A stacked laundry unit looks like a simple purchase until it arrives on site and the washer door fouls a corner, the bench height no longer matches the appliances, or there is nowhere to put the rinse cycle. For Australian builders, renovators, apartment developers and furnishing agents ordering these units from an overseas manufacturer, most of the risk sits in the specification stage rather than in the factory. The checklist below sets out what to confirm in writing before a purchase order is placed.

Rule of thumb: if a dimension, material or connection detail is not written into the confirmed drawing and quotation, it is not part of the order. Every item in this article should end up as a line you can point to later.

1. Confirm the appliance envelope before the cabinet is drawn

Stacked laundry units are built around appliances, so the appliances should drive the drawing — not the other way round. Full-size front-loaders and compact units differ by more than width, and a unit sized to a generic "standard washer" allowance can easily reject the model actually specified for the project.

  • Record make, model and the manufacturer's dimension sheet for the intended washer and dryer, including depth with hoses and cords at the back.
  • Ask what clearances the supplier has allowed around the cavity, and whether that allowance matches your appliance choice.
  • Confirm which way the doors and drawers open relative to the appliance door swing, doorway and any adjacent wall.
  • Check whether the unit is intended for a fully vented dryer, and where the vent is routed.

Where appliances are not yet fixed — common in apartment and build-to-rent projects — ask the supplier to state the appliance envelope their design assumes, then have your services engineer check it against the models on the fixture schedule. Our Stacked Laundry Units are made to measure for exactly this reason: sizing, layout and finish are set from the project drawings rather than chosen from a fixed catalogue size.

2. Verify how the unit handles water, damp and drainage

Laundry rooms in Australian homes are often located in wet areas, under stairs or inside a bathroom envelope. Board choice and detailing matter more here than in a bedroom wardrobe.

  • Ask which substrate is specified for carcass and doors, and what the supplier states about its resistance to damp — get the answer in writing, not as a general reassurance.
  • Confirm whether the base plinth or feet are raised or shielded where spills and mop water are expected.
  • Check that the drawing shows where the washing machine stopcock, waste outlet and any dryer condensate drain sit, and that panels are cut or notched to suit.
  • Ask how benchtops and splash zones are sealed at the wall, especially where a trough is included.

Where laundry functions share a bathroom envelope, coordinate the unit with the rest of the bathroom sanitary fixtures at drawing stage so that wall finishes, tiling setout and services are resolved once instead of twice.

3. Check the fit against the room you actually have

Tolerance problems usually come from existing conditions rather than from the unit itself. For renovations and retrofit apartments, finished dimensions on site rarely match the drawing exactly.

  • Supply finished dimensions taken on site after floor and wall finishes are in place, noting out-of-plumb walls and skirting.
  • Confirm overall height against ceiling, cornice, window reveals and any overhead services.
  • State the access route on site — stairwell width, lift doors, hallway turns — so the unit can be delivered either assembled or in panels that fit.
  • Ask whether the supplier will confirm dimensions again before production starts, and who signs off the final drawing.

Where a stacked unit alone cannot serve the room, the same made-to-measure approach covers Compact Laundry Solutions for narrow layouts and WasherDryer Cabinets where machines sit side by side under a bench. Specifying all three from one set of drawings keeps door profiles, handles and finishes consistent across the project.

4. Pin down materials, finishes and hardware in writing

"Customisable finish" is not a specification. Ask for the exact board, laminate or lacquer, the edge treatment, and the hardware brand or grade you are buying.

ItemWhat to ask for
Carcass and door substrateNamed board type and thickness, plus the supplier's stated suitability for damp rooms
Surface finishExact laminate, lacquer or veneer reference and sheen level; sample sent before production
EdgesEdge banding material and colour match, or lacquer wrap on panel doors
Hinges, runners, handlesBrand or grade, soft-close or standard, load rating for drawers
Benchtop (if included)Material, thickness, edge profile and cut-out allowances for trough and appliances

For multi-unit projects, ask what the supplier will hold constant across lots — batch colour variation in laminate and lacquer is one of the most common snags at handover. Request a signed sample board with the purchase order.

5. Understand freight, packaging and who installs it

Sourcing from an overseas factory is normal practice for Australian projects, and the handover points are where disputes start.

  • Agree the delivery term — what is included to your site, who handles customs clearance and duties, and who bears damage in transit.
  • Ask how the units are packed and whether they arrive assembled, flat-packed or in modules, and what that means for on-site assembly time.
  • Confirm whether installation is included, who carries it out locally, and what inspection or snag list applies at handover.
  • Ask what after-sales support covers: replacement panels, hardware, and how quickly claims are handled.

SANTERSON works as a one-stop supplier for furniture and building materials on villa, hospitality and office projects, covering design coordination, custom and OEM production, door-to-door logistics and installation support. The scope for each job is agreed in the quotation, so the same discipline applies: read what is written down and ask for anything missing.

6. Match the laundry to the wider joinery package

On whole-of-dwelling projects, a laundry unit ordered separately from kitchen and bathroom joinery tends to look separate too — mismatched door profiles, handle styles and wood tones. Coordinating all interior fixtures with one supplier keeps finishes aligned and reduces the number of trades you have to manage.

It also simplifies procurement: one drawing set, one production schedule, one container and one point of contact for variations. For Australian villa and apartment work we have supplied cabinetry and fit-out packages on projects in Sydney, Melbourne, Perth and North Turramurra, where the laundry was drawn as part of the joinery scheme rather than added late.

Pre-order checklist

  • Appliance models confirmed, with dimension sheets including hoses and cords
  • Cavity clearances stated on the drawing and checked against those appliances
  • Substrate and finish named, with a sample approved before production
  • Stopcock, waste, condensate and vent positions shown and coordinated with services
  • Site-measured finished dimensions supplied, signed off before manufacture
  • Hardware brand, grade and soft-close specification listed in the quotation
  • Delivery term, packaging format and installation responsibility agreed in writing
  • After-sales scope and claim process recorded with the order

Send your layout, appliance schedule and finish preference to a supplier who can quote against drawings, and compare quotations on the specification rather than on price alone. That comparison is where most of the savings are made — before the container is booked.

Specify your laundry with drawings, not guesswork

Talk to our project team about made-to-measure stacked laundry units and coordinated fit-out packages for villas, apartments and hospitality projects. Contact us to send your plans and appliance schedule.