A wardrobe order that travels well is decided long before the container leaves the factory. Here is how buyers, contractors and project managers handle a made-to-measure run of wooden sliding door wardrobes from an order drawing to a handed-over, working installation on site.
Why Sliding Door Wardrobes Are a Different Delivery Problem
Sliding door wardrobes are built-in furniture: carcasses sized to the room, and panels that must run true on a track. Unlike loose furniture that can be uncrated and placed, these units are assembled against walls and floors, and any panel that arrives distorted or out of square becomes a site problem rather than a warehouse one.
Our wooden sliding door wardrobe line is made to measure, with the finish, layout and dimensions specified per project. That same flexibility is what makes delivery planning matter: nothing on the pallet is standard, so nothing can simply be replaced off a shelf if it arrives damaged or if a dimension was taken from an outdated drawing.
Step 1 — Lock the Drawings Before Anything Ships
Most international delivery trouble on built-in joinery begins with a drawing that changed after production. Settle these items in writing at the detail-confirmation stage:
- Opening dimensions and datum lines. Finished floor level, wall finishes, skirting, and whether the unit runs floor-to-ceiling or under a bulkhead.
- Door layout and track type. Number of panels, overlap, handle or push-open detail, and the clearance the track needs.
- Internal configuration. Hanging rails, shelves, drawers and any lighting provision, matched to the room use.
- Finish and material selection. Wood species or veneer, lacquer or laminate surface, and hardware finish — all fixed on an approved sample, not a screen image.
Our interior design and project coordination service covers drawings, production coordination and on-site guidance, so a buyer who supplies room dimensions and a layout brief can have the wardrobe detail resolved against those drawings before the order is released.
Step 2 — Decide How the Order Travels
Wardrobes are bulky, flat and vulnerable to edge damage, so how they are packed and which route they take both affect what arrives intact. Our logistics service covers freight forwarding by sea, air and rail, customs paperwork, packaging and container loading, shipment tracking and door-to-door delivery.
| Route | When it suits a wardrobe order | What to plan for |
|---|---|---|
| Sea freight | Full project sets — several bedrooms or a whole villa package travelling together with other fit-out items | Longer transit; stronger packing and dunnage; consolidated loading with cabinetry, interior fixtures and finishes |
| Air freight | A small number of panels, replacement hardware or a late variation that cannot wait for the next vessel | Higher cost per cubic metre; panel size limits; book against the installation date, not production date |
| Rail | Inland projects served by rail corridors, where overland distance from port is the long leg | Final-mile handling and site access at both ends |
For a multi-unit order we usually consolidate wardrobes with the rest of the joinery package in one container so that carcasses, doors and hardware land together. Splitting a set across two consignments is how a site ends up with tracks but no panels.
Step 3 — Packaging That Survives the Last Metre
Ocean transit is rarely what damages joinery; unloading, storage and carrying to the room are. Ask for, and confirm on the packing list:
- Panels packed vertically or flat in rigid cases with corner protection, separated by protective interleaf.
- Door panels, tracks and hardware crated separately but referenced to the same unit number.
- Each carton marked with room, unit code and panel position, so the crew on site knows where every piece belongs.
- Moisture protection for timber components, and a packing list that matches the crate markings exactly.
Cargo insurance is worth arranging as part of the shipment rather than after an incident; confirm the cover, the declared value and who files the claim before goods move.
Step 4 — Customs Documents That Match the Crates
Our logistics team prepares commercial invoices, packing lists, certificates of origin and import permits. The practical rule for a project buyer is simple: the paperwork must describe what is actually in the crates, unit by unit.
- declare made-to-measure joinery as such; "custom size" on the invoice prevents an inspection from stalling over unexplained dimensions.
- Keep one agreed Incoterm for the whole order — who pays freight, who clears customs, and where risk transfers.
- Name duties and clearance responsibilities before shipping, not after arrival at port.
Import terms, duties and permitted-entry requirements differ by country and change over time. Confirm them for the destination with your own broker or clearing agent; we supply the shipping documents, but the compliance decision on the receiving side is yours.
Step 5 — Receive, Inspect, Then Install
Give the site team a defined inspection window before the installers commit:
- Count against the packing list while the crates are still in the delivery area, and photograph any damage on the crate before opening it.
- Check panel faces and edges for crush, scratch and warp; check that tracks and hardware for each unit are present.
- Cross-check dimensions against the approved shop drawing on at least one carcass per room type, before any unit goes against a wall.
- Store flat, dry and off the floor until installation, in the building where the wardrobes will be fitted, not outdoors.
Installation follows our after-sales support scope: on-site installation, inspection and snag list, then spare parts or replacement where needed. If a wall turns out to be out of plumb, that is caught at setting-out — not when the doors refuse to slide.
Step 6 — Handover Snags to Expect
- Door panels rubbing at one end: usually a track level or wall alignment issue, corrected by adjustment rather than re-manufacture.
- Gaps at ceiling or skirting: resolved with scribing or a filler panel agreed on site.
- Hardware finish mismatch: caught by comparing the delivered sample against the approved finish card at unloading.
Recording these items in one snag list, signed off by both sides, keeps the order closed out cleanly and makes any replacement request specific.
Delivery Readiness Checklist
- Shop drawings approved and dated; site dimensions re-verified before production release
- Finish, veneer or laminate and hardware confirmed against a physical sample
- Unit numbers on drawings matched to crate markings and the packing list
- Incoterm, freight mode, insurance and clearing agent agreed in writing
- Container consolidation plan agreed with the rest of the fit-out package
- Inspection window, storage location and installation crew booked against the arrival date
Ordering Wardrobes as Part of a Larger Package
Wardrobes rarely travel alone. Coordinating them with furniture series items and the rest of the joinery on one shipment reduces handling, keeps finishes matched, and gives a single delivery date for the site team to plan around.
As a China-based furniture and building materials manufacturer working on villa, hospitality and office projects, we handle design consultation, custom and OEM production, quality control, project management and door-to-door delivery as one scope. That means one point of contact between your drawings and your loading dock.
Planning a wardrobe order for an overseas project? Send us the room dimensions, layout brief and target site date, and we will return production, packing and delivery options for your review.