A wardrobe enquiry rarely fails because of price. It stalls because the manufacturer was handed a picture and a room name, then asked to guess everything else. Below is the checklist we use on lacquer wardrobe projects, using our Two Tone Lacquer Wardrobes as the worked example, so your first message already contains what a quotation needs.

What the design brief usually leaves out

Most interior briefs describe effect: warm, quiet, hotel-like, seamless. That is useful direction but not a manufacturing instruction. Between a mood board and a production drawing sit six decisions that change both cost and lead time — carcass dimensions, door construction, the two finishes and where each one stops, the internal layout, the hardware, and how the unit meets floor, ceiling and adjacent joinery.

A two-tone scheme makes this sharper. Once a wardrobe carries two surfaces, the boundary between them becomes a design line that has to be drawn, dimensioned and approved. Send that boundary as a measurement, not an adjective.

Step 1 — Room data before style language

Start with the shell. For each wardrobe wall we need finished floor level to finished ceiling level at several points along the run, plus the out-of-plumb and out-of-square readings if the site survey has them. Built-in units are made to measure, so a single nominal height for a long run is where problems begin.

  • Width, height and depth at multiple points along each run, in millimetres, taken after the floor and ceiling finishes are in place
  • Position of skirting, architraves, cornices, light switches, sockets, air-conditioning grilles and downlights that the unit must clear or wrap around
  • Door and window swing paths, and any radiator, pipe or structural column inside the wardrobe footprint
  • Floor finish build-up, so a full-height unit can be set on the correct finished level

Step 2 — Say which surfaces carry which tone

"Two tone" is not one specification. It is a pairing, and the pairing has to be assigned surface by surface. A practical way to write it in an enquiry is a short table:

SurfaceWhat to state
Door frontsColour or reference, and whether the sheen is glossy or muted; if doors are handleless, say how the edge is detailed
Carcass and visible endsMatching or contrasting tone; exposed ends of a built-in run need the same finish as the doors unless you intend a deliberate contrast
Open niches and shelvesThe accent tone, shelf depth and whether the niche is lit
InteriorCarcass colour inside, plus drawer fronts if they differ from the doors
Transition lineWhere the second tone starts and ends — as a dimension from floor or from the run's end

Colour names vary between suppliers, so attach a physical sample, a reference number, or both. Where a finish is specified only by name, ask for a produced sample panel before the order is placed; on lacquered fronts, sheen level changes how a colour reads under bedroom lighting.

If the same two-tone logic runs through the rest of the house, say so. Bedrooms are rarely decided in isolation, and a scheme that also appears as two tone lacquer cabinets in the kitchen should be quoted against one finish schedule rather than three separate ones.

Step 3 — Fix the door type and opening geometry

The door mechanism decides the clearance you need to plan for, so it belongs in the enquiry, not in a later email. Sliding fronts save swing space but consume part of the opening; hinged fronts need clear floor area in front; a corner run changes which doors are usable at all. Tell us:

  • Sliding, hinged, folding or open — and which bays use which
  • Whether the unit runs floor-to-ceiling or stops below the ceiling, and how the gap above is closed
  • Corner treatment: angled end, curved return, or a blind corner with rotating access
  • Whether an adjoining wall is to be panelled in the same finish, so doors sit flush with it

Step 4 — Specify the internal layout room by room

Two buyers with identical external dimensions can need completely different interiors. Send the hanging plan as a sketch with dimensions: long hang, double hang, shelf spacing, drawer count and heights, tray sections, a section for luggage, provision for an ironing or valet unit. Note what you store that most wardrobes miss — garment bags, suitcases above the door line, jewellery drawers, a safe.

Where a layout is repeated across several bedrooms, mark the rooms on the floor plan and label each wardrobe A, B, C. Identical codes in an enquiry prevent identical units from being quoted with different internals.

Step 5 — Hardware, lighting and tolerances

  • Hinges, slides and lifts: brand or grade if you have a preference, soft-close or not, load rating for deep drawers
  • Handleless fronts: integrated profile, push mechanism, or routed edge
  • Interior lighting: door-triggered, motion-sensor or always on; state where the transformer may sit and who provides the first-fix cable
  • Glass, mirror or ribbed inserts in any door — including which face is reflective
  • Expansion allowance at ceiling and skirting, and how cornices or shadow gaps are detailed

Step 6 — Delivery, packaging and site sequence

Built-in joinery is the trade that gets blamed when the programme slips, because it depends on wet trades being finished. In your enquiry, state the country and port of delivery, the delivery address for the last leg, and the week the units must arrive relative to flooring, painting and electrical first-fix. Our furniture logistics and door-to-door delivery service covers freight by sea, air and rail with customs documentation and container loading planning; tell us whether the site is apartment-level with a lift, or a house with a crane window opening.

For multi-unit projects, list quantities per room type and whether units ship pre-assembled or flat-packed. That single line changes both packing and on-site labour.

Step 7 — The drawing loop that prevents rework

Production should never be the first time anyone sees dimensions drawn to scale. Our cooperation sequence is brief and design proposal, then quotation with detail confirmation, then production, shipment and follow-up; on custom work it starts with custom furniture design and prototyping, including 3D modelling before a sample is built. In an enquiry, ask explicitly for: elevation drawings for every run, a finish schedule keyed to those elevations, internal layout plans, and a marked-up drawing returned for signature before the order is released.

Two items worth confirming in writing on any lacquered wardrobe order: the sheen level of each tone, and which face of the transition line belongs to which finish. Both are cheap to change on paper and expensive to correct on a finished front.

A ready-to-send enquiry template

Copy this into your message and fill it in; it is the shortest version of everything above.

  • Project: name, city, building type, number of wardrobes
  • Product reference: Two Tone Lacquer Wardrobes, or a comparison across matte and glossy lacquer fronts
  • Dimensions: per run, width × height × depth in millimetres, with survey notes
  • Finish schedule: tone per surface, sample reference or attached sample
  • Doors: type, count, opening direction, handleless detail
  • Internals: hanging plan per wardrobe, drawer counts, lighting
  • Hardware preference and any glass or mirror inserts
  • Delivery: destination, required arrival week, site access conditions
  • Drawing request: elevations, finish schedule, internal layouts for approval before production

Send it to the right place

SANTERSON has supplied furniture and building materials for project work since 2008, with villa and hospitality projects in Australia among our published references. Send drawings, survey data and your finish schedule through our contact page, and we will return elevations and a quotation against the details above rather than a range price.

Working on several bedrooms or a whole villa at once? Send the floor plan with your wardrobe schedule and we will quote the run as one package — wardrobes, matching two tone lacquer cabinets and any panelling in the same finish.