A wardrobe order that crosses an ocean is not finished when the doors leave the factory. For project buyers, the difference between a smooth site handover and a delayed fit-out usually comes down to decisions taken before production starts: how the openings are verified, how the panels are packed, which delivery terms are agreed, and what happens if a component arrives damaged. This guide walks through the planning sequence we use for Two Tone Sliding Door Wardrobes on overseas villa and residential projects, so your purchasing team can budget, schedule and receive the order without surprises.

Why sliding wardrobes are a special case in international freight

Sliding door wardrobes are built-in furniture: carcasses, panels, tracks, door leaves and internal fittings travel together and only make sense once assembled on site. Two things follow from that. First, the order is dimensional — every width, height and out-of-level floor has to be confirmed before panels are cut, because a made-to-measure unit cannot be adjusted by a few centimetres on site. Second, the shipment is fragile in a specific way: long door leaves and panel edges are the parts most likely to be damaged in a container, so packing design matters as much as product design.

Our Two Tone Sliding Door Wardrobes collection is specified per project: sizing is made to measure, the material and finish combination is chosen for each interior, and the internal layout is tailored to the space. Because nothing on this line is a fixed catalogue size, the delivery plan has to be built around your drawings rather than around stock availability.

Step 1 — Lock the site dimensions before anything else

The most expensive mistake in an international wardrobe order is measuring too early. Sliding systems depend on square, plumb and level conditions, so we ask project buyers to confirm:

  • finished floor levels, including the height of the final floor covering, not the screed;
  • wall alignment and any out-of-plumb deviation, which decides whether a scribe or filler panel is needed;
  • clear opening width and height at each wardrobe position, plus ceiling obstructions such as beams, ducts or curtain boxes;
  • positions of switches, sockets, air-conditioning outlets and built-in lighting that the carcass must avoid or accommodate;
  • door run details — number of leaves, overlap, handle style and whether the track is top-hung or floor-mounted.

Send these as marked-up drawings or a site survey sheet. Our team reviews them with you and flags conflicts before the panels enter production, which is far cheaper than correcting them after the container has sailed.

Step 2 — Confirm finish, layout and packing schedule together

Two tone wardrobes combine two surfaces on one elevation — a warm wood tone against a lighter laminate or lacquer, for example. That visual contrast is exactly what makes edge damage visible, so the packing plan should be agreed at quotation stage rather than at shipment. For multi-unit orders we split the packing list by room or unit number: each wardrobe set travels as its own labelled group of crates, with the door leaves protected separately from the carcass panels.

At this stage we also confirm the internal configuration — hanging rails, shelves, drawers, and any open walk in wardrobe or shelving inserts that share the same finish. Internal fittings are lighter and less fragile than door leaves, so they can be nested inside carcasses to use container volume efficiently; that decision lowers freight cost per unit without increasing risk.

Step 3 — Choose delivery terms you can actually administer

Our Furniture Logistics and Door-to-door Delivery service covers sea, air and rail freight forwarding, customs paperwork, packaging and container loading, shipment tracking and delivery to the project address. What matters commercially is which leg your team owns. Before you issue the purchase order, decide and record:

DecisionWhat to agree in writing
Delivery term (Incoterms)Whether you take the goods at the loading port, at the destination port, or door-to-door to site; who pays inland haulage at each end.
ConsolidationWhether wardrobes ship alone or consolidated with other fit-out items such as vanities, doors or cabinetry from the same project.
Container planNumber of crates, total volume, and whether a full container or shared load is more economical for your order size.
DocumentsCommercial invoice, packing list with crate-level detail, certificate of origin and any import documentation required in the destination country.
Cargo insuranceCover value and the claims process, agreed before loading rather than after an incident.
Inspection pointWho opens and inspects crates first on site, and how damage is photographed and reported.

Import duties, local permit requirements and final-mile access differ by country and by building, so treat those as items to verify for your specific destination instead of assuming a standard. Our logistics coordinators prepare the paperwork on our side; your clearing agent confirms what the destination authority requires.

Step 4 — Sequence the order against your site programme

Wardrobes arrive late in a fit-out because they need finished floors and walls. A practical reverse schedule looks like this: installation date, minus local fitting time, minus on-site storage buffer, minus port clearance time, minus transit time, minus production time, minus drawing-approval time. Working backwards usually shows that drawings must be approved earlier than buyers expect.

  • Approval stage: signed dimensions, finish samples or a confirmed finish reference, and the internal layout schedule.
  • Production stage: panel cutting, edge treatment, door leaf manufacture, hardware pre-assembly and packing inspection.
  • Booking stage: crate list finalised so the freight booking matches the actual volume — an estimate that changes after packing creates storage charges at the port.
  • Transit and clearance: tracking shared with your team; documents released in time for pre-clearance where the destination allows it.
  • Site receipt: delivery to a dry, accessible store area, crates labelled by unit, and inspection within the agreed reporting window.

Step 5 — Plan receiving and installation on site

Most delivery "failures" are actually receiving failures. Before the truck arrives, confirm that the site can take a container or pallet delivery, that there is storage space for labelled crates, and that the fitting team has the assembly drawings for each unit. Our installation and after-sales support covers on-site installation guidance, inspection with snag lists, spare parts and replacement where needed — so if a handle, track component or door leaf needs replacing, we arrange it rather than asking you to source local substitutes that will not match the two tone finish.

Ask your fitters to dry-fit one wardrobe set first and check door travel, overlap and alignment before opening every crate. If an adjustment is needed, one unit can be corrected; twenty units opened at once cannot be put back in their packing.

A short checklist for the purchase order

  • Verified finished-level dimensions for every wardrobe position, signed off by your site team.
  • Confirmed finish combination and edge detail for both tones.
  • Internal layout schedule per unit, including any shared shelving or open display sections.
  • Packing list with crate numbering mapped to room or unit labels.
  • Agreed Incoterms, insurance value and the named clearing responsibility at each end.
  • Damage-reporting window and the contact who handles spares.
  • Storage location and installation sequence agreed with the site contractor.
Product note: dimensions, material and finish selections on this collection are confirmed project by project. Treat any dimension or specification in drawings and quotations as the controlling document for your order.

Ordering with a single accountable supplier

SANTERSON has been manufacturing furniture and building materials since 2008, and we supply project customers worldwide. For wardrobe orders we handle design coordination, custom and OEM production, packing, freight forwarding and after-sales support under one purchase order, which means the team that made your panels is also the team responsible for spares and replacement parts.

Planning a residential or villa project order? Send us your wardrobe schedule — unit list, openings and target installation date — and we will return a production and delivery plan for Two Tone Sliding Door Wardrobes that matches your site programme. Contact PHILLIP on WhatsApp +86-13928214007 or email santerson@qq.com.