Pocket doors are one of the few door types where the wall, not just the leaf, decides whether the finished result looks right. A veneer slab that matches the joinery can still read badly if the pocket is too shallow, the lining is set out of square or the floor finish was never accounted for. That is why Santerson Wood Veneer Pocket Doors are supplied made to measure: the quality of the opening we build to depends directly on the information in your enquiry. Below is the exact list of measurements and project inputs our team works from, and what each one changes on site.

Start with the leaf opening, not the wall

The first figures we need describe the clear opening the door has to close, measured in millimetres: width and height of the finished opening, plus the thickness of the finished wall on both faces. Give us those three numbers and we can propose a leaf size that clears the frame and sits proud or flush as intended.

Two details cause most rework when they are left out:

  • Floor build-up. State whether the height is taken from the structural slab or from the finished floor level, and what that build-up consists of — screed, adhesive, tile, engineered boards. A door measured before the floor goes down will arrive long.
  • Which side is which. Veneer doors are face-specific. Tell us which face of the leaf faces the corridor and which faces the room, so the grain matching and any decorative layout are applied to the correct side.

The pocket itself: depth, lining and what sits inside it

For a sliding leaf the wall cavity has to swallow the panel plus hardware, so pocket depth is measured as the clear distance between the two skins of the partition. Send us the internal dimensions of the pocket you are building — or, if the partition is not set out yet, tell us and we will work back from the leaf.

InputWhy it matters
Clear pocket depth and lengthDetermines whether a single leaf or a twin (bi-parting) arrangement fits, and how much clearance the track needs.
Partition make-up and stud centresTimber studs, steel studs and masonry each take a different lining detail. We need to know what we are being fixed into.
Lining material already specifiedWhether the pocket is lined with plasterboard, block or a purpose-made frame changes the fixings and the reveal we build.
Skirting, architrave and shadow gapsIf skirting stops at the opening or runs through it, and whether you want a visible architrave or a flush detail — both affect the lining profile.
Services inside the wallPipework, ducting and back boxes have to be routed around the pocket before plasterboard closes. Send the services layout with the door schedule.

Hardware and operation inputs

A pocket door is only as good as the track it hangs from, so we ask for the operating requirements before quoting rather than after:

  • Leaf weight class. Driven by the core and veneer build you select; heavier slabs need heavier-duty runners and a stiffer pocket lining.
  • Daily cycle volume. A main bathroom door and a hotel-room entry door are not specified at the same duty level. Tell us the room type and how often the door is used.
  • Handle, pull and lock set. Flush pulls, recessed handles and privacy sets all need cut-outs, so send the model you intend to use or let us propose one.
  • Closing behaviour. Soft-close, self-closing or free-running — each has different hardware and clearance requirements inside the pocket.
  • Acoustic and privacy expectation. State whether the room needs a sealed, private enclosure; that changes the leaf edge detail, seals and threshold treatment.

Veneer, finish and matching details

This is where a made-to-measure door either disappears into the joinery or sticks out. For wood veneer pocket doors we need the finish direction confirmed in writing, not left to a sample tin:

  • Species and cut of veneer, plus whether grain is to run vertically or horizontally across the leaf.
  • Sheen level — matte or glossy — and whether the surface must match existing or adjacent cabinetry. Our matte finish veneer wardrobes and high gloss veneer wardrobes are often specified in the same rooms, so we can match the door leaf to those faces.
  • Reference sample or approved schedule item. Physical samples still beat photographs for colour and grain; send one when the schedule allows.
  • Edge treatment and whether the leaf is double-faced with different finishes on each side.

If the same veneer also appears on hinged doors, folding screens or wall panelling in the project, send us the whole door and joinery schedule at once. Grouping them lets us batch veneer from one cutting run, so grain tones stay consistent across the property.

Project inputs that shape delivery, not just the drawing

The non-dimensional information matters just as much when we plan production and logistics:

InputWhat we do with it
Door schedule with item numbers and room listEvery leaf is labelled to a room so the site team knows what goes where on delivery day.
Programme dates for framing, plasterboard and floor finishesSets the production window and tells us whether linings must ship ahead of the leaves.
Delivery address, access and site constraintsDetermines packaging, container loading and whether pocket linings travel separately from the leaves.
Installer identity — your joiner or oursDecides how detailed the fixing drawings and setting-out marks need to be.
Inspection and sign-off pointsLets us agree what is confirmed before production, so nothing is cut against an unapproved dimension.

A practical sequence that avoids rework

In practice the safest order of work on a villa or apartment project is this:

  • Agree the door type per room — pocket, hinged, sliding or concealed — before partitions are set out.
  • Confirm finish levels for floors and walls early, because everything downstream is measured from them.
  • Issue the schedule with leaf sizes, pocket depths and hardware for confirmation before any panel is cut.
  • Have linings and frames installed and checked square while the wall is still open.
  • Re-measure in situ after plasterboard and floor finishes are complete, then release the leaves for production.
  • Hang and adjust the leaves last, once wet trades have finished.
All Santerson pocket doors are made to measure rather than stocked in fixed sizes. The dimensions, materials and finish combinations described here are inputs we ask you to confirm for each project; we do not assume them on your behalf.

Send the schedule and we will price it properly

If you can supply leaf openings, pocket depths, partition make-up, hardware choices and a veneer reference, we can return a specification that an installer can build to — with linings, frames and leaves labelled for each room. Share your door schedule with our team and we will flag anything missing before production starts, rather than after the walls are closed.

Related options in the same collection include Classic Pocket Doors and Santerson Glass Pocket Doors, which follow the same made-to-measure process.