A swim spa that is roughly ten metres long is not a catalogue purchase. When a developer, resort operator or landscape contractor decides to put an Outdoor Swim Spa WS-130BⅢ-U into a villa estate, a hotel pool deck or a residential development show site, the buying conversation moves from "which model" to "who builds it, to what specification, under whose brand, and who stands behind it on site". That is where OEM sourcing begins. Below is how the process actually runs at SANTERSON, and which decisions you need to lock down before a single panel is fabricated.

What OEM Sourcing Means for a Swim Spa

OEM (original equipment manufacturer) sourcing means the factory builds the product to your specification and, where agreed, under your brand — not its own. For furniture and building materials this is well understood; for swim spas it catches buyers out, because the unit is part structure, part mechanical plant and part electrical installation.

In practice an OEM arrangement on a model such as WS-130BⅢ-U can cover three layers:

  • Specification — shell dimensions, pump and jet count, control system, filtration, heating and insulation, all confirmed against your drawings rather than the catalogue default.
  • Brand — engraving, embossing, logos and packaging on panels, control covers and shipping materials, so the unit arrives carrying your name for a development or a distribution range.
  • Delivery scope — whether you receive the shell only, the complete plant set, or a factory-assembled unit with steps, handrails and insulation fitted.

SANTERSON operates as a furniture and building materials manufacturer in China and runs custom and OEM work across its ranges, including design and prototyping, bespoke finishes, flexible order quantities and private labelling. The swim spa range sits inside that same service model, which is why an OEM enquiry on WS-130BⅢ-U follows the same route as a joinery or outdoor furniture package.

Reading the Catalogue Specification Before You Negotiate

The published specification for WS-130BⅢ-U is your starting point, not your final order. The catalogue lists a shell of 9950 × 3000 × 1430 mm, one control system, four water pumps, one filter pump, 23 jets in total, five LED lights and a total power figure of 11.85 kW, with water jets, LED lighting and ozone shown as the fitted features.

Two things matter here when you brief a factory. First, the model letter changes the equipment set: the closely related WS-130BⅢ is listed with a swim training system, one water pump, 20 jets, seven LED lights and 10.85 kW — the same footprint, a different plant configuration. Quoting from a model code alone invites the wrong equipment list into your tender documents; quoting component counts does not.

Second, the "-U" suffix and similar markers in the range point to configuration variants rather than a different shell. Treat every figure on a product page as a reference specification to be re-confirmed line by line in your proforma, including total power, because that number drives the electrical supply you must provide on site.

Catalogue reference for WS-130BⅢ-U

Shell: 9950 × 3000 × 1430 mm

Control system: 1 set · Filter pump: 1 pc

Water pumps: 4 pcs · Jet total: 23 pcs

LED lights: 5 · Total power: 11.85 kW

Features shown: water jets, LED lighting, ozone

Step 1 — Brief and Site Constraints

Send the factory what you would send any structural or wet-area supplier: the site drawing, the access route for delivery, the intended use (resort guest use, residents' gym, private villa, sales show piece) and the local electrical supply available at the position. A ten-metre spa on a rooftop terrace and the same spa on a ground slab are different projects — loading, waterproofing, crane or hiab access, plant-room distance and cable run all change.

State your target completion date and who holds the building permit. If your consultant team has an electrical engineer signing off the installation, name them in the brief now; the factory needs their load and protection requirements to close out the specification.

Step 2 — Configuration and Options

The range lists options that are commonly added or removed on OEM orders: control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps. Availability and compatibility vary by model, so each option is confirmed against the specific shell rather than assumed from a neighbouring product page.

Decide these before pricing, because they change both the equipment schedule and the shipping breakdown:

  • Heating — whether a heat pump is supplied, and the insulation package for the shell and base.
  • Water treatment — ozone as standard on this model, with UV sterilisation as an option; confirm dosing and maintenance access.
  • Filtration — filter pump specification and whether sand filtration replaces or supplements cartridge filtration.
  • Jet layout — the 23-jet total can be redistributed between hydrotherapy seating, loungers and the swim end depending on how the space will be used.
  • Access and finishes — steps, handrails, decking interface, coping detail and lighting colour.
  • Controls — control system placement, user interface language and any building-management integration you expect.

