Open storage looks simple on a rendering: shelves, hanging rails, display niches, and a run of closed cabinets to hide the clutter. On a commercial fit-out — serviced apartments, hotel guest rooms and suites, show flats, office residences — that same wall becomes dozens of line items that have to survive daily use, housekeeping and a procurement audit. The sections below cover what a Santerson open storage proposal should already contain before you compare prices, and the specific questions to send back when it does not.

What "open storage" covers on a commercial project

In the SANTERSON catalogue, open storage is not one product but a set of configurable systems that share the same specification logic. The ones buyers most often mix into a single room package are:

Because these systems sit across several catalogue categories, one floor can end up with open storage drawn from four different collections. The first quality test of a proposal is therefore whether it treats them as one coordinated package or as unrelated items that happen to share a finish code.

What a Santerson open storage proposal should already answer

Rather than reading the price first, read what each line item settles on its own. Every open storage listing in the catalogue is described as made-to-measure, with layout, material and finish options specified per project. That flexibility is the whole point of buying custom joinery — and it is exactly where a thin quotation hides risk. A usable line item states what was decided; it does not merely note that a decision is possible.

The five fields every open storage line item should carry

FieldWhat a complete entry looks likeCommon gap to challenge
DimensionsOverall width, height and depth per module, plus bay-by-bay spacing tied to the room drawing.A single "as per site" figure with no reference drawing number or revision date.
Substrate and surfaceThe board or frame material and the finish system named separately — for example a melamine-faced panel, a lacquered door, a veneer shelf, an aluminium or steel frame."Board with laminate" with no distinction between substrate and surface, which makes substitutions easy later.
Edge and exposed facesHow shelf fronts, niche reveals and open side panels are finished, since open storage exposes edges that a door would hide.Edge detail only specified for closed cabinets; open bays left to the factory default.
Support and fixingBracket type and load intent for floating shelves, wall fixings and substrate requirements, frame-to-floor anchorage for tall open runs.No fixing method for wall-mounted or floating elements, which stalls the builder's first fix.
Interface itemsIntegrated lighting, trunking, sockets, glass panels, drawer runners and handles listed inside the same line item.Interfaces quoted as provisional sums, then added after production starts.

A practical test: take any one open wardrobe line from the quotation and ask whether a third-party installer could build it without calling you. If the answer is no, the item is not yet specified — it is still a design idea with a price attached.

Where commercial use changes the specification

Open storage in a private bedroom and open storage in a serviced unit are not the same product under a different finish. Three differences should be visible in the paperwork:

  • Duty cycle. Housekeeping resets a room on a schedule, so shelf depths, hanging heights and drawer counts follow an operating routine rather than a homeowner's habits. Ask for the layout to be justified against the room's storage brief, not copied from a show-flat reference.
  • Wear and maintenance. Surfaces that are touched constantly — rail ends, shelf fronts, niche reveals — need a named finish and a stated cleaning method. Where a project specifies custom furniture materials and finishes, request the same naming discipline for open elements as for closed ones.
  • Repeatability. A guest-room or apartment floor repeats the same module dozens of times. The proposal should show how that module is dimensioned once and then replicated, with tolerances and site variations resolved at one point in the sequence rather than room by room.

For a run that has to look like furniture while taking daily wear — an open wardrobe in a suite, for instance — the exposed faces matter more than the carcass. That is why Metal Frame Open Wardrobes and the shelf systems beside it should be quoted with frame profile and shelf thickness stated, not just a finish code.

How to check coordination across the package

The costly open storage failures are rarely the shelf itself. They are the shelf meeting a floor line, a skirting, a light switch or a wardrobe door that someone else detailed. SANTERSON positions itself as a one-stop furniture and building materials supplier, which means this coordination burden can be placed with the supplier instead of being carried by your designer.

Ask for these four deliverables before you place an order:

  • Room-level layout drawings showing open storage in relation to doors, services and finishes. The site's interior space planning and layout design service covers space planning, furniture layouts and 3D renderings, so request these as part of the package rather than as an extra.
  • A single finish schedule covering wardrobes, shelving, wall panelling and any cabinetry in the same room, so a wood tone on the wardrobe and a wood tone on a floating shelf are the same specified item.
  • A production and delivery sequence stating which items arrive first and how open storage is protected before handover — relevant for furniture installation for interior projects, where joinery often lands while wet trades are still finishing.
  • A named contact through the workflow — brief and design proposal, then quotation and detail confirmation, then production, shipment and follow-up — so queries have one owner instead of three.

Coordination is also what keeps a mixed wall honest. When Mixed Open & Closed Storage sits in the same room as bathroom Floating Shelves, one finish schedule and one set of dimensions has to govern both, or the difference shows up at handover.

Questions worth sending before you sign

A short, specific enquiry list does more than any amount of price negotiation, because it forces the supplier to reveal how far the specification has actually been taken.

  1. Which open storage collections are included in this price, and which are excluded?
  2. For each floating or wall-mounted element: what substrate does it need to be fixed to, and who supplies that substrate?
  3. What is the maximum clear span for the shelf thickness quoted, and at what load does it change?
  4. Are open side panels and niche reveals finished on all visible faces — and is that stated per item?
  5. Where a module repeats across floors, which drawing revision governs production?
  6. What happens to lead time if finish codes are consolidated after the order is placed?
  7. Which items ship with lighting or electrical interfaces pre-prepared, and who makes the final connections on site?

Send those questions with a target installation window attached. Suppliers that quote from a real specification will answer within that context; suppliers working from a rendering will answer in generalities, which is itself useful information.

A five-point scorecard for the responses you receive

Score each supplier response out of five on the criteria below. A score under four on the first three points to a specification gap rather than a genuine price difference.

CriterionWeak answerStrong answer
Dimensional clarityRanges and "site verify" notesModule drawings with revision control
Finish namingOne finish code across all substratesSubstrate and surface named per element
Fixing methodOmitted for open elementsBracket, anchor and substrate stated
Cross-package coordinationOpen storage priced in isolationCoordinated with wardrobes, wall panels and flooring
After order supportDelivery onlyInstallation sequence, snagging and spares named

Next step

Send the room drawings and the storage brief first, then request a proposal that answers the fields set out above. If the response arrives with dimensions, substrate and finish naming, fixing methods and interface items already resolved, you are comparing like for like, and any remaining price difference is a real one. If it does not, the cheaper quotation is simply the one that has deferred more decisions to your team — and those decisions surface later as variations, substitutions and rework.

Specifications, finishes, dimensions and service scope vary by configuration and project. Confirm all selected details directly with SANTERSON before ordering; this article describes how to evaluate a proposal, not a fixed product specification.