A request for quote (RFQ) for frosted glass wardrobes often comes back with very different prices from different suppliers, and none of them directly comparable. The reason is rarely dishonesty. It is that the enquiry left the costly variables open, so each manufacturer quoted the product they assumed you wanted. This guide lists what a buyer should put in writing before asking for a price on frosted glass wardrobes, and how to read the quotations that come back.
Why Frosted Glass Wardrobe Quotes Are Hard to Compare
A wardrobe with frosted glass fronts is not one product. It is a set of built-in furniture assembled from a carcass material, a door construction, a glass type and its surface treatment, a frame or edge profile, hardware, an internal layout and a delivery destination. Change one of those variables and the price moves; leave it unstated and every supplier fills the gap differently.
Frosted glass adds two specific complications. First, opacity is a finish decision that changes how the interior reads in a bedroom, so the internal layout becomes visible design work rather than storage plumbing. Second, glass is a fragile, heavy component that must be dimensioned before it is cut and then shipped, so late size changes are expensive in a way that a late change of paint colour is not.
Frosted fronts also appear across more than one door family at SANTERSON. The Frosted Glass Wardrobes sit in the glass door wardrobe collection, while the Frosted Glass Aluminum Frame Wardrobes sit in the glass and aluminium frame collection. Both are made to measure, with finish, layout and dimensions specified per project — which is precisely why an RFQ has to state those things rather than name a style and hope.
1. The Room Record: Sizes, Datum Line, Floor and Ceiling Reality
Everything downstream depends on the opening, so start the RFQ with the measured shell, not with a mood board.
- Width, height and depth per wall run, recorded in millimetres, with the run identified by room name and wall orientation.
- A stated datum — say which measurement is taken from finished floor level and which from the structural slab. On renovation jobs the finished floor rises after the wardrobe is ordered; if the RFQ does not say which level applies, one party will be wrong.
- Floor and ceiling condition: whether floors are level, whether ceilings are flat, and whether there are skirtings, cornices, bulkheads or scribes to work around. A made-to-measure carcass can absorb small variance, but only if it knows the variance exists.
- Obstructions: switch plates, sockets, radiator tails, AC diffusers, downlights, window reveals, door swings and any pipework that runs inside the intended wardrobe zone.
- Access route at both ends: stair width, lift car dimensions, corridor turns, tight corners and gate heights at the delivery address. This determines whether a full-height panel can physically reach the room.
2. Door Type and How the Frosted Glass Is Applied
State the operating principle you want, because sliding, hinged and walk-in arrangements use different engineering and different hardware classes.
- Sliding — suits rooms where a door swing would clash with the bed or an en-suite entry. If you want glass sliding fronts, name them explicitly; see Glass Sliding Door Wardrobes.
- Hinged — needs clear swing space, and full-height hinged glass fronts need the hardware to be specified rather than assumed.
- Framed glass versus solid-panel doors — a frosted panel carried in an aluminium frame is a different build from a wardrobe whose door is itself the glass leaf. The two families on this site are catalogued separately, and they are not interchangeable line items.
- Walk-in or open arrangements — if part of the run is open and part is closed with frosted fronts, say so in the RFQ; mixed runs change both the price and the sequencing on site.
3. The Glass Specification: Opacity, Texture, Safety, Edge
"Frosted glass" is not a specification. Put these five points in writing:
| Item to state | Why it changes price or outcome |
|---|---|
| Frosting method | Satin-etched, filmed or ribbed/reeded glass all diffuse light differently and age differently. The catalogue includes options such as Ribbed Glass Wardrobes, which read as a different front from a flat satin finish. |
| Opacity level | How much of the interior silhouette shows through is the main aesthetic decision. Ask for a physical sample rather than a photograph, because camera exposure flattens the difference between finishes. |
| Glass position and construction | Whether the glass is a structural door leaf or a facing on a panel determines weight, hinge load and cost. |
| Edge treatment | Polished, seamed or mitred edges, and whether edges are exposed on the visible face. Exposed edges need more careful handling in production and in transit. |
| Safety and handling requirements for your market | State the destination country and let the manufacturer confirm the glass construction and build-up they will supply for that project. Do not assume a domestic specification transfers to a commercial or export job. |
4. Carcass, Interior Layout and Hardware
The inside of the wardrobe is where most budget is hidden, so give the manufacturer your storage programme rather than asking them to invent one.
- Carcass material and finish, plus panel thickness if you have a preference. If you are open, say "open to the manufacturer's standard board specification for this collection" so quotations are comparable.
- Hanging zones by length: single hang, double hang, long hang for coats and dresses. Give lengths in millimetres.
- Drawer count and type, shelf counts and depths, and whether any drawers need locks for a shared or rental setting.
- Specialist items: trouser pull-outs, jewellery trays, shoe shelving, valet rods, integrated lighting, ironing or laundry integration. Each of these is a priced option that suppliers add inconsistently if the RFQ does not list them.
- Handleless or handled doors. Handleless fronts need a profile or a push mechanism, and this belongs in the door description, not buried in a footnote.
- Hinge and runner expectations, including soft close, if you have