A washer dryer cabinet looks simple on a drawing: two appliances, one enclosure, storage above. On site it is the joinery in a laundry that gets opened most often, sits beside water and detergent, and has to enclose machines whose dimensions were fixed months earlier by an appliance supplier. Finish decisions — door fronts, carcass board, edges, hardware, worktop, ventilation — are where quotation and site conditions drift apart. The list below covers the finish details buyers should confirm in writing before an order is placed, so the cabinet that arrives matches the room it has to fit into.

Why finish confirmation matters more for laundry joinery than for kitchen cabinets

Kitchens and laundries are usually specified together, and both are made-to-measure. The difference is the environment. A laundry, or a laundry corner built into a bathroom, runs warm and humid, meets detergent and bleach spills, absorbs the vibration of a spin cycle, and often sits in a corridor or under a stair where the door swing has to clear a traffic route.

Santerson's interior fixtures catalogue covers this range as part of the Laundry Integration collection — stacked laundry units, compact laundry solutions, laundry and storage combos and multi function tall cabinets. Each of these product pages states the same three configuration points: made-to-measure sizing, material and finish options, and a layout tailored to the project. That is the correct framing for a buyer — the finish list is not a fixed menu you pick from, it is a set of decisions you confirm per project.

1. Door and drawer fronts: material, sheen and edge profile

Fronts carry most of the visual decision, and they are also where a laundry differs from a kitchen. Confirm four things separately, because suppliers quote them as separate line items:

  • Front material. The catalogue lists melamine, lacquer, acrylic, PVC, aluminium frame and wood veneer fronts across the cabinetry collections. For a laundry, handleless matte and textured fronts keep water marks and fingerprints far less visible than high gloss.
  • Sheen level. High gloss reflects light in a small windowless laundry but shows every splash. If you want a specific sheen, ask for it by name on the order rather than relying on a sample photo.
  • Edge profile and edge banding. Ask which edge thickness and radius is used, and whether all four edges of every panel are banded. Unbanded or thin-banded edges are the first place a humid room lifts a front.
  • Colour reference. Quote a code, not a colour name. "Matte grey" means different things across collections such as grey matte, matte melamine and white matte fronts.

If the laundry is meant to read as part of a hallway or bathroom rather than a utility room, say so at specification stage. Handleless and minimalist front styles appear across the kitchen cabinet collections and can be carried into laundry joinery, which is how a stack of machines ends up looking like built-in storage.

2. Carcass board and moisture exposure

The carcass is what survives the room. Two questions settle most of it:

  • Which board is quoted for the carcass, and in what thickness? Get the board type and thickness written into the quotation for both carcass and back panels.
  • Is any part of the cabinet in direct splash zone? A cabinet beside a trough, shower or bath needs a different answer from one against an internal wall. The catalogue lists PVC cabinet designs as a separate collection; for those and for every other board choice, ask the supplier to state the exposure level the board is intended for rather than assuming it.

Do not accept "moisture resistant" as a phrase without a specification behind it. Ask what it means for that board, that edge and that room.

3. Aperture dimensions: measured from the machines, not the drawing

This is the failure most often found on site, and it is a finish issue because it decides whether the cabinet reads as flush joinery or as furniture that does not quite fit.

  • Confirm the exact appliance models before the cabinet is cut, including door depth, handle projection and hose clearance at the back.
  • Confirm whether the machine slides into an open aperture or sits inside a ducted enclosure with its own doors. These are different products with different clearances.
  • Confirm the finished external dimensions, not just the carcass size — skirting, plinth, worktop overhang and any scribe filler all change what fits in the niche.
  • Confirm floor level and adjustable feet if the slab is not level; a stacked unit on an out-of-level floor transmits vibration through the whole cabinet.

For a stacked configuration, also confirm where the divider shelf sits, whether it is reinforced, and what load it is quoted for. A stacked pair and a side-by-side pair take different shelf and support details at the same external width.

