A dark shaker front gives a kitchen weight and character, and it reads well across periods — a heritage terrace, a new-build villa, or a serviced-apartment fit-out. Because Dark Tone Shaker Cabinets are made to measure rather than picked off a shelf, the detail in your enquiry decides the accuracy of the price you get back. A vague request produces a rough estimate that shifts later; a complete one comes back close to final and can be compared line for line against other tenders.
Here is what to send, and what comes back.
What actually moves the price of made-to-measure cabinetry
Cabinet pricing is not a per-metre rate applied to a drawing. Three things drive it, and each one belongs in your first message rather than in a later round of emails.
- Layout complexity. A straight run of base and wall units is straightforward work. Corners, L-shaped and U-shaped runs, full-height pantries, appliance housings and scribed panels to walls that are out of plumb all add cutting time, extra components and site adjustment.
- What sits inside. Two kitchens with identical fronts can differ substantially in cost once you specify drawer stacks, pull-out corner mechanisms, internal organizers, integrated bins and lighting. Interior fittings are usually priced item by item, so list them now.
- Finish and substrate decisions. The shaker profile is the same across the range; the panel build and surface behind it are not. Our Shaker Kitchen Cabinets collection covers painted, glass-front, two-tone and dark-tone variants, and each combination of door construction, surface and edge detail is priced differently.
What to send with your enquiry
You do not need a finished design package. If you only have sketches and phone photos, send those — we work from them. What matters is that the following reach us together.
1. Drawings, in any state of completion
A floor plan with wall lengths, ceiling height and the position of doors, windows, downlights, switches, plumbing waste and flues is enough to price a first version. If you already have elevations from your designer or architect, send the PDF; layered files are welcome but not required. Where dimensions come from a site survey rather than a drawing, say so — it changes how we allow for tolerance.
2. A room list or schedule
For a single kitchen, mark up the elevations with unit widths and heights. For a villa or a multi-unit project, a simple spreadsheet is fine: one row per room, columns for run length, height, appliance list and finish reference. This is what lets us quote several rooms in parallel instead of one at a time.
3. The finish you want, with a reference
"Dark" covers espresso-stained timber, charcoal paint, black-brown laminate and smoked veneer. Tell us which direction, and give us something to match: a RAL or Pantone number, a paint chip code, a sample of an installed kitchen you like, or a photograph from a project you have seen. Where colour accuracy matters, we send samples before production so you can check the tone under your own lighting rather than on a screen.
4. Appliances and dimensions they need
List the oven, cooktop, rangehood, dishwasher, fridge and any wine or under-bench fridge you intend to install, with model numbers where available. We build housings and ventilation gaps around those dimensions. If appliances are not selected yet, say so and we will design to standard cut-outs and flag what still has to be fixed before production.
5. Countertop, splashback and joinery details
Tell us whether the top is stone, sintered surface or another material, who is supplying and templating it, and what edge profile you want. Bench height, upstand and the set-back for the splashback all affect carcass construction, and these are cheap to change on paper and expensive to change on site.
6. Destination, quantities and required date
The delivery city determines packing, container loading and the freight option — sea, air or rail. Quantity tells us whether this is one kitchen or a batch for several apartments or hotel rooms. The date you need the cabinetry on site lets us work backwards through production and transit, and tell you at quotation stage whether that programme is realistic.
A practical note on measurements
Send both a plan and at least two photographs of the existing space, including one showing the ceiling and any bulkheads. Cabinets are built to the room, not to the drawing, and a photograph often reveals the beam, pipework or uneven floor that a scaled plan does not.
What you receive back, and in what order
Our process runs in three steps: project brief and design proposal, quotation with detail confirmation, then production, shipment and follow-up. For cabinetry that breaks down as follows.
| Layout proposal | A revised layout with elevations showing unit widths, drawer heights, appliance housings and clearances, so you can see what you are being priced on rather than reading a list of codes. If the drawings have gaps — a missing dimension, an unclear finish reference, a clash between plumbing and an appliance position — we raise it at this stage rather than after the order is placed. |
| Itemised quotation | Priced by run and by component, with the interior fittings, finishes and any custom items shown separately. That way you can move budget from hardware to doors without re-tendering the whole kitchen. |
| Detail confirmation | Before production we confirm dimensions, selected specifications, handle and hinge choices, and the finish sample. Nothing goes into the factory until those drawings are signed off. |
| Production and logistics | Manufacturing with quality control, then packing, container loading, customs paperwork and door-to-door delivery to the site address you give us, with shipment tracking along the way. |
If your project needs more than the kitchen, send the joinery package together. Our Custom Built-in Kitchen Cabinets are produced for hotel and apartment projects alongside wardrobes, media walls, vanities and panelling, so one set of drawings and one production run can cover the whole fit-out. That removes the coordination problem of matching timber tones and paint colours across unrelated suppliers.
When a shaker profile is the right call — and when it is not
Shaker doors carry a flat centre panel inside a square frame. That construction reads as traditional in a painted cream, and as contemporary in a dark finish with a slim frame and integrated handles. It suits projects where you want warmth without ornament.
Where the brief is strictly minimal, a handleless flat panel keeps the wall plainer than a shaker can. Where the space is small and poorly lit, a full-height dark front can feel heavy — in those rooms we usually mix the dark tone with lighter carcasses or glass fronts, as in our Glass Front Shaker Cabinets, and let the upper run stay light. Tell us the room conditions and we will advise on that choice rather than simply quoting what was asked for.
Five things to ask us before you accept a price
- Which door construction and substrate are being quoted, and what the alternative finish in this collection costs
- What sits inside the base price — plinths, scribes, filler panels, toe kicks and wall cabinets run to ceiling
- Which hardware brand and hinge type are priced, and what an upgrade would add
- How cut-to-size adjustments for site tolerance are handled if walls move during installation
- What appears on the delivery note, and how panels are packed so the right ones arrive on site first
Before you press send
- Plan plus elevations, with ceiling heights and service positions marked
- Finish reference — RAL, Pantone, paint code or a sample photograph
- Appliance list with model numbers, or an explicit note that selection is pending
- Countertop material, supplier and edge profile
- Room schedule for multi-room or multi-unit projects
- Delivery city, quantities and the required on-site date
Send what you have. An incomplete drawing is a normal starting point, and our Custom & OEM Service covers prototyping, material and finish selection and dimension confirmation before anything enters production. As a China-based furniture and building materials manufacturer, we quote from the drawings you send rather than from a fixed catalogue range.