A quotation for the Outdoor Swim Spa WS-P001 usually arrives as a one-page PDF with a model number, a list of fittings and a delivered price. Two suppliers can send you very different documents for the same footprint, and the difference is rarely visible in the headline figure. The checklist below shows what to verify line by line before you accept a proposal, using WS-P001 as the worked example.
Start With the Footprint, Not the Jet Count
The catalog entry for WS-P001 gives an overall size of 3500 × 950 mm. Read it against your site drawing before you read anything else on the quotation. A swim spa of this length is a narrow, elongated basin, so the practical questions are where the steps land, which way the plant access panel faces, and whether the finished deck leaves room for maintenance. Confirm on the drawing that:
- The external dimension in the proposal matches the catalog figure you were quoted, including any cladding or step package added later.
- Basin depth, water level and overflow position are stated, because they determine the deck detail at the edge.
- Cabinet access is on a side you can actually reach once the surround is built.
Where the proposal and the catalog disagree on a dimension, treat the proposal as unconfirmed until the manufacturer reissues it. Do not let an installer build to a number that only appears in one document.
Read the Equipment Schedule as a Scope Document
The published specification for WS-P001 lists a control system of 1 set, water pumps of 2 pcs, a filter pump of 1 pc, a jet total of 81 pcs, LED lights of 2 pcs and a total power of 8.35 kW, with water jets, LED lighting and ozone shown as the fitted features. Those figures are useful for comparison, but they are catalog values for a standard configuration — not a promise about the exact unit you will receive.
| Line in the proposal | What to confirm before signing |
|---|---|
| Model and dimensions | The model code matches WS-P001, and the dimensions are written with units and an explicit "external" or "basin" qualifier. |
| Jets (catalog: 81 pcs) | How many are hydrotherapy jets, how many are directional or adjustable, and which seats each jet group serves. |
| Pumps (2 water pumps, 1 filter pump) | Pump duty and whether variable-speed operation is included; this drives running noise more than any other single item. |
| Total power (catalog: 8.35 kW) | Whether the figure covers only the standard build or already includes a heat pump, and what supply it assumes. |
| Ozone and LED lighting | Whether ozone is stated as fitted water treatment or offered as an option, and whether the two LED fittings are inboard lights or accent strips. |
| Options row | UV sterilisation, additional water pumps, heat pump, sand filtration, insulation and steps are listed separately with their own prices. |
The options published for this range also vary in availability between models. A proposal that quietly drops an option you asked for, or bundles it into a single line price, should be sent back for a re-quoted schedule.
Ask the Electrical Question Early
The catalog total power of 8.35 kW is a figure for the standard configuration as listed. Your electrical design depends on details that sit outside that number: the supply voltage and phase available at the site, the dedicated circuit and protective device arrangement, the routing and termination point for the cable, and how any added heat pump changes the connected load.
Put these questions to the manufacturer in writing and keep the answers with the quotation:
- What supply does the quoted configuration assume, and what is the maximum connected load with your selected options fitted?
- Who specifies the isolator, cable size and protection — the supplier or the local electrical contractor?
- Is the control system wall-mounted, cabinet-mounted or remote, and where can it sit relative to the basin for service access?
- Which items are supplied pre-wired to a factory termination, and which are terminated on site?
Any electrical work must be carried out and signed off by a licensed contractor in the country of installation. A supplier’s specification tells you what the equipment needs; it does not tell you what your local rules require.
Check What the Price Actually Covers
A swim spa is a heavy, awkward shipment, and most disputes after order come from the gap between "quoted" and "delivered". Ask for the quotation in the Incoterms you intend to buy on, and check each of these lines:
- Packaging method and container loading plan, plus whether the unit ships as one package or split into shell, cabinet and plant.
- Freight mode and the point at which responsibility transfers to you.
- Export paperwork supplied — commercial invoice, packing list, certificate of origin — and what you must arrange for import clearance yourself.
- Cargo insurance: whether it is included, and at what declared value.
- Lifting and placement on site: who provides the crane or forklift, and where the delivery vehicle can actually reach.
SANTERSON describes freight forwarding by sea, air and rail with customs paperwork, packaging and container loading, shipment tracking and door-to-door delivery as part of its logistics service. Marketing copy is not a delivery commitment. For an Australian site specifically, ask for the landed terms in writing and confirm duties, transit time and the final delivery address before you rely on any of it.
Compare Proposals Against Your Wider Fit-Out
Swim spas are rarely bought alone. On a villa or resort project they arrive alongside poolside loungers, shade structures, paving and wet-area finishes, and the coordination between those packages is where a supplier either saves you time or costs you money. A single supplier specifying the basin together with the surrounding outdoor furniture can resolve deck levels, drainage falls and sightlines once instead of twice.
If you are comparing several manufacturers, ask each for the same three things so the comparison is honest: a fixed equipment schedule for WS-P001 with every option priced separately, a written electrical requirement, and a delivered price on one named Incoterm. Proposals that differ in scope cannot be compared by price alone.
Installation and After-Sales Terms Worth Naming
The installation and after-sales support a supplier offers is only useful if it is specific. Ask which parts of commissioning are covered, what the warranty excludes — water chemistry damage and unauthorised electrical work are common exclusions in this category — how spare parts for pumps, jets and controls are sourced, and who attends site if a plant component fails.
Get the response-time commitments you are told about into the contract. A stated aim on a website is not an obligation until it appears in your order documents.
A Simple Scoring Sheet
Score each proposal out of five on these six points. Anything below four needs a written answer before you shortlist it.
- Specification clarity: model, dimensions and equipment schedule confirmed for your configuration.
- Electrical transparency: supply assumption and connected load stated.
- Options priced separately: heat pump, insulation, filtration, steps, sterilisation.
- Delivery scope: named Incoterm, paperwork list, insurance, lifting responsibility.
- Site coordination: interface with deck, paving and poolside furniture addressed.
- After-sales: warranty scope, exclusions and spare-parts route in writing.
Frequently Asked Questions
Is WS-P001 a swim spa or a plunge spa?
The catalog lists it within the configurable outdoor swim and hydrotherapy range, and its 3500 × 950 mm footprint is shorter than the longer models in that range. The published specification does not list a swim training system for WS-P001, while several other models in the same range do. If you want continuous swimming against a current, ask explicitly whether a swim unit can be fitted to this basin and how it affects total power.
Why do two proposals for the same model differ so much in price?
Usually because of what sits outside the shell: insulation package, filtration type, heat pump, steps, control system, and where the freight obligation ends. Compare the schedules line by line rather than the totals.
Can the same supplier provide the surrounding outdoor furniture?
SANTERSON supplies outdoor furniture alongside swimming pools and swim spas through its swimming pool range and wider product catalogue, and offers custom and OEM work where finishes need to match an existing scheme. Ask for the specific items, finishes and dimensions you need rather than assuming a bundled package exists.
Before you sign a proposal for WS-P001, send your site drawing and required options to the manufacturer and ask for a confirmed equipment schedule, the electrical requirement for that configuration, and a delivered price on a named Incoterm. Start the conversation through the contact page and keep every confirmation in writing.