wardrobe schedule, ask the site team to confirm:

  • The finished floor level under the wardrobe zone, including any screed, tile or flooring build-up that will be laid after the unit is measured.
  • The finished ceiling or soffit level, and whether a cornice, skirting or shadow gap is expected to run through the unit or stop at it.
  • Wall plumbness across the full width of the run. A long bedroom wall that leans changes the panel overlap and can leave visible gaps at the head.
  • The position of sockets, switches, air-conditioning returns and bedside lighting relative to the door travel path.

Send us the opening as a set of finished dimensions — width at high, middle and low points; depth at both ends; height at both ends. We build to those figures rather than to a nominal module, so a 20 mm difference across a run is a site correction question, not a production guess.

2. Decide the door configuration before the layout is drawn

The number of panels and how they stack changes both the joinery detail and what you can store behind each bay. Two-panel units are the usual choice for a standard bedroom frontage; three or four panels suit wider runs but need enough track length for the stack. When you review the layout, check that:

  • The internal layout — hanging rail heights, drawer zones, shelf bays and any full-height mirror or glass insert — is drawn behind the correct panel.
  • Drawers and pull-out hampers clear the opposite panel when the door is only partly open. This is the most common regret in a sliding wardrobe.
  • The overlap between panels is shown on the elevation, so you know how much of the opening is usable at once.
  • Corners are resolved deliberately. If the bedroom needs a return, an L Shaped Corner Wardrobe arrangement is usually easier to live with than forcing a sliding front around a right angle.

3. Lock the material and finish on a physical sample

Within the same sliding-door collection we offer Matte Sliding Door Wardrobes and High Gloss Sliding Door Wardrobes; all of them are specified from material and finish selections rather than a fixed catalogue colour. Screen proofs are not enough for a bedroom frontage that will be read in both daylight and warm artificial light. Before approval:

  • Request a physical sample of the door face and, where relevant, the edge treatment and any handleless profile.
  • View the sample against the actual wall paint, flooring and bedding palette of the room type it belongs to.
  • Agree which surfaces carry a protective film during delivery and how it is removed on site.
  • Record the finish reference in the approval sheet, so later units in the same building match the first one.

For apartment and villa programmes that repeat the same bedroom type, we keep the confirmed specification consistent across batches and confirm dimensions for each individual opening, since room sizes often vary floor by floor.

4. Agree the hardware behaviour you want

The track and runner set decide how the door feels every day, and they are the part most likely to be value-engineered out without anyone noticing. Ask for the sliding system to be stated in the quotation, together with:

Item to confirmWhy it matters at handover
Top-hung or bottom-rolling systemDetermines whether a floor track collects dust and whether the head fixing needs structural support.
Soft-close or dash-pot stopsRemoves the door banging into the frame in hotel and rental bedrooms; usually specified per panel.
Panel weight allowanceThicker timber-look and veneer fronts are heavier than laminate; the runner must be rated for the finished panel.
Track cleaning accessA recessed floor track needs a maintenance method the housekeeping or owner can actually perform.
Door face optionTimber, gloss, mirror and glass fronts sit in the same collection but change weight and fixing detail.

5. Check the interface with the rest of the room

Wardrobe problems are rarely wardrobe-only problems. A frontage that reads as a wall — flush skirting, continuous cornice, aligned reveals — depends on decisions made by other trades. Where the design calls for a seamless built-in look, coordinate it with the partition and panel line, and confirm who supplies the infill panels to the head and returns. In our range this is also where Wooden Sliding Panels come in: the same timber language can carry across room dividers and closet fronts so a scheme does not stop at the wardrobe edge.

Two site questions are worth answering in writing before production is released:

  • Which trade prepares and finishes the opening, and by what date must it be ready for measurement?
  • What is the sequence — flooring first or wardrobe first? Both are workable, but they change the base detail.

6. Confirm what you are signing

Approval checklist before release to production

  • Finished dimensions of every opening, taken on site after the relevant finishes are set out.
  • Elevation drawings showing panel count, overlap, stack direction and reveal at head and jamb.
  • Internal layout with drawer and hanging clearances checked against part-open doors.
  • Signed physical finish sample with its reference recorded.
  • Sliding hardware stated by type, including soft-close allowance per panel.
  • Interface responsibilities for skirting, cornice, infills and the prepared opening.
  • Delivery route, lift or stair access, and the installation window agreed with the site programme.

If a single item on that list is still open, the wardrobe is not ready for approval — it is ready for one more coordination meeting, which costs far less than re-making a panel.

How we support the process

SANTERSON has manufactured furniture and building materials since 2008 and works with villa, apartment and hospitality projects on a one-stop basis: space planning and design coordination, custom and OEM production, manufacturing quality control, logistics and door-to-door delivery, plus installation and after-sales support. For wardrobe packages we can also produce matching kitchen cabinetry, vanity units and media walls in the same finish family, which keeps bedroom and bathroom joinery consistent across a building. Our Custom Minimalist Bedroom Wardrobe line covers handleless, flat-panel schemes where the frontage should disappear into the wall.

Send us your wardrobe schedule

Share the bedroom elevations, opening dimensions and finish direction, and we will return shop drawings and a material selection for your review before anything enters production. Contact PHILLIP by phone or WhatsApp on +86-13928214007, email santerson@qq.com, or use our contact page.