A wardrobe quotation only becomes reliable once the drawings behind it are complete. For cherry solid wood wardrobes, made-to-measure sizing, material and finish selection, and a layout tailored to the space are all specified from information you supply. This guide sets out the measurements and project inputs that let us quote, draw and build your joinery without guesswork.

Why cherry solid wood needs an exact brief

Our Cherry Solid Wood Wardrobes sit within the Solid Wood Wardrobes collection and are made for residential wardrobe projects. Each unit is built to the opening it occupies rather than to a standard cabinet width, so the accuracy of your dimensions directly controls the fit, the door operation and the amount of storage you actually get.

Solid timber also behaves differently from laminated panel products. Doors, carcass panels and drawer fronts are specified with the grain direction and finish you choose, and the layout has to allow for skirting, architraves, ceilings that are not perfectly square and services running through the wall. Every one of those conditions is a measurement or a note we need before production starts.

The measurements that matter most

Send dimensions in millimetres, taken at several points rather than one, and mark them on a simple sketch of the room. The following figures are what we work from.

InputWhat to measure or record
Width of the openingMeasure at high, middle and low points. Take the smallest figure as the controlling dimension and note any variation.
Height to the ceiling or soffitFloor to underside of ceiling, plus the height of any bulkhead, beam or dropped section that interrupts the run.
Depth availableFinished wall face to the opposite obstruction. Note where doors, radiators or furniture will swing into the space.
Floor and wall conditionWhether the floor is level and whether walls are square. Record any unevenness so scribing and packing are designed in.
Obstructions and servicesSockets, switches, light points, radiators, pipework, vents and skirting depth — with their positions from a fixed corner.
Door and traffic clearanceDistance to the bed, wall or next unit, which decides whether hinged, sliding or open fronts can operate comfortably.

If the wardrobe is part of a larger fit-out, also send the room layout with door and window openings, floor finishes and skirting heights, so the joinery lines up with adjacent work instead of fighting it.

Layout inputs: how the interior will be used

The internal configuration is designed around your hanging habits, not a generic template. Before we draw anything, tell us:

  • The split between long hanging (dresses, coats, suits) and short hanging (shirts, folded items), and how many of each you expect.
  • How many drawers you want, and whether they should sit above, below or beside the hanging areas.
  • Shelf heights for folded stacks, plus space for boxes, luggage or seasonal storage.
  • Whether you need open display sections, a mirror panel, lighting inside the carcass, or a dedicated area for accessories and trays.
  • Who uses the wardrobe daily — ceiling height and rail heights should suit the people using it, not an average.

Where the bedroom layout calls for a corner run or a full-height built-in, we design around the geometry you send us. Our custom minimalist bedroom wardrobe work follows the same brief-driven process: room dimensions first, interior zoning second, finish last.

Material and finish decisions to confirm early

Cherry is chosen for its warm colour and fine grain, which read well in both traditional and contemporary bedrooms. Confirm these points with your designer or contractor before we issue the drawing:

  • Finish type and sheen, and whether you want the natural cherry tone or a tinted option from our available finish range.
  • Door style — flat panel, paneled or mixed with glass — because each affects the frame build and hardware set.
  • Hardware: hinge type, drawer runners, handles or integrated pulls, and whether any soft-close fittings are required.
  • Matching elements: bedside panels, skirting returns, architrave details or a complementary walnut solid wood wardrobe in an adjoining room.

A note on finishes over time

Cherry darkens and warms as it is exposed to light, so a sample seen today will not match the same timber after a year in a sunlit bedroom. We suggest approving a physical finish sample against your wall and flooring palette, and placing large glazed surfaces where UV exposure can be managed with curtains or film.

How to survey the room yourself

You do not need specialist equipment. A tape measure, a laser level if you have one, and a pencil sketch are enough. Follow this sequence:

  1. Clear the wall and photograph it straight on, with a tape visible in the frame.
  2. Mark three widths and three heights across the opening, and write the numbers directly on the photo.
  3. Measure skirting depth and height, and note whether the skirting is to be removed or scribed around.
  4. Record the position of every socket, switch and light point relative to one corner.
  5. Note floor finish thickness if the flooring has not yet been laid — this changes the finished height.
  6. Photograph the two adjoining walls so we can see returns, corners and any protruding structure.

Project inputs beyond dimensions

For whole-bedroom or whole-house work, a few extra inputs keep the programme moving and avoid rework on site:

  • Room drawings or a floor plan. Even a marked-up PDF from the architect helps us coordinate joinery lines with doors, windows and lighting.
  • The build stage. Tell us whether plastering, flooring and decoration are complete or still to come; built-in wardrobes are usually set after wet trades and hard finishes.
  • Access for delivery. Stair widths, lift dimensions, corridor turns and parking affect how large sections can be built and how they reach the room.
  • Order quantity and phasing. One bedroom or a full floor of villas changes how we batch production and schedule dispatch.
  • Installation arrangements. Whether your own fitters will install, or you want our team to handle fitting and snagging as part of the package.

Send what you have, even if incomplete. Our design and OEM service covers custom furniture design and prototyping, bespoke finishes and textures, 3D modelling and production coordination — so a rough sketch plus your dimensions is usually enough to start, and we will flag the gaps with you before anything enters manufacture.

What you receive from us

Once the inputs are confirmed, we return a production drawing for your approval: elevations with overall and internal dimensions, door layout, hardware schedule and finish reference. Nothing is cut until that drawing is signed off. After production, sections are packed for transport and shipped to site, with installation and after-sales support arranged according to the package you select.

  • Signed-off dimension sheet in millimetres
  • Finish sample reference and hardware schedule
  • Approval drawing before production starts
  • Packing list matched to each wardrobe section

Common specification mistakes to avoid

Most delays trace back to the same handful of oversights. Check your brief against this list before you send it:

  • One measurement instead of three. Walls are rarely square; a single width produces gaps or an interference fit.
  • Ignoring floor build-up. A screed and finish added after the survey can cost you 20–30 mm of height.
  • Forgetting door swing. Hinged fronts need clearance in front of them; sliding fronts need track depth.
  • Leaving services unrecorded. Sockets behind a carcass have to be relocated or the panel cut, which is far cheaper decided at drawing stage.
  • Choosing the finish after the layout. Door style changes frame build, so fix it early rather than at the end.

Ready to specify your wardrobes?

Send us your room dimensions, photographs and a short note on how the interior should be zoned, and we will come back with an approval drawing for cherry solid wood wardrobes built to your space. Browse the wider built-in furniture range to see how other bedroom projects are configured, or contact our team directly to start a specification.