A wardrobe enquiry looks simple on paper: a room, a door style, a wood species. In practice, the quote you get back can vary widely depending on what the supplier knows about your opening, your storage plan and your finish expectations before they price it. If cherry solid wood wardrobes are on your shortlist, the preparation below is what turns a rough estimate into a buildable specification.

Start with the room, not the door

Cherry is a solid timber that reads warm and takes an amber tone over time, which suits bedroom joinery in villas and apartments. It also behaves differently from veneer or melamine once you cut it to a non-standard height or wrap it around a corner, so the first thing a supplier needs is the space rather than a picture of a door.

  • Floor-to-ceiling height at several points along the wall, since slab floors and ceiling cornices are rarely parallel.
  • Total run length, plus depth behind any skirting, architrave, radiator or air-conditioning return.
  • Position of switches, sockets, downlights and windows that will sit against or above the carcass.
  • Floor finish to be laid — timber, tile or carpet — and whether the wardrobe is fitted before or after it.

A sketch with these dimensions, even a hand-drawn one photographed on site, removes most of the guesswork. Our interior design services start from the same inputs: space layout planning, concept and mood direction, then furniture layouts and 3D renderings before anything goes into production.

Decide the storage layout before choosing the front

Two wardrobes of identical width can feel completely different to live with, because hanging height, drawer count and shelf spacing are what you use daily. Send your supplier a rooming list rather than a mood board alone:

  • Long-hang section for coats and dresses — confirm the drop you need.
  • Double-hang for shirts and folded stacks, with the mid-shelf set to your heights.
  • Drawers: number, whether they are internal or front-facing, and what goes in them.
  • Open display bays, trouser pull-outs, jewellery trays, lighting inside the carcass.
  • Anything that must be concealed: vacuum, ironing board, luggage, safe.

This list also protects the budget. Once the internal layout is fixed, changing only the door profile or handle is a small revision; changing internals after drawings are approved is not.

Know which parts of the wardrobe you want in solid cherry

"Solid wood wardrobe" covers a range of constructions, and price follows how much solid timber is used. Be explicit about which elements carry the species:

ElementWhat to confirm with the supplier
DoorsSolid cherry stiles and rails with a panel; profile (flat, raised, arched); how many panels per door.
Carcass and shelvingMaterial specified for the box, back panel and shelves, and whether it matches or complements the doors.
FinishClear lacquer, matte or satin sheen, stained tone, and how edges are treated where two boards meet.
IronmongeryHinges, slides, soft close, handle or integrated pull; load rating for deep drawers.
Related joineryMatching bedside panels, sideboards or vanity units, if the same species should run through the room.

Our cherry solid wood wardrobes sit within a made-to-measure range: sizing, material and finish options and the layout are specified per project, so dimensions and selected specifications are confirmed with you before production rather than chosen from a fixed catalogue size.

Bring reference images, but expect substitutions

Photographs of wardrobes you like are useful, provided you treat them as intent rather than a specification. A door in one photo may be solid timber, another a moulded panel with veneer; grain figure and board width vary between batches of any timber. Ask the supplier to state plainly which parts match your reference and where construction or species would differ — that single answer usually explains most of a price gap.

Where exact matching matters, for example wardrobes made to sit beside existing classic sideboards or doors being replaced in the same room, send a physical sample or an accurate colour reference along with your drawings.

Set out the delivery and fitting reality early

Solid timber joinery is built to millimetre tolerances, so site conditions belong in the enquiry from day one. Tell your supplier:

  • Whether the room will be painted and floored before installation week.
  • Lift size, stair width or turning radius for panels travelling to an upper floor.
  • Who prepares the walls, levels the floor and supplies electrical connection for internal lighting.
  • The date other trades finish in the bedroom, and who signs off the site afterwards.

For projects outside China, we handle the freight side as part of logistics and door-to-door delivery: sea, air and rail forwarding, export paperwork, packaging and container loading, shipment tracking and delivery to site. Import terms, duties and transit arrangements are confirmed case by case with your project, since they depend on destination and order composition.

What a complete enquiry pack looks like

Before you press send, check that your message carries: measured drawings of the wall with heights at several points; the storage rooming list; the parts you want in solid cherry and the finish you expect; door profile and ironmongery preference; reference images labelled as intent; site readiness dates and access constraints; destination city and delivery address; target programme date. That is enough for a manufacturer to quote properly and flag risks before drawings are issued.

With that pack in hand, ask for a quotation broken down by wardrobe section, plus shop drawings for your approval before production starts. Our cooperation sequence follows the same order — project brief and design proposal, then quotation and detail confirmation, then production, shipment and follow-up — so nothing is cut until you have signed off the drawings.

If a wardrobe is one item in a wider fit-out, sourcing it alongside flooring, doors, kitchen cabinetry, vanities and lighting through one custom and OEM service keeps species, stain tone and ironmongery consistent across the building, and puts a single production schedule and one set of shop drawings in your hands instead of several.

Send SANTERSON your measured drawings, storage list and finish preference, and we will return a section-by-section quotation with shop drawings for approval. Phone / WhatsApp: +86-13928214007 (PHILLIP) — contact us.