4. Hardware: hinges, runners, handles and load rating

Hardware is where a low quotation quietly becomes an expensive variation, because it is usually listed as "supply only". Confirm:

  • Hinge type and opening angle — especially in narrow rooms, where a standard hinge can put the door into your path.
  • Runner type and load rating for pull-out trays and hampers. Pull out laundry hampers carry a different load from a shelf, and full-extension runners are usually priced above the partial-extension runners that appear in default quotations.
  • Handle or handleless detail. If handleless, confirm whether the profile is a routed edge, a rail or a push mechanism, and which corners will be fitted with the matching end pieces.
  • Soft close on doors and drawers — worth confirming explicitly for doors that stand open while loading.
  • Fixings to the wall, including whether the cabinet is designed to be anchored, and what fixing type is supplied for your wall build-up.

5. Worktop and splashback where the cabinet has one

Where the laundry cabinet carries a folding bench or trough top, treat the worktop as a separate specification item:

  • Worktop material and thickness, and whether an upstand or edge lipping is included.
  • Sealing detail at the wall, particularly behind a trough or next to a bath.
  • Cut-outs for a tub, sink or tapware — who cuts them, and to what template.

Where a matching splashback or wall panel is required, order it in the same batch as the cabinet so colour and texture match; panels from different production runs can differ even under the same code.

6. Ventilation, services access and lighting

Enclosing machines changes how they breathe and how you reach them for servicing. Confirm:

  • Ventilation route — grille size and position in the door or plinth, and whether grilles are included in the price.
  • Access to taps, outlets and the machine's power point without removing the cabinet.
  • Integrated lighting inside niches or above the worktop. Santerson lists integrated cabinet lighting as a configurable accessory; confirm the electrical specification, driver location and compatibility with your circuit before the panels are drilled.
  • Cable and hose entry points, including which side panel they are cut into.

7. Finish consistency across the whole project

In villa and apartment projects the laundry cabinet is rarely alone — it repeats in a second bathroom, an ensuite or a basement. Confirm that one finish schedule covers every unit, that the same board and front code is used for all of them, and that any linen cabinet or tall storage beside the laundry is drawn to the same height, depth and plinth line. Mixed heights and mismatched plinths are what make a run of otherwise good joinery look improvised.

Where the whole apartment is fitted from one package — kitchen, wardrobes, vanities and laundry — specifying them together keeps the front codes, handles and worktop edges consistent. That is how custom and OEM manufacturing is normally used on multi-unit work: one finish schedule covering several rooms.

Finish details to confirm in writing before you order

ItemWhat the confirmation should state
FrontsMaterial, colour code, sheen level, edge profile and banding thickness
CarcassBoard type, panel thickness, back panel thickness, stated exposure level
ApertureAppliance model, external finished dimensions, clearance at back and sides
HardwareHinge type and angle, runner extension and load rating, handle profile, soft close, wall fixings
WorktopMaterial, thickness, upstand, cut-out responsibility, sealing detail
ServicesVentilation grilles and their position, access panels, tap and outlet access, lighting specification
SiteFloor level tolerance, levelling method, wall build-up and fixing type
PackageSame finish code across all units; matching tall and linen cabinets to the same line

Anything on this list that is left as "to be confirmed on site" will be priced as a variation later.

How confirmation happens in practice

For made-to-measure joinery the sequence is short: brief and design proposal, quotation with detail confirmation, then production and shipment. The finish decisions above belong in the second step, because once panels are cut the options close. As a furniture and building materials supplier working on whole projects, Santerson describes a workflow running consultation, design and planning, production, logistics, installation and after-sales as one package, with logistics and door-to-door delivery and installation and after-sales support listed as separate services — so the confirmed finish schedule is also the document the joinery is inspected against at handover.

Send the appliance model list, the room dimensions with floor level noted, and the finish codes you want. Ask for a quotation that itemises fronts, carcass board, hardware brand and type, worktop, grilles and lighting. That single document removes most of the arguments that follow.

To price a laundry fit-out, send the appliance models, room dimensions and the finish codes you are working to, and request an itemised quotation for the cabinet fronts, carcass board, hardware and services access. Send your enquiry through Santerson's contact page.