A corner tall cabinet looks simple on a drawing and is one of the hardest items to price correctly. The angle, the carcass depth on each leg, what sits behind the door and how the unit meets the ceiling all change the build. This guide sets out exactly what to send SANTERSON so that Santerson Corner Tall Cabinets are quoted, built and delivered to the opening you actually have on site.
Why corner tall units need a fuller brief than a straight run
A straight tall cabinet has one width, one height and one depth. A corner tall unit carries all three twice, plus the geometry that joins them. In practice the buyer is specifying an assembly: two carcasses, an angled or scribed return, a door set that has to clear the adjacent run when it opens, and often a scribe to an out-of-plaster wall.
Our corner tall cabinet range is made to measure for each project, with the finish, layout and dimensions specified per space rather than picked from a fixed size grid. That flexibility is the point of going custom, but it means the quotation is only as good as the information supplied with it. A brief that gives a room photo and a rough measurement produces a rough price; a brief that gives elevations, clearances and an internal schedule produces a build you can install without rework.
What to send before we quote
Send the following with your enquiry. Anything missing becomes a question, and each round of questions adds days to the pre-production stage.
| Item | What good looks like |
|---|---|
| Two elevations of the corner | Both walls shown flat, with finished-floor-to-ceiling height and the position of the corner line marked. |
| Clear opening dimensions | Width on each leg measured to the finished face of the wall, not the structural wall. State floor and ceiling finishes if they are still to be laid. |
| Obstructions | Skirting, architrave, radiators, downpipes, switch plates, extract ducts, window reveals and door swings that cross the run. |
| Adjacent runs | The depth and height of the cabinets meeting the corner on each side, so the return and the scribe can be matched. |
| Internal schedule | What is being stored: linen, dry goods, small appliances, hanging items, display pieces. This drives shelf centres, drawer positions and load rating. |
| Appliance data, if any | Manufacturer cut sheets for anything built in, including ventilation requirement, service access and weight. |
| Finish reference | Colour code, veneer species, lacquer sheen or a physical sample reference. Photos alone are not a specification. |
| Project context | Unit count, room type, delivery address and site access constraints. |
The measurements that decide the build
Working dimensions versus finished dimensions
Tell us which measurement you are sending. A 900 mm leg taken off a bare block wall and a 900 mm leg taken off a tiled wall are two different cabinets once the finish build-up is accounted for. Where tiling, plasterboard or panelling is still to be installed, give the structural dimension and state the intended finish thickness; we will allow for it.
Which leg carries the door
The corner can be resolved in more than one way: a bi-fold pair that folds into the angle, a single hinged door on one leg with a fixed return on the other, or an open angled bay. Each has different requirements for hinge clearance, handle position and the depth of the return carcass. Say which you want, or send the room layout and we will propose the option that keeps the traffic line clear.
Ceiling height and the top detail
Specify whether the unit stops below the ceiling with a scribe, or runs to a full-height flush finish. In renovation work ceilings are rarely level across a corner, so give the height at three points on each leg rather than one average figure. Where a bulkhead, cove or service runs above the unit, mark it on the elevation.
Floor condition
State whether the unit sits on an adjustable plinth, on a recessed toe kick, or directly on the finished floor. Tiled and heated floors change both the setting-out and the fixing method, so mention underfloor heating early.
Specifying what goes inside
The internal layout is where a corner unit earns or loses its keep. Send a simple schedule listing each zone from floor to ceiling with its intended use, and we will set shelf centres, drawer stacks and hanging rails around it.
- Deep storage low down. Pull-out larder racking and deep drawers keep heavy items reachable; specify the load you expect per level.
- Hanging zone. Robes, robes on hangers or workwear each need a different rail height. State the tallest item.
- Appliance housing. Where an oven, microwave or washer is built in, the carcass has to carry ventilation and service access as well as weight. Compare Santerson Integrated Appliance Tall Cabinets if appliances are the driver of the design.
- Display and closed mix. Glass-fronted upper sections change the frame detail and the lighting provision; see Santerson Glass Front Tall Cabinets.
- Open shelving. Where a corner is used for display rather than concealed storage, Santerson Corner Open Shelving may suit the space better than a closed carcass.
If you are still weighing up whether the corner should be a tall closed unit at all, Santerson Corner Storage and Santerson Utility Tall Cabinets sit in the same made-to-measure family and can be mixed within one room.
Finishes, materials and how to name them
Name the finish in a way a factory can act on. For painted work give the colour standard and code, plus the sheen. For veneer give the species, cut and grain direction. For laminates and acrylics give the supplier reference or send a sample. Where a unit has to match an existing run already on site, say so explicitly and tell us whether it was made by us; matching an existing colour is a different exercise from choosing a new one.
Our custom and OEM service covers bespoke finishes and textures, prototyping before series production, and flexible minimum order quantities, which matters on multi-unit residential work where one bathroom layout repeats across several floors.
Briefing for a multi-unit or project order
For an apartment block, villa group or hospitality fit-out, add the following to the brief:
- A room-by-room schedule with unit type codes, so identical layouts are not redrawn each time.
- The number of repeating configurations and the variation between them. Corner units on upper floors often differ from the ground floor because of window reveals and roof lines.
- Delivery sequence and storage capacity on site. Delivering block by block avoids damage in temporary stores.
- A named site contact for approval of shop drawings before production starts.
Approval step. Review the shop drawings before we release to production. Once a corner carcass is cut, correcting an angle is a rebuild, not an adjustment. One signed set of drawings protects every repeating unit in the order.
How the brief moves through our process
Your information enters a defined workflow. Design consultation and space planning turn the measurements into a proposal; material selection and product specification fix the finish and internal layout; then manufacturing and quality control run against the approved drawings. Through our interior design service we can also prepare layouts, 3D visual renderings and production coordination for the wider room, which is useful when the tall unit has to align with a kitchen run or a wardrobe wall. As a one-stop project furnishing supplier, we coordinate these units alongside the rest of the joinery and fit-out rather than treating them as an isolated purchase.
Production is followed by packing and container loading, export documentation and door-to-door delivery under our logistics service, then on-site installation, inspection and handover. Corner units ship as assembled or knock-down carcasses depending on the access route to the room, so include stair widths, lift dimensions and door openings in the brief if the site is above ground level.
Questions worth answering in the first message
- Is this new build or renovation? Renovation sites carry uneven walls and existing services that change the scribe detail.
- Who is installing: your contractor or ours? The fixing method and pack size differ.
- What is the target completion date for the room, and what has to be delivered before it?
- Are wet conditions expected in the space? Bathroom-adjacent and laundry locations call for different board and edge treatment.
- Is there a budget range? It lets us propose an internal configuration that fits rather than one that has to be cut back later.
A short checklist before you send
- Two elevations of the corner with heights at three points per leg.
- Clear widths on both legs, marked as working or finished dimensions.
- Adjacent run depths and heights.
- Internal schedule and any appliance cut sheets.
- Finish references in a code a factory can action.
- Unit count, delivery address, site access, installation responsibility.
Send that and the first quotation is close to the last one. Where a drawing pack is not yet available, Custom Built-in Kitchen Cabinets for apartment and hotel projects follow the same made-to-measure route, so a room layout and a finish direction are enough to start.
Send your corner dimensions and internal schedule to SANTERSON. We will return shop drawings for your approval before production begins, with the tall units coordinated against the rest of your joinery and fit-out. Enquiries are handled through our contact page.