A glass front aluminum frame cabinet looks simple on a drawing and complicated on site. Before production starts, the buyer and the factory need agreement on the frame profile, the glazing, the carcass behind the glass, the hardware and the way the units will be measured, packed and installed. This article lists the points to lock down, using our own Glass Front Aluminum Frame Cabinets as the reference product.
1. The drawings and site dimensions you are actually producing to
Made-to-measure cabinetry fails at the handover between design and site, not on the production line. Before any cutting starts, we ask a buyer to confirm:
- Who measured the opening, and when. Walls, floors and ceilings in new builds are rarely square, so a drawing based on architectural plans alone is not a production document.
- Final floor and wall finishes. A tiled floor or a back-render changes clear heights by centimetres, and glass front units show that gap immediately.
- Appliance schedule with model numbers and rough-in positions for ovens, dishwashers, refrigeration and extraction.
- Services routes: water, waste, power points, and where the electrician needs access plates behind glazed sections.
- The drawing revision number on the purchase order. Every unit we produce is marked with that revision so a late change is visible rather than absorbed.
2. Frame profile, colour and how it meets the panel
The aluminium frame is the visual signature of this cabinet type, so its specification has to be decided rather than assumed:
- Profile width and depth on the door face, and whether the same profile runs on all four sides or stops at a shadow gap.
- Surface treatment and colour. Powder coating is the usual finish for kitchen frames; the sample swatch, not a screen image, should be signed off, because metallic and bronze tones shift under warm LED lighting.
- Corner construction of the frame — crimped, mitred or welded — which affects both appearance at the joint and long-term squareness.
- Glass rebate depth and gasket or setting-block detail, so the pane is seated and not left bearing on bare metal.
Where a project mixes glazed and solid doors in one run, we produce them from the same profile family. Our Aluminum Frame with Solid Panel is specified that way, so the frame line stays identical between display doors and closed doors.
3. The glass itself
"Glass front" covers several very different panes. Confirm each of these in writing:
| Item | What to decide | Why it matters |
|---|---|---|
| Glass type | Clear, frosted, smoked or ribbed/laminated | Sets how much of the cabinet interior is visible and how fingerprints read |
| Thickness | Pane thickness matched to rebate and door size | An oversized glazed door with a thin pane flexes and rattles |
| Edge treatment | Polished, seamed or bevelled; coloured edge vs clear | Edges are visible through an aluminium frame with no moulding to hide them |
| Safety requirement | Toughened or laminated where local practice and the location demand it | Overhead glazed units and doors near walkways carry different risk than base units |
| Interior finish behind the glass | Carcass colour, back panel, shelving material, integrated lighting | Glass turns the interior into the visible surface; a cheap cabinet interior becomes the feature |
Frosted and smoked glazing are common where a project wants display depth without showing contents. The two closest variants in our range, Frosted Glass Aluminum Cabinets and Smoked Glass Aluminum Cabinets, are specified on the same made-to-measure basis, so a buyer can switch glazing late without changing the frame or carcass specification.
4. Carcass, shelving and hardware behind the display
- Carcass material and board thickness, edge banding colour on all four edges, and whether the visible side panels match the door line.
- Shelf span and load. Glass-front units are often loaded with glassware and crockery; shelf depth and support spacing should follow that load, not a default grid.
- Hinge type and opening angle, plus soft close on both hinge and runner where specified.
- Handle strategy: profile-integrated pull, edge pull or push-to-open. A handle fixed to an aluminium frame needs the correct fixing pitch agreed before extrusion cutting.
- Lighting: colour temperature, driver location, and how the driver is reached for service. Recessed strips behind a glazed door must be specified with enough clearance for the door thickness.
5. Samples, first article and sign-off
For a run of custom glass front aluminum frame cabinets we settle three things before volume production: a signed frame-and-glazing sample, an approved door elevation with the revision number, and a written note of everything excluded from the price. The sample is checked under the same light temperature planned for the kitchen, because that is where the colour will be judged.
6. Packing, delivery and installation sequence
- Glazed doors packed separately from carcasses, with the pane restrained and framed, so transit damage is contained to a replaceable item.
- Pallet and carton marking that matches the room-by-room unit schedule, so an installer on site can find each module without opening everything.
- Delivery stage agreed against the site programme: glass front units should arrive after wet trades and flooring are complete.
- Who levels and fixes the run on site, who glazes, and who signs off snags — the same split we work to on our villa and hospitality projects, where production, logistics and installation follow one coordinated plan.
A short pre-production checklist
- Site re-measure signed, with finishes fixed.
- Frame profile, colour swatch and corner method approved.
- Glass type, thickness, edge, safety specification and interior finish confirmed.
- Carcass, shelving, hinges, runners, handles and lighting listed by item.
- Appliance and services drawings matched to the elevations.
- Sample and first-article sign-off completed against a revision number.
- Packing method, unit schedule, delivery stage and installation responsibility agreed.
SANTERSON produces aluminium frame kitchen cabinetry made to project dimensions, with finish, layout and glazing specified per project. Send us your elevations and site measurements and we will return a specification sheet listing exactly what is included before production begins. Enquiries: contact SANTERSON.
Product dimensions, glazing options, finishes and hardware are confirmed project by project; specifications shown on product pages are indicative rather than fixed.