A swim spa quotation is only as good as the brief behind it. For our configurable Outdoor Swim Spa WS-S07M, the difference between a rough estimate and a firm, build-ready price comes down to about ten items of information. Send them with your enquiry and we can return an itemised quotation instead of another round of questions.

Start with the model reference and the site it is going to

Quote the model code first — WS-S07M — so we know which catalog configuration you are pricing. The catalogue lists this unit at 7000 × 2200 × 1480 mm, which is what we check against your available space before anything else.

Then tell us where it will sit. A villa terrace, a resort garden, a rooftop deck and an indoor wellness room each raise different questions about access routes, lifting equipment needs, waterproofing, drainage and how the shell will be supported. Photos of the space, plus a rough plan with dimensions and level differences, let us flag installation issues at quotation stage rather than on delivery day.

Confirm the specification you actually want

The published specification sheet for WS-S07M shows one control system, three water pumps, one filter pump, 40 jets in total, two LED lights and a total power figure of 10.75 kW, with water jets, LED lighting, ozone, a waterfall and four water columns listed as features. Treat that sheet as the starting point for a discussion, not as a fixed order: equipment fitted on a specific unit can change with the configuration you select, so we reconfirm every line item before production.

Specification shown in the catalogueWhat to confirm with us
Catalogue dimensions 7000 × 2200 × 1480 mmSite opening, access route and clearance for delivery
Jet total 40 pcs; water jets, waterfall, 4 water columnsWhich jet and water-feature functions you want active
3 water pumps, 1 filter pump, 1 control systemPump and control arrangement for your layout
Total power 10.75 kW; 2 LED lightsElectrical supply, circuit capacity and lighting needs
Ozone listed as a featureWhether you also want UV sterilization as an add-on

Tell us which options are in scope

The catalogue lists control systems, UV sterilization, water pumps, heat pumps, sand filtration, insulation and steps as options for this range. Availability and compatibility vary by model, so we check each option against WS-S07M rather than assuming it fits. Two of them change the quotation most often:

  • Heat pump. It sets the running-heat strategy and adds to the electrical load, so we need your target water temperature and how many months a year the spa is used.
  • Insulation and filtration. Insulation level and whether you want sand filtration alongside the standard filter pump affect both price and the plant space required beside the shell.

Give us the electrical and plumbing facts

Power is where swim spa enquiries most often stall. Please send the supply available on site — single or three phase, voltage, frequency and the dedicated circuit capacity you can provide — and tell us whether an electrician will install the connection to our wiring diagram. For water and drainage, note the fill source, the drain point, and any local requirement for backflow prevention or a permit that your consultant should confirm with the local authority.

Set the quantities, schedule and delivery terms

Project buyers should also include: quantity and whether units are identical; the required on-site date and any phased handover; the delivery address and Incoterms you want quoted, such as FOB or door-to-door; and whether you need our logistics team to handle freight and customs paperwork. Our Logistics & Door-to-Door Delivery service covers sea, air and rail freight forwarding with the shipping documents, and our service workflow runs from consultation and design through production, logistics, installation and after-sales. For Australian villa and hotel projects, furniture sourcing on this end-to-end basis is how we keep swim spa, outdoor furniture and interior fixtures under one coordination point.

A short checklist to paste into your enquiry: model code (WS-S07M); site photos and dimensions; desired options from the catalogue list; supply details (phase, voltage, frequency, circuit capacity); quantity and required date; delivery address and Incoterms; your role (owner, builder, designer or trade) and who signs off the drawings.

What comes back to you

With those details we return an itemised quotation covering the shell and equipment as configured, each option priced separately, plus packing and freight for your chosen terms. If a spa shaped to your space makes more sense than a standard rectangular unit, our Customizable Shape Outdoor Spa in square, round, oval and curved layouts is the alternative we will price alongside it. Specification questions are best answered by the team building the unit, so send your brief with the checklist above and we will come back with a quotation you can put straight into your project budget.

Send your WS-S07M enquiry

Contact PHILLIP with the model code, site photos and the specification details above for an itemised quotation.

Phone / WhatsApp: +86-13928214007  |  Email: santerson@qq.com