An all-weather wicker outdoor conversation sofa set with round coffee tables is one of the easier outdoor items to specify — and one of the easiest to get wrong. The difference between a smooth order and an expensive rework is almost never the weaving. It is what you hand the supplier before the first quotation is written.

Below is the preparation list we work from on villa, resort and hospitality projects, using our own conversation set as the running example so you can see exactly what each item changes in the quote, the tooling and the delivery plan.

1. The site conditions behind the furniture

Before anyone talks about wicker colour, send the supplier the environment the set will live in. Frame construction, fixing details and even the table top are decided from this information, not from taste.

  • Indoor or outdoor, covered or exposed. A shaded loggia, an open pool deck and a rooftop terrace place very different demands on frame finish and cushion fabric.
  • Salt air or inland. Coastal sites need a corrosion-conscious frame and hardware specification; the same set specified for an inland courtyard does not.
  • Hardscape and floor level. Paving, timber deck or plinth all affect how the sofa feet and table bases sit, and whether levelling is required.
  • Traffic level. A resort lobby poolside set takes daily public use; a private villa patio does not. This drives cushion density and frame reinforcement choices.

2. Dimensions, layout and clearances

Our standard configuration is a two-seater wicker sofa, two woven armchairs and a pair of mixed round coffee tables. That combination works well for conversation grouping, but the numbers around it must come from your drawings.

Reference specification — what we build as standard

  • Fine open-lattice synthetic rattan, hand-woven over a hidden aluminium frame
  • Curved silhouette with soft beige loose cushions; cushion covers removable for cleaning
  • Breathable woven structure suited to hot, humid climates
  • Two round coffee tables supplied as a mixed pair
  • Wicker colour, cushion fabric and table tops adjustable to project design requirements

Figures above describe the configuration shown on our product page. Treat overall sizes, seat heights and load ratings as items to confirm on your own order documents — we do not publish a single universal dimension sheet for this model.

Send the supplier: the plan area available, the seating count you need per group, the number of groups across the project, and any clearance requirement from doors, planters or balustrades. A set that fits on a mood board often fails at the doorway it has to pass through on delivery day, so include access routes as well.

3. Your finish schedule and design references

Because this model is made to order rather than stocked in fixed colourways, your finish schedule is the single most valuable document you can attach. State:

  • Wicker tone and weave openness — send a physical sample or a reference photograph if you already have one
  • Cushion fabric: colour, weave, and whether you need an outdoor-grade cover
  • Table top finish for the round coffee tables, including edge profile if it matters
  • Any contrast piping, cushion thickness change, or frame cap detail carried over from your interior joinery

If you are furnishing a whole project, send the wider scheme too. The same conversation set reads differently beside rope weave seating with teak armrests than it does beside a teak-topped aluminium conversation set, and matching the families across zones is far cheaper than correcting them after production.

4. Quantities, phasing and the delivery address

Outdoor sets are usually ordered in waves: pool deck first, garden courtyards later, guest-room terraces last. Tell the supplier the total quantity for the project and the split by phase before pricing, because a phased release and a single bulk order are not quoted on the same basis.

Also confirm at enquiry stage: the delivery address or addresses, whether the site accepts container deliveries directly, the required on-site date for each phase, and who receives goods on your side. For projects abroad, our logistics and door-to-door delivery service covers freight forwarding, export paperwork and container loading — but duties, Incoterms and final-mile arrangements are agreed per project, so name your terms early rather than leaving them to the invoice.

5. Budget range and decision authority

A supplier can hit an unspoken budget twice as fast when they know it exists. Give a realistic band per seating group, and say who signs off samples and who signs off production. On multi-consultant projects this alone removes most of the round-trip delay.

6. What to ask the supplier in return

Preparation works both ways. Ask for:

  • A specification sheet written against your finish schedule, not a generic brochure page
  • Frame and weave construction detail, plus how cushion covers are removed and replaced
  • A physical wicker and fabric sample before the tooling decision is locked
  • Packaging and container-loading plan, so you can check access on site
  • The after-sales route for replacement cushions and spare parts — outdoor cushions are a consumable, and knowing how they are re-ordered matters more than any brochure claim

Be cautious of any supplier who answers performance questions with absolute guarantees about lifespan or compliance without seeing your site conditions. We would rather see the drawings first.

Quick preparation checklist

  • Site condition sheet: exposure, salt air, flooring, traffic level
  • Plan area, seating count per group, number of groups, access routes
  • Finish schedule: wicker tone, cushion fabric, table top finish
  • Total quantity and phasing by zone
  • Delivery addresses, required dates, Incoterms preference
  • Budget band per seating group and named approver
  • Questions on construction, samples, packaging and spare parts

Send us the drawings, not just the photograph

SANTERSON has manufactured furniture and building materials for villa, hospitality and office projects since 2008, with custom and OEM production handled in-house. For this conversation set we adjust wicker colour, cushion fabric and table tops against your design requirement, and we can coordinate it alongside the rest of the outdoor range — loungers, dining sets, benches and pergolas — under one turnkey project scope.

Send your plan, finish schedule and quantities to our team for a specification-based quotation.

Contact: PHILLIP  |  Phone / WhatsApp: +86-13928214007  |  Email: santerson@qq.com

Product page: All-Weather Wicker Outdoor Conversation Sofa Set with Round Coffee Tables  |  Full range: Outdoor Furniture for Villas and Resorts