A flexible rammed earth panel looks like a traditional earth wall but arrives as a thin, bendable sheet that can be wrapped around columns and curved feature walls. That single difference changes the whole job: instead of building thickness out on site, the project team fixes a lightweight cladding to a prepared substrate. The plan below covers every item a contractor, designer or project buyer should settle before the material ships, so the wall is approved, measured and installed without rework.
1. Confirm the Design Intent Before Any Panel Is Ordered
The MCM Flexible Rammed Earth Panel - Bendable Soft Stone Wall Cladding is a modified clay flexible stone product that reproduces the rough, layered surface of rammed earth. It is supplied as a thin sheet that can be bent onto curved walls, cylinders and shaped surfaces, which makes it suitable for villa feature walls, homestay and restaurant interiors, retail fronts, exhibition halls, cultural and heritage-style renovation, and exterior wall renewal.
Before measurement, lock down four design decisions on the drawing:
- Surface scope — which walls are flat, which are curved, and where the panel stops (floor line, ceiling line, reveal to another finish).
- Colour — the product is offered in white and earth brown tones; state the colour per wall elevation so a single batch covers one visual zone.
- Joint direction and layout — decide whether joints run vertically or horizontally, and where the opening joint sits relative to the room's main sight line.
- Interior or exterior exposure — external walls need an approved adhesive system and detailing at the top edge and corners; state this on the drawing rather than deciding it on site.
2. Record the Substrate Condition Wall by Wall
This material is bonded to the base, so the base does the structural work. The panel can be fixed directly to a cement-based substrate or to gypsum board with tile adhesive. Everything in the installation plan depends on what is actually behind the finished surface, and that has to be recorded before ordering, not after delivery.
| Substrate found on site | What the plan must state |
|---|---|
| Cement / mortar render | Sound, fully cured and free of dust, oil and loose particles; check for hollow spots by tapping and note any area that needs re-skimming. |
| Gypsum board partition | Board thickness, joint treatment completed, screw heads countersunk and filled, and a level surface confirmed before adhesive is applied. |
| Existing tile, stone or painted wall (renovation) | Bonding suitability of the old surface, whether mechanical keying or a prepared primer is required, and the extra thickness added to reveals and skirtings. |
| External facade | Weatherproofing strategy at joints and edges, drainage behind the cladding where relevant, and adhesive selection approved for outdoor exposure. |
For each wall, note the flatness deviation across a straight edge. Flexible sheet material follows the substrate; it does not correct it. Deviations left unresolved show as visible shadows in the finished surface once light runs along the wall.
3. Produce a Measured Layout and Cutting Schedule
Panels are cut on site with simple tools, so the schedule exists to control where those cuts fall rather than to avoid them. A usable layout drawing for this type of cladding includes:
- Every wall elevation with finished dimensions and the height datum marked.
- The radius of each curved wall or column, plus how many bends occur in one sheet.
- Positions of sockets, switches, air diffusers, handrails, mirror fixings and any built-in item that must be cut around.
- Joint grid and the size of the smallest offcut allowed at external and internal corners.
- Number of full sheets per elevation, with waste allowance for cuts and site damage.
Small radius work deserves separate attention. A tight cylinder needs a sheet that can be bent without stressing the surface, so the layout should show the seam on the side least visible from the main approach. Where several identical columns appear in a lobby or restaurant corridor, mark them as one batch so colour and texture stay consistent.
4. Specify Adhesive, Tools and Fixing Sequence
The published installation method for this product is straightforward: bond the sheet to a cement base or gypsum board with tile adhesive, cut on site with simple tools, then treat the joints. The plan should name the specific products rather than leave them to whoever arrives first:
- Adhesive — tile adhesive suitable for the substrate and exposure; for exterior walls or wet areas, select a system rated for that use.
- Application tool — notched trowel sized to the sheet, so coverage is even behind the full panel face.
- Cutting tool — a straight blade and guide for straight cuts, plus a template method for cut-outs around services.