Step 3 — Drawings, Prototyping and Sign-Off

For a bespoke configuration the process follows the same sequence as other custom work: design proposal, quotation with detail confirmation, then production. Expect shop drawings for the shell and equipment set, material and finish samples where branding or cladding is involved, and written confirmation of the electrical supply each component requires.

Sign off three documents before production starts: the equipment schedule (every pump, jet, light and control device with quantities), the dimensional drawing with the site interface dimensions, and the brand marking sheet showing logo placement. Anything not in writing will be built to catalogue default.

Step 4 — Production and Inspection

Because a swim spa ships as both structure and plant, inspection is worth scheduling at two points: shell and insulation completion, and pre-shipment functional test with the pumps, controls and lighting energised. Agree in advance what the factory records and sends you — test log, water-fill check, photos of the wired control panel — so your site team has a baseline to compare against on arrival.

Step 5 — Freight, Customs and Site Handover

SANTERSON's logistics and door-to-door delivery service covers freight forwarding by sea, air and rail, customs paperwork, packaging and container loading, shipment tracking and delivery to the project address. For a swim spa the packing plan matters as much as the vessel: shell, plant set and accessories may travel separately, and each crate needs to be identifiable against your equipment schedule.

Confirm import terms, duties and insurance for the destination country case by case with your forwarder. Do not assume a quoted delivery price includes crane offloading, site positioning or connection works — those normally sit with your local contractor, and the factory's installation and after-sales support should be scoped in writing so you know what is covered.

Step 6 — After-Sales and Spare Parts

A swim spa is a maintained asset. Pumps, jets, control boards, LED fittings and filtration consumables all have service lives, and the practical question for an OEM buyer is how quickly replacements reach the site. Before ordering, agree which spares ship with the unit, which you hold on site, and how warranty claims are raised and evidenced — including the water chemistry records that most pump and heater warranties depend on.

What to Confirm in Writing for WS-130BⅢ-U

Pre-production checklist

  • Model code and configuration variant confirmed on the proforma, including whether a swim training system is included.
  • Pump, jet, LED and control quantities matched line by line to the equipment schedule.
  • Total power figure reconciled with the site electrical supply and the engineer's protection design.
  • Insulation, heating and water treatment options listed as supplied or excluded.
  • Brand marking, packaging and labelling approved before production.
  • Delivery term, offloading responsibility and installation scope defined per project.
  • Spare-parts list, warranty terms and claim procedure agreed in writing.

Frequently Asked Questions

Can I order WS-130BⅢ-U under my own brand?

Brand customisation is part of the custom and OEM service — engraving, embossing, logos and packaging. Send your artwork and mark positions with the enquiry so they appear on shop drawings rather than being added late.

Can the jet count and layout be changed from the catalogue figure?

Jet layouts are configurable within the range, but each change affects pump sizing and the total power figure. Request a revised equipment schedule with the updated power load before you commit to the electrical design.

Is the swim training system included on WS-130BⅢ-U?

The captured specification for this variant does not list a swim training system, while the related WS-130BⅢ does. If your programme requires counter-current swimming, state it in the brief and have the configuration confirmed explicitly on the quotation.

Can the spa be supplied alongside other site products?

Yes. Poolside furniture, pergolas, loungers, wall and ceiling finishes, lighting and cabinetry are all inside the same product range, so a single project package can cover the spa and its surrounding environment. See the swimming pools and swim spas category for the wider range.

Send a specification, not a model number

The fastest OEM quotations come from buyers who send site drawings, an equipment schedule and their electrical supply details in the first message. If you are sourcing WS-130BⅢ-U or comparing it with other shells in the range, contact SANTERSON with your project drawings and configuration requirements and request a confirmed specification and proforma.