Open corner wardrobes look simple on a drawing: two runs of shelving and hanging space meeting in a 90-degree return, with no doors. That simplicity is exactly why they cause trouble late in a project. The junction detail, the depth change at the return, the load path of a frameless carcass and the finish of every exposed edge all sit on show once the unit is installed. This guide sets out what procurement teams should have written down before a wardrobe package goes into production, using the Open Corner Wardrobes range as the reference point.

Why corner units get documented last and fixed first

In most bedroom packages, straight wardrobes are specified early because they line up with walls that appear on the architectural drawing. Corner units sit between two walls, often behind a door swing or under a window reveal, and rarely appear as their own item in a bill of quantities. So the corner is decided by default: whoever is pricing the job assumes a return will be added later.

When that assumption reaches the factory, three questions come back at once — what is the finished dimension at the apex, which run carries the load, and how do the two carcasses meet. Each unanswered question costs a week. Writing the answers down before order placement is cheaper than reconciling them on site.

The dimension record that prevents rework

A corner wardrobe cannot be ordered from nominal room dimensions. Finished wall-to-wall measurements, taken at floor level, mid-height and ceiling level, should be recorded for both runs, together with the actual apex angle rather than an assumed 90 degrees. Older villas and refurbished hotel rooms frequently return an off-square corner, and a frameless open unit will expose that deviation far more clearly than a door-fronted one.

Item to recordWhy it matters for an open corner unit
Finished dimension of each run, at three heightsOut-of-plumb walls change the effective width; open carcasses cannot absorb the difference behind a door frame
Apex angle measured on siteDetermines the cut of the top and bottom panels and whether a scribed filler is needed
Clear depth of each runThe return is usually shallower than the main run; hanging rods need more depth than shelving
Skirting, architrave and reveal projectionsDetermines whether the carcass sits flush or requires a scribe cut
Location of switches, outlets and ceiling fixturesDrilling into a finished panel after delivery leaves visible damage on an open unit
Floor finish build-up at the junctionTall plinths and adjustable feet must be set to the completed floor level, not the slab

Specification items that differ from a straight wardrobe

Carcass construction and load path

With no doors to stiffen the assembly, an open unit relies on its own panels, back panel and any metal frame. Our Metal Frame Open Wardrobes use a metal supporting structure, which is the option to record when spans between verticals are long or when shelves carry heavy loads. Where a timber carcass is specified instead, note the board material, thickness and edge treatment for each exposed edge — front edges, return edges and the top of any partial-height unit are all in the sightline.

Internal layout split between the two runs

Record which run carries hanging and which carries shelving before drawings are issued. A corner is where a mixed layout — Combination Modular Wardrobes logic applied to a bedroom wall — earns its keep: long garments on the deeper run, folded storage and drawers on the shallower return. Also record hanging heights, drawer stack positions and whether any shelf is to be adjustable, because fixed shelf heights are the most common complaint after handover.

Dust and presentation of open storage

Open wardrobes have no front closure, so the specification should state how stored items are protected and how the unit reads in a finished room. In hotel rooms this usually means garment covers and a defined display rhythm; in villas it often means a backing panel in a contrasting finish so hanging clothes do not sit against a bare wall. Note the backing panel material and colour in the same schedule as the carcass.

Integration with adjacent joinery

A corner wardrobe rarely stands alone; it meets a window reveal, a bed-head panel or a run of Custom Minimalist Bedroom Wardrobe detailing. The interface — which element butts into which, and who supplies the transition trim — should be named in the drawing register with a single responsible party.

The document set to hold before you place the order

  • A dimension record signed off by the site team, not the design team alone, with apex angle and floor build-up stated.
  • An elevation for each run showing hanging, shelving and drawer zones with heights in millimetres.
  • A finish schedule covering carcass, exposed edges, backing panel and any metal frame colour.
  • A material confirmation per unit: board type and thickness, or the metal frame specification.
  • An interface drawing for the corner junction and for every point where the wardrobe meets another trade.
  • A named approval holder for the shop drawings, with a stated review turnaround.

For made-to-measure ranges, dimensions and selected specifications are confirmed project by project. Treat any figure in a catalogue page as indicative until your own signed record is on file.

How this fits a single-supplier package

When wardrobes, kitchen cabinetry and other built-in joinery come from one factory, the dimension record only has to be produced once and the finish schedule only has to be reconciled once. That is the practical argument for consolidating these items with a one-stop project furnishing supplier rather than splitting them across three vendors who each assume someone else resolved the corner.

Before you issue for production: confirm the apex angle, the depth of each run, which run carries hanging, the edge treatment on every visible panel, and who owns the transition at the corner. Six lines in a schedule will save a site visit.

SANTERSON manufactures built-in furniture including open and corner wardrobe ranges to project-specific dimensions, layouts and finishes, with production coordinated alongside other interior fixtures for villa, hotel and apartment projects. Send us your dimension record and elevations and we will return shop drawings for your review before anything is cut.