A swim spa order rarely goes wrong at the drawing stage. It goes wrong in the specification exchange, where one unclear sentence about pumps, power or site access turns into weeks of rework. If you are sourcing a custom outdoor swim spa such as the WS-125AⅢ-U, this is the information set we ask project buyers, builders and designers to prepare before a quotation can be finalised.
Start With How the Spa Will Actually Be Used
The model name is only a starting point. Tell us who uses the water and how often, because that drives the equipment list far more than the shell size does.
- Primary purpose: daily lap swimming, hydrotherapy and massage, children's play, or a hotel/villa amenity used occasionally by guests.
- Occupancy: how many people sit in the water at once, and whether the spa serves one household or a shared facility with rotating users.
- Season pattern: year-round use, warm months only, or all seasons with heating. This decides insulation and heat pump decisions later on.
- Supervision model: self-managed by an owner, or maintained by site staff who need simple controls and accessible equipment.
A family that swims every morning and a resort that runs occasional guest sessions need different jet layouts, filtration cycles and control systems. Write this down in plain language before you look at any specification sheet.
Confirm the Shell Size Against Your Site
The catalog lists WS-125AⅢ-U with overall dimensions of 5500 × 2300 × 1350 mm. Treat those figures as the reference to check against your space, not as an automatic approval. Measure three things on site:
- The clear footprint where the unit will sit, including clearance for steps, seating and any cover mechanism.
- The delivery route — gate width, stair flights, lift dimensions, crane access or a courtyard that has to be opened. Many delays come from a shell that fits the terrace but not the driveway.
- Structural support — deck or slab loading with the unit full of water, which your local engineer or builder signs off. We supply the weight and point-load data you need for that calculation.
Read the Equipment List Line by Line
The catalog page for WS-125AⅢ-U records a control system (1 set), water pumps (4 pcs), filter pump (1 pc), jet total (23 pcs), LED lights (1 pc) and total power of 11.85 kW, with water jets, LED lighting and ozone shown as the featured functions. Two cautions apply to any order:
- Catalog figures describe a reference configuration. What ships is what your signed specification says, so ask for the equipment list in writing and check quantities against it at delivery.
- The same shell size appears in more than one variant. The closely related WS-125AⅢ is listed with a swim training system and a different pump, jet and lighting count. If you want continuous swim current for training, say so explicitly — the "-U" reference above does not list that system.
Decide the Options You Want Before Pricing
Catalog-listed options across this range include control systems, UV sterilisation, additional water pumps, heat pumps, sand filtration, insulation and steps. Availability and compatibility vary by model, so send us your selection as a list rather than expecting it to be inferred:
| Decision | What to tell the manufacturer |
|---|---|
| Water treatment | Ozone is shown as standard on this reference configuration; state whether you also want UV sterilisation and whether sand filtration replaces or supplements cartridge filtration. |
| Heating | Target water temperature, the months you hold that temperature, and whether a heat pump or another heating route suits your site's power supply. |
| Insulation | Cold-climate or energy-cost priorities, since insulation level changes both running cost and cabinet build. |
| Access | Internal steps, external steps, handrail needs, and whether users include children or older adults. |
| Ambience | Number and position of LED lights, colour requirements, and any water feature such as a waterfall or jets aimed at a specific seating position. |
| Cover | Whether an automatic or manual cover is required, since this affects structural detail and clearance. |
Supply the Electrical and Water Information Early
Total power for the reference configuration is listed as 11.85 kW. That number only becomes useful once you tell us what your site can deliver:
- Supply voltage, phase and frequency available at the spa location, plus the main breaker capacity.
- Whether a dedicated circuit and isolator can be installed, and by whom.
- Drain and overflow routing, water fill source, and whether a softener or dosing system is already on site.
- Any restriction on equipment noise, which matters for attached villas and hotel rooms facing the terrace.
Electrical work and connection to mains, drainage and water supply are carried out by your licensed local tradespeople. Send us their requirements early so the cabinet, control panel and pump positions match what they need to reach.
Agree the Deliverables Before Production Starts
For a custom order, we ask buyers to confirm four documents in writing: the signed specification sheet with equipment quantities; the shell and equipment layout drawings; the packing and container plan for delivery; and the installation sequence your site team will follow. Our custom furniture and OEM service covers bespoke sizing, finishes and prototyping across product ranges, and swim spa configurations follow the same discipline — nothing enters production until the specification is signed.
If your project combines a swim spa with poolside loungers, pergolas, outdoor dining or bathroom fixtures, it is worth placing them in one coordinated package. Our swimming pools and swim spas range sits alongside the rest of our furniture and building materials catalogue, so a single specification set covers the whole outdoor area instead of several unlinked suppliers.
A Short Checklist to Send With Your Enquiry
- Model reference or shell size you are considering, and whether a swim training system is required.
- Site photographs, measured footprint, and the delivery route from the kerb to position.
- Intended users, usage frequency and season pattern.
- Option list: treatment, heating, insulation, steps, lighting, water features, cover.
- Electrical supply details and drainage arrangement.
- Target delivery location and the date the site must be operational.
Send those six items with your enquiry and a quotation can move straight to drawings instead of another round of questions. That is how a custom swim spa order stays on schedule.