A long outdoor swim spa with a hydrotherapy and relaxation pool looks simple on a mood board: a ribbon of blue water on a terrace, lap swimming at one end, jets and seating at the other. On site it is one of the least forgiving items in an outdoor specification, because the shell, the deck, the power supply and the drainage all have to agree before anything is manufactured. The misalignments that cause trouble are rarely technical disagreements — they are gaps in what the designer assumed and what the buyer was quoting.
As the manufacturer on these packages we see the same handful of items reappear on every project where a long outdoor swim spa with hydrotherapy and relaxation pool is specified. Below is what we ask design teams and procurement teams to settle together, in the order it has to be settled, so that the drawing you approve is the unit that arrives.
1. The product name on the drawing is not always the unit being built
The first alignment problem is naming. In our catalogue the long-format units sit in two places at once: a feature page such as Long Outdoor Swim Spa with Hydrotherapy & Relaxation Pool, and a model-coded line under Swimming Pools and Swim Spas — WS-115AⅢ, WS-125AⅢ, WS-130BⅢ, WS-S12 and so on. A specification that says only "long swim spa, 10 m" matches neither. It invites a supplier to quote the closest thing they stock.
Write the model code into the schedule, then state the configuration behind that code: which systems are included, which are optional, and what has been left out. Two codes that look almost identical can differ in exactly the way a project cares about. In our range WS-130BⅢ is listed with a swim training system; the WS-130BⅢ-U variant carries the same shell dimensions without that item. A specification copied across from a companion building, or shortened to save a line on the schedule, quietly changes what the contractor buys.
2. Overall length is only half of what the deck has to absorb
Designers specify a length; builders price a footprint plus working space. Those are different numbers, and the difference decides whether the unit fits at all.
Within one family of long units the catalogued footprints run from roughly four metres to nearly twelve metres in length, with widths around 2.2 m to 3.0 m and depths from about 1.25 m to 1.6 m. The full range is on the category page linked above; three points matter more than any individual figure:
- The length drives the transport plan, not just the terrace. A unit approaching twelve metres overlength cannot be handled like a compact spa. It reaches site as an assembled shell or in sections, and that decision changes crane access, the route from the gate to the deck, and whether the deck is built before or after delivery.
- Depth of the water column sets the seating geometry. The relaxation end has to be shallow enough for people to sit with shoulders under water and heads above it; the swim channel has to be deep enough that a stroke does not scrape the shell. Those two requirements are in tension, and the resolution is a floor step inside the shell — which must be drawn, not assumed.
- Cabinet access is space you have to give up permanently. Pumps, filter pump, control system and any heat pump sit behind removable panels. A deck that closes all four sides with no access hatch turns a five-minute service into breaking out stone.
3. Electrical capacity: the number most often discovered late
Catalogued total power for these units is stated per model, and it ranges from roughly 7.5 kW to about 11 kW depending on pump count, jet count and lighting package. That figure is the one your electrical consultant should be handed early, because it determines three separate things:
- the size of the sub-main and protective device run from the distribution board, and how far that run can travel before voltage drop becomes a problem;
- whether a dedicated circuit is available at all — on an existing villa terrace this is frequently the item that stops a project mid-approval;
- whether the option list changes the load. Adding a heat pump or a second water pump to raise the relaxation zone to swimming temperature moves the connected load, so the cable selected at first-fix may no longer be adequate.
We state total power for each model and confirm included equipment and electrical requirements for the selected configuration before production. What we cannot do is tell you what your local regulations require. Supply arrangement, earthing, residual-current protection and any inspection certificate are set by the codes applying at the site, and those are the buyer's local engineer's call — not ours.
4. Swim training versus hydrotherapy: two different briefs in one shell
The value of a long unit is that it serves both users on the same footprint. The risk is that neither user gets what they came for, because swim jets and massage jets compete for the same water system.
What the swim end needs agreed
- Whether a swim training system is in the specification at all. Jet count alone does not tell you: some models in the range are listed with 6 jets, others with 20 or more, and only some carry a dedicated swim training set.
- The usable swim length — the distance from the propulsion unit to the far wall, minus the turbulence zone. A swimmer needs continuous water, not a total shell length.
- How the system is operated: control system placement, whether swim speed is adjustable in steps or continuously, and who on site is expected to set it.
What the relaxation end needs agreed
- Jet layout against actual seating positions. Jets aimed at a bench that was never drawn are dead weight in the quotation.
- Water temperature expectation for the spa zone versus the swim channel, and whether a heat pump is included or added later.
- Water features and LED lighting: catalogued units list LED light counts per model, and features such as ozone treatment appear on some configurations and not others. Match the feature list to the model, not to the brochure photograph.
