A glass-front media unit looks simple on a rendering and complicated on site. Glazing type, hardware rating, cable routing, lighting interface and fixing detail all have to agree before production starts, and a wall-hung unit adds structural questions that no drawing can leave open. A product submittal is where those questions get answered in one document set, so the approval stage produces comments instead of surprises.

Santerson Glass Front Media Units are made-to-measure: finish, layout and dimensions are specified per project, and the product page itself asks buyers to confirm glass, storage and hardware selections for each project. That single sentence defines what a competent submittal has to contain. Below is the package we suggest you assemble, item by item, with the decisions each item closes.

1. Project header and document control

Start with the boring part, because it is what makes the rest traceable during a construction cycle:

  • Project name, unit or room reference, drawing revision number and date.
  • The specifier, main contractor, installer and the contact who signs off finishes.
  • Scope statement: which rooms, how many linear metres, and whether the media wall includes adjacent tall cabinets or shelving that share the same finish.
  • A revision log. Media walls get revised more often than almost any other built-in element, because screen sizes and console depths change late in a project.

2. Dimensioned elevations and the wall behind them

Dimensioned elevations of every run are the base layer. What separates a usable set from a decorative one is that it also documents the substrate and interface:

  • Finished floor level, ceiling level and the setting-out line for the unit.
  • The wall construction behind the unit — solid masonry, timber stud, steel stud or a built-out frame — and the blocking or backing needed for a wall-hung load.
  • Sight lines: where the screen centre sits relative to seating, and how that fixes the bracket position before any cabinet carcass is cut.
  • Clearances for doors and drawers when they are open, including the swing arc of hinged glass fronts next to a passage or a bed.

3. Glass specification

This is the section reviewers read first, and it should be written out rather than implied by a picture:

ItemWhat to state
Glass typeClear, bronze, smoked, ribbed or frosted — and whether the same glass continues into adjacent wardrobes or display cabinets.
Thickness and make-upSingle pane or laminated, nominal thickness, edge treatment (polished, seamed, bevelled).
Safety positionWhere laminated or toughened glass is proposed and why — overhead panels, doors in circulation routes, child-occupied rooms.
Door interfaceHinged, sliding or lift-up; handle or handleless; soft-close; glazing bead or structural fixing.
Reveal and rebateHow the glass meets the carcass, and the tolerance allowed on each edge.

State safety-related requirements as project requirements with the applicable reference, not as a supplier guarantee. If your project has glazing standards to satisfy, name them in the submittal and ask for confirmation against that named standard.

4. Carcass, doors and finish schedule

Santerson's built-in collections are specified by material and finish per project, so the schedule needs to be as precise as a paint chip:

  • Substrate for carcass, doors and shelves, with thickness.
  • Finish system — lacquer, veneer, melamine, acrylic or glass panel — including sheen level and the direction of any wood grain on bookmatched doors.
  • A physical sample reference for each finish, with the sample size you require before sign-off. A colour card is not a lacquered panel; request a panel sample in the actual door profile.
  • Edge banding or solid-wood edging on visible shelf edges, and how that matches the door edge.

5. Hardware schedule with duty ratings

Glass fronts are heavy, and hardware is where value engineering quietly goes wrong:

  • Hinges, slides, pivots, handles and integrated pull systems, each with the manufacturer's load rating per leaf.
  • Cycle expectation for high-use rooms such as hotel suites or family living areas.
  • Damper and soft-close provision, and whether it is integral to the hinge or an add-on.
  • Locks, where a media console in a shared residence has to secure equipment.
  • Adjustable shelf supports and their point load, plus span for fixed shelves that carry records, books or a soundbar.

6. Services: cable management, ventilation and the screen itself

Most media-wall failures are service failures. Include:

  • Screen technology and size, plus the bracket type — fixed, tilt or full-motion — and its load rating against the wall build.
  • Whether the screen sits in a recess, on a panel face, or behind a glass front. Glass in front of a screen changes heat build-up and reflections, and it must be decided at design stage.
  • Cable routes: grommet positions, pull boxes, conduit runs, and how cables reach devices that sit inside closed cabinets.
  • Ventilation for components that produce heat, with the free-air requirement stated rather than assumed.
  • Remote-control handling behind glass — whether a repeater or IR pass-through is required.

7. Lighting interface

If the design includes shelf or niche lighting, decide early whether it comes with the unit or from the electrical package. Santerson also lists Integrated LED Media Units, where lighting is part of the joinery; in that case the submittal should carry driver location, accessible maintenance point, colour temperature, output and dimming protocol, and match those values with the room's wider lighting design. Where lighting is supplied separately, state who supplies the driver, who runs the feed, and who is responsible for the connection point.

8. Installation method statement

A submittal that ends at the drawing set usually comes back with conditions. Add:

  • Fixing method for each support condition, with fastener type and the fixing substrate.
  • Whether the unit arrives as an assembled module or flat-packed on site, and the access route and lift size needed to deliver it.
  • Sequence relative to other trades: flooring, paint, plaster, electrical first fix and final screen delivery.
  • Tolerances absorbed by the joinery versus tolerances that must be corrected in the substrate.
  • Protection on site once installed, if the unit goes in before handover.

9. Commercial and delivery information

For a project purchase this belongs in the same pack: quotation reference, currency and Incoterms, packing list by module, container or pallet count, production lead time as quoted, delivery address and receiving arrangements, plus the inspection and snag process before sign-off. If freight and installation are part of the package — as they are under Santerson's logistics and door-to-door delivery and installation and after-sales support services — record who performs each stage, what site conditions are assumed, and which items fall outside the quoted scope.

10. Approvals and sign-off

Close the pack with an approval sheet listing every item that needs a signature: finish samples, glass make-up, hardware schedule, lighting interface, fixing method and the final shop drawings. Note explicitly what remains open. A short open-items list at this stage prevents a change order later.

A quick readiness check

Before you submit, ask three questions: Can an installer build this from the pack without phoning anyone? Can the reviewer see every decision that carries cost or safety weight? Does every number in the drawings match the quotation? If any answer is no, the submittal is not finished.

Where to take it next

If you are specifying built-in storage across several rooms, it is worth reviewing the wider built-in furniture range first, so the media unit, tall cabinets and wardrobes share one finish schedule and one hardware standard rather than three. Send us your elevations, the wall construction and the screen you intend to mount, and we will return a submittal set built around those inputs — drawings, glass and hardware schedules, finish samples and a fixing method — ready for your approval cycle.

Do I need shop drawings before requesting a price?

No. A budget quotation can be based on approximate runs and a preferred finish family. Shop drawings become essential once dimensions, glass make-up and hardware are being fixed, because those three items drive most of the cost difference.

What is the single most common omission?

The wall behind the unit. Submittals describe the joinery in detail and leave the substrate, blocking and fixing line unspecified, which is exactly what has to be resolved before a wall-hung media unit can carry a screen safely.

Can glass fronts match wardrobe glass elsewhere in the project?

Yes, and it is usually the right call for visual continuity. Specify the glass make-up once and apply it across media units, display cabinets and wardrobes, then confirm that each application meets its own safety requirement.