- Joint treatment — the agreed finish for joints and inside corners, matched to the colour of the sheet.
- Support items — spacers for consistent joint width, and protection for the finished face during follow-on trades.
A short sequence written into the plan prevents most disputes: prepare and clean the base, mark the layout, apply adhesive, fix the sheet from the bottom up, cut openings, treat joints, then remove protection only after other trades have finished their work on that wall.
5. Build a Sample Wall Before Production Is Released
Flexible stone cladding is judged by eye: the depth of the rammed earth texture, how the colour reads under the room's lighting, and whether joints disappear at normal viewing distance. A sample wall settles all three in one session.
- Build at least one square metre with the actual adhesive on the actual substrate type.
- Light it the way the finished room will be lit, including any grazing light along the wall.
- Include one joint and one inside corner in the sample.
- Bend a piece to the tightest radius in the design and check the surface for stress at the edge.
- Get written sign-off from the designer or client, with the approved sample kept on site as the reference.
6. Plan Delivery, Handling and Quantities
Because the sheets are thin and light, transport and handling are simpler than for rigid stone, which also means fewer restrictions on how much can move per trip to upper floors or tight residential sites. The quantity plan should still be explicit:
- Order from one production batch per visual zone, and record the colour name used on the order.
- Add a spare quantity for cut-offs, future repairs and any panel damaged during handling; size the allowance to the number of cuts on the elevations.
- Store sheets flat and dry, away from direct load, until the day they go on the wall.
- Schedule delivery after wet trades and gypsum work are complete, so the substrate is ready when the material arrives.
7. Coordinate the Cladding with Adjacent Finishes
Wall cladding fails at its edges far more often than in the middle of a field. The installation plan should show how the panel meets floor, ceiling, window frame, door lining and any joinery built by another supplier. Where a project also uses other wall panels and wall cladding finishes — for example a flexible wood grain cement panel in an adjacent corridor or a rigid composite panel on the facade — set out one drawing that fixes the reveal line between each material, so the thickness difference is resolved in the design instead of on site.
Projects combining this cladding with other fit-out products benefit from placing wall finishes, joinery and fixtures with one supplier. A single custom and OEM service covering materials, dimensions and finishes keeps the wall build-up, the cabinetry that abuts it and the fixing details in one coordination loop.
8. Define Inspection Points and Handover Records
Close out the plan with clear acceptance criteria, agreed before work starts:
| Stage | Check before moving on |
|---|---|
| Base preparation | Substrate clean, dry, sound and flat; hollow areas repaired; gypsum joints finished. |
| Adhesive open time | Coverage across the sheet face confirmed on the first panels fixed. |
| Panel fixing | Alignment to the layout line, consistent joint width, no lifting at edges or corners. |
| Cut-outs and bends | Openings clean around services; curved work free of edge stress and surface marks. |
| Joint treatment | Joints and inside corners filled and colour matched, inspected under raking light. |
| Handover | Spare sheets stored on site or handed to the client, with batch and colour details recorded for future repair. |
For projects where the wall also carries lighting, mirrors or shelving, record fixing positions before handover. Drilling into a finished flexible cladding after the fact leaves visible damage that cannot be patched invisibly.
A Ready-to-Use Checklist
- Design intent confirmed: colour, joint direction, curved zones and interior or exterior exposure.
- Substrate recorded wall by wall, with flatness deviations noted.
- Measured elevations, radii and a cutting schedule issued to the site team.
- Adhesive, tools, joint treatment and fixing sequence named in writing.
- Sample wall built under real lighting and signed off.
- Single-batch order, spares allowance and storage plan agreed.
- Edge details with floor, ceiling, joinery and other cladding finishes drawn.
- Inspection stages and handover records defined before work begins.
Plan your wall cladding package with SANTERSON. Send the elevations, the curved-wall radii and the exposure conditions for each wall, and the team confirms colour, quantity and fixing details for your project — alongside cabinetry, fixtures and other fit-out products coordinated through one supplier.