A swim spa is not a single product you order from a catalogue. It is a shell, a pump set, a control system, a heat source and a site condition that all have to meet at the same week in the build programme. The Outdoor Swim Spa WS-115AⅢ is one of the more configurable units in our range, which is exactly why supplier capability matters more than the model name on the datasheet. Below is the checklist we suggest you take into your next supplier conversation, whether or not you end up working with us.
Start With What "Configurable" Actually Means
The WS-115AⅢ family shares a shell size while the equipment behind it changes. The catalogue entry for WS-115AⅢ lists overall dimensions of 3880 × 2200 × 1250 mm, one control system, one swim training system, one water pump, one filter pump, 24 jets in total and four LED lights, with a total power figure of 8.05 kW. The closely related WS-115AⅢ-U shares the same 3880 × 2200 × 1250 mm shell, but lists four water pumps, 23 jets, one LED light and 11.85 kW total power, with no swim training system recorded.
Same footprint, different electrical load, different jet layout, different swimming function. That difference is not decoration: it changes the supply you need from your electrician, the pump room or cabinet space, and how the unit behaves once somebody is actually using it. A supplier who cannot walk you through why those two variants differ is quoting from a price list, not engineering a solution.
| Item | WS-115AⅢ (catalogue) | WS-115AⅢ-U (catalogue) |
|---|---|---|
| Shell dimensions | 3880 × 2200 × 1250 mm | 3880 × 2200 × 1250 mm |
| Swim training system | 1 set | Not listed — confirm before ordering |
| Water pump / filter pump | 1 pc / 1 pc | 4 pcs / 1 pc |
| Jets | 24 pcs | 23 pcs |
| LED lights | 4 pcs | 1 pc |
| Total power | 8.05 kW | 11.85 kW |
Figures above are transcribed from the catalogue pages for these two models. Treat them as a starting point for your own specification sheet, and confirm the configuration you intend to buy in writing before production begins.
Six Capability Tests for Any Swim Spa Supplier
1. Can they quote against your drawing, not just their model number?
Ask the supplier to mark up your site plan or landscape drawing: where the shell sits, where the cabinet door swings for pump access, where the electrical run comes from, and how people get in and out. If a supplier only sends back a model code and a price, nothing has been coordinated yet.
2. Do they list options as options?
Our catalogue for this range lists control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps as selectable accessories, with availability and compatibility varying by model. A capable supplier states plainly which options fit the 115AⅢ shell, which do not, and what each one does to lead time and cost. Vague answers here are the most common cause of a spa arriving without the heat pump the site was wired for.
3. Can they handle the electrical conversation with your contractor?
Total power on the catalogue sheet is not the same as a supply specification. Your electrician needs the actual connected load, cable sizing and protection device for the configuration you ordered — including any heat pump added later. Push the supplier to issue that information in writing, addressed to your site conditions rather than to a generic datasheet.
4. Is there one accountable contact from order to handover?
A swim spa crosses categories that many vendors split across departments: shell fabrication, pump and jet assemblies, filtration, delivery, and site set-up. Our own turnkey solutions workflow is built around consultation, design and planning, production, logistics, installation and after-sales as one sequence, which is the structure we would recommend you look for in any supplier you assess.
5. How does it travel, and who handles the paperwork?
A spa shell is bulky, awkward to lift and expensive to replace if it is damaged in transit. Ask specifically about packaging, container loading plan, freight mode, customs documentation and who tracks the shipment once it leaves the factory. Our logistics and door-to-door delivery service covers sea, air and rail forwarding with commercial invoices, packing lists and certificates of origin prepared by the shipper — but you should confirm Incoterms, duties, insurance and the delivery point on your own quote, because those terms decide who carries the risk at each leg.
6. What happens after commissioning?
Ask what happens in year two: spare jets, pump replacements, control board faults, insulation panels, and who supplies them. Warranty wording is easy to read and hard to test, so ask for named parts, a stated process for raising an issue, and how replacement items are shipped. We list on-site installation, inspection and snag resolution, warranty coverage, spare parts and ongoing maintenance under installation and after-sales support; whatever supplier you choose, get the same items defined before you commit.
Where Custom Work Changes the Assessment
Some projects cannot work with a standard shell — a terrace with a curved edge, a resort pool deck where the spa has to sit flush with surrounding paving, or a villa brief that calls for a different footprint entirely. In those cases the relevant question is whether the supplier actually manufactures, because a trading company will route your request onward and add delay to every revision. Our custom and OEM service covers bespoke dimensions, material and finish selection, prototyping and flexible order quantities, which is how a non-standard spa integrates with the rest of the outdoor package rather than sitting beside it as an afterthought.
Buyer Checklist Before You Sign
- The exact model code and variant letter, matched to the equipment list you were quoted — not just "115 series".
- Dimensions confirmed against your prepared base, including clearance for the equipment cabinet door.
- Total power stated for the ordered configuration, with the electrical specification passed to your contractor.
- Every option written out: heat pump, UV sterilisation, sand filtration, insulation, steps, swim training system — and any that are excluded.
- Named delivery terms, delivery point and who is responsible for unloading and crane or forklift access.
- A single project contact from production through to handover, with the after-sales process documented.
Putting It Together
The right supplier for an outdoor swim spa is the one who asks you harder questions than you ask them: what the base is, where the power comes from, how the shell gets in, and what happens when a pump fails two winters later. As a China-based furniture and building materials supplier working on villa, resort and hospitality projects, we would rather settle those details during quotation than discover them on site.
Send us your spa location and drawings
Share the site plan, the intended configuration and your target programme date, and we will confirm which 115-series variant fits, what the electrical load becomes with your selected options, and how the unit reaches your project.
Contact PHILLIP — Phone/WhatsApp +86-13928214007 · Email santerson@qq.com · Enquiry page