Open storage looks simple on a drawing. A shelf, a recess, a run of carcasses — and then three suppliers quote it three different ways. If you are specifying bathroom joinery for a villa or apartment package, the difference between proposals usually sits in what was not written down. Here is how we compare samples and quotations for Santerson Open Storage, and what you should ask any supplier to put in writing before you sign.
Start with the same brief, not the same picture
Most comparison mistakes happen before the first quotation arrives. A buyer sends one reference photograph to several factories and receives three interpretations back. Santerson Open Storage is a configurable item in our Storage Units range: layout, dimensions, material and finish are set per project rather than chosen from one fixed model. That flexibility is the point of the product, but it also means two quotations can look identical on a bill of quantities and describe different furniture.
Before requesting prices, issue one written specification that fixes four things: the room-by-room dimensions you want met, the items in each run, the finish for every visible surface, and the interface with adjacent work — vanities, wall panelling, tiling, mirror cabinets. Then require every supplier to answer that same document line by line. If a bidder changes something, they should flag it as a deviation instead of quietly pricing an easier version.
What a sample should actually prove
A full-size sample is expensive, so make it earn its cost. For open storage, one representative bay tells you more than three small finish boards, because the things that go wrong are structural and visual at once. Ask for the sample in the exact configuration you intend to order: same carcass material, same edge treatment, same shelf thickness, same finish build-up, same hardware.
- Edges and interiors. Look at the top and bottom edges of open shelves and the inside faces of side panels. These are the surfaces you see every day from a bathroom doorway, and they are the first places a low-cost quotation saves money with thin edging or an unfinished interior.
- Finish build-up. Check the colour and sheen on a curved or return edge, not just the flat face. A sprayed finish can read evenly on a sample board and show pale edges on a routed profile.
- Shelf deflection. Load the sample shelf with what it will actually hold — towels, glass bottles, baskets — and look at it from eye level across the room. A span that is acceptable in a catalogue photo may not be once you can see it in place.
- Fixings and adjustability. Ask how the unit attaches to the wall, whether shelves are adjustable after handover, and what packing or shim allowance exists for out-of-plaster walls. Site tolerance is normal; the design should absorb it.
- Interface detail. Where open storage meets a vanity top, tile return or panelling joint, look at how the sample handles that junction. A mitred return, a shadow gap and a silicone joint are three different answers with three different costs.
Reading the proposals side by side
Once samples come back, put the quotations in one table. Price per item is only the last column; the columns that decide value come first. Below is the comparison sheet we suggest to project buyers.
| Item to compare | What a complete answer looks like | Warning sign |
|---|---|---|
| Scope of supply | Every open-storage run listed by room, with dimensions, and a note on what is excluded | A single lump sum for "bathroom joinery" |
| Carcass and shelf material | Named board type and thickness for carcass, shelves and back panel | "As per standard production" with no specification |
| Finish system | The finish process described for faces, edges and interiors, with a signed sample reference | A colour name only, no build-up detail |
| Hardware | Bracket, runner or hinge type and brand where applicable, plus load rating | "Hardware included" without a schedule |
| Made-to-measure basis | Which dimensions are fixed by the drawings and which are confirmed from site survey | Pricing that assumes site sizes are already final |
| Coordination with other trades | Who sets out the wall, who supplies the tile return, who seals the joint | Silence on interfaces between packages |
| Delivery and packing | Pack list per unit, container or crate loading plan, marked room labels | Loose loading with no room identification |
| Installation support | Fixing detail drawings, sequence on site, snag process after fitting | Installation quoted as "on site to prepare" |
Where the real price difference hides
Two proposals for the same open-storage specification can differ by a wide margin and still both be honest. The gap usually comes from one of five places: whether return lengths and end panels are priced as made items or dismissed as site carpentry; whether the finish is applied to all faces or only visible ones; whether hardware load ratings were engineered for the shelf spans; whether packing is designed for long-distance freight or for a domestic delivery run; and whether drawings were produced by the factory or lifted from your tender pack. Ask each bidder to state their assumption on those five points, then re-price against one common answer.
If you are sourcing storage alongside other bathroom fixtures, compare the whole package rather than the single line item. Open shelving rarely sits alone — it meets Santerson Corner Storage at a return, and often continues as Freestanding Open Wardrobes in an adjoining dressing area. One supplier producing all of it in one batch keeps carcass material, finish batch and edge detail consistent across rooms; three suppliers doing it separately will not.
A short pre-award checklist
- Every open-storage item on the drawings has a matching line in the quotation, with room and dimension.
- Carcass, shelf and back-panel materials are named with thicknesses.
- Finish is referenced to a signed sample, including edges and interior faces.
- Hardware types and load ratings are scheduled, not assumed.
- Site survey points are listed, and the quotation says what happens if as-built sizes differ.
- Interfaces with vanities, tiling, panelling and mirror cabinets are assigned to a named party.
- Packing, labelling and loading plan are described for the actual destination.
- Fixing drawings, installation sequence and snag process are included in the award scope.
As a one-stop furniture and building materials supplier, we handle this comparison from the factory side: made-to-measure configuration, finish samples for sign-off, coordinated production with vanities, wardrobes and panelling in the same batch, then packing labelled by room for site installation. Send us your drawings and the specification you issued to bidders, and we will return a line-by-line proposal you can put next to the others.