Two units can share the same footprint, the same jet count and even the same rated power, yet behave very differently once they are filled, heated and used every week. This guide uses Outdoor Swim Spa WS-115FⅨ as the reference unit and walks through the material and finish decisions that actually change how a swim spa performs outdoors.

Outdoor Swim Spa WS-115FⅨ

The shell is the part that holds water, carries the jets and takes every scrape from a swimsuit or a floating toy. In our hydrotherapy range the shells are acrylic, the same material family used across our customizable shape outdoor spa line, where square, round, oval and curved forms all depend on a shell that can be formed, reinforced and refinished.

Acrylic earns its place for three practical reasons. It can be formed into the contoured seating and jet pockets a hydrotherapy spa needs, so the jets land against the shoulders and calves rather than being drilled into a flat wall. It is repairable — a light surface scratch on an acrylic shell can usually be polished out on site, which matters on a project where the unit has been craned over a terrace or unloaded by hand. And it holds colour through the ultraviolet exposure that fades painted or coated surfaces.

When you compare shells between models, ask three questions rather than accepting "premium acrylic" as an answer:

  • Is the shell a single formed piece, and how is it reinforced behind the water side? Our premium outdoor swim spa listing describes a robust acrylic interior with a reinforced cabinet, which is the construction to look for on any unit you compare.
  • What carries the jet fittings — the acrylic alone, or a supporting frame behind each cluster?
  • How is the shell supported underneath, and does that support reach the full base or only the perimeter?

The last question matters more than it looks on a datasheet. A spa of this size is heavy once filled, and a unit supported only around its edge will flex, transmit vibration to the cabinet and eventually work at the jet seals. Our units are built with a reinforced cabinet that carries the shell across its base.

The Cabinet Finish Is an Outdoor Decision

WS-115FⅨ is sold as an outdoor unit, which puts the cabinet in continuous sun, rain and — depending on your site — salt air. The cabinet does two jobs: it insulates the shell and it is the visible surface of the installation. Treat those separately.

Cabinet cladding

For poolside and terrace work we generally specify a synthetic wood-look panel or an aluminium-based cladding rather than solid timber. Solid timber in permanent outdoor exposure needs a refinishing cycle every season or two; the synthetic alternatives hold their colour and do not absorb water at the base edge, where splash-out collects. If the spa sits against a rendered or tiled wall, the cladding choice should match what the façade contractor is already using — our stone and marble panels and decorative profiles let the spa plinth be finished in the same material as the surrounding wall, so the unit reads as built-in instead of dropped in.

Insulation

Insulation is where two spas that look identical on the deck end up with very different running costs. Our catalogue lists insulation as a selectable option alongside heat pumps and control systems, because the required thickness depends on the climate and on whether the spa is heated year-round. Ask what the insulation actually is — full foam filling the cabinet cavity, or board panels against the shell — and whether the lid is insulated to the same standard. A well-insulated shell with a thin lid loses most of its heat through the top.

Hardware Finish: What Corrodes First

The visible chrome and stainless items — jet faces, headrests, handrails, step edges, light bezels — are the first thing a buyer sees and the first thing that disappoints after two years of unmanaged exposure. On an outdoor spa, ask for solid corrosion-resistant metal here: 316-grade stainless steel or properly anodised aluminium rather than decorative plated zinc. Where our wider catalogue specifies metal for exterior use, such as aluminium honeycomb panels for building exterior and interior wall cladding and laser-cut stainless screens, the same logic applies: grade and finish are set by the exposure, not by the price line.

For coastal or high-humidity sites, request the hardware grade in writing on the quotation, and check that the jet bodies behind the faceplate are compatible with your water treatment plan. A good faceplate fitted to a poor body is still a leak.

How WS-115FⅨ Sits Against Neighbouring Models

Within the 115 series, the shell construction and equipment layout are consistent; what changes between variants is length and how the swim end is configured. WS-115FⅨ is catalogued at 5000 × 2200 × 1250 mm with a control system, one swim training system, water pump, filter pump, 24 jets and four LED lights, at a total power figure of 8.05 kW. The shorter WS-115AⅨ keeps the same jet count, lighting and power in a 3880 mm shell — so if you do not need continuous swim length, you gain floor area rather than performance.

ModelCatalogue dimensions (mm)Swim training systemJetsTotal power
WS-115AⅨ3880 × 2200 × 1250Yes248.05 kW
WS-115FⅨ5000 × 2200 × 1250Yes248.05 kW
WS-130AⅨ8000 × 3000 × 1400Yes2010.85 kW

Read that table as a site-planning tool, not a ranking. The two 115 variants draw the same power and carry the same jet count, so the choice between them is about how much swim length your users need and how much deck you can give up. Step up to the 8000 mm class when the spa has to serve lap swimmers and a separate hydrotherapy zone at the same time — and note that the larger shell also carries a higher power figure, which changes the electrical supply your contractor has to provide.

A Buyer's Checklist Before You Order

  • Confirm the shell material and its reinforcement method on the quotation, not just in the brochure.
  • Specify cabinet cladding by exposure: coastal, shaded, or full sun.
  • State the insulation type and whether the cover is included at the same specification.
  • Ask for the stainless grade of every jet face, rail and fitting.
  • Confirm which equipment is standard on your configuration and which — heat pump, UV sterilisation, sand filtration, steps, control system — is optional.
  • Confirm the total power figure against the supply available on site, including any heat pump added later.

Figures quoted above are transcribed from the catalogue listing for each model. Included equipment and electrical requirements vary by configuration, so confirm both against your selected specification before ordering.

Getting the Finish Right on Site

SANTERSON has manufactured furniture and building materials since 2008 and supplies swim spas as part of a wider package that also covers the surrounding finishes, outdoor furniture and interior fixtures. That matters for a spa install: the plinth tiling, the loungers beside it and the changing-room cabinetry are usually ordered separately by three different trades, and the joints between them are where the quality of the project shows.

Send us the plan, the exposure of the site and the equipment you want in the spa. We will confirm the configuration for WS-115FⅨ or the variant that fits your deck, specify the insulation and hardware grade against your climate, and coordinate delivery to site.

Specify your swim spa configuration

Talk to our project team about Outdoor Swim Spa WS-115FⅨ, the wider outdoor swim spa range, and matching poolside finishes.

Contact PHILLIP — Phone / WhatsApp +86-13928214007  ·  santerson@qq.com