If the two briefs cannot be satisfied in one shell — a serious daily swimmer plus a deep, hot spa zone, on a tight terrace — say so at concept stage. A customizable-shape outdoor spa used alongside a dedicated swim channel is often the cleaner answer than forcing both into one cabinet.
5. Shell, reinforcement and finish: what to specify in words
For our long units the interior is an acrylic shell over a reinforced cabinet, with exterior cladding and step details resolved per project. On the drawing we ask for three things in words rather than in a brand name:
- Shell material and thickness basis, and confirmation that the acrylic interior is supported by structural reinforcement behind the seating and jet positions — those are the load points.
- Exterior finish against the deck palette. The grey cabinet shown on the terrace photographs is a starting point; cladding colour, step material and coping detail should be drawn to match the surrounding terrace so the unit reads as built-in rather than placed on it.
- Insulation approach. Insulation appears in our option list for these models. On a project where the spa zone is held at temperature year-round, insulation and cover are part of the running-cost conversation, not an afterthought at handover.
6. Options that change the quotation: read them line by line
Catalog-listed options across this range include control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps. Availability and compatibility vary by model. Two practical warnings for buyers comparing quotations:
- A quotation that omits an option is not the same product at a lower price — it is a different scope. Compare line by line, including filter pump quantity, water pump quantity and jet count.
- Where a captured specification simply does not list an item for a model, treat it as unconfirmed rather than absent. Ask us directly before you design around it.
7. Site sequence: who pours what, and when
Long units fail on programme more often than on product. The sequence we recommend agreeing in the construction programme:
- Stage 1 — Model and option list locked. Model code, jet layout, swim system yes/no, heat pump yes/no, total power figure issued to the electrical consultant.
- Stage 2 — Set-out drawing returned. We confirm dimensions, access panels and service clearances; your team draws the structural support, drainage falls and the electrical run against that set-out.
- Stage 3 — Production. Manufacturing to the locked configuration, with quality control before packing.
- Stage 4 — Delivery and handling. Freight route and crane or lift plan checked against the actual access at site, not against the plan drawing alone.
- Stage 5 — Commissioning and handover. Water balancing, jet and control demonstration, and a written record of what was supplied versus the option list.
Because we supply swim spas alongside the rest of the outdoor envelope — pergolas, loungers, dining sets, paving-adjacent fixtures — this coordination is easier when one supplier holds the outdoor package. That is exactly the scope our turnkey interior project solutions are set up for: one specification holder across furniture, fixtures and building materials, so the deck detail and the spa detail come from the same drawing set.
8. What buyers should send us at first enquiry
- A site photograph or plan of the terrace, with the intended orientation of swim end versus relaxation end.
- Available electrical supply: distribution board location, spare capacity, and your engineer's target circuit size.
- Structural support intent — full bearing base or perimeter support only — and the deck build-up above it.
- Usage brief in plain language: who swims, how often, whether the spa zone is held at temperature in winter.
- The model code you are pricing, plus the option list you expect attached to it.
- Delivery constraints: gate width, overhead obstruction, crane availability, and the date the deck must be closed.
Send those seven items and the first quotation is usually the last one. Send only a length and a photograph, and the project will spend three months arguing about a cable.
Alignment checklist before the order is placed
| Item to align | Designer's assumption | Buyer's confirmation needed |
|---|---|---|
| Model code and suffix | Any long unit of this length will do | Exact code, with the option list attached |
| Swim training system | Included because it is a "swim spa" | Confirmed present on that specific model |
| Total connected power | Whatever the terrace circuit carries | Catalogued figure issued to the electrical engineer |
| Footprint plus service clearance | Overall dimensions only | Access panels and cabinet access kept clear |
| Jet layout | As per brochure image | Drawn against seating positions on the plan |
| Shell and cladding finish | Grey as photographed | Colour, coping and step detail matched to deck |
| Local approvals | Supplier handles it | Buyer's engineer confirms code compliance on site |
| Delivery route | It will arrive like any spa | Lift plan checked for an overlength shell |
None of this is complicated. It is simply a list that has to be closed before manufacture rather than after delivery. Where a project wants the swim spa resolved together with the terrace furniture, shading structures and the rest of the outdoor package, we would rather take the whole envelope and coordinate it once — see outdoor furniture for villas and resorts alongside the swim spa range.
Send us your set-out drawing and option list
Tell us the model code you are pricing, the available electrical supply and how the swim end and relaxation end are to be used. We will confirm included equipment, total power and dimensions for that configuration, and return a set-out drawing your deck team can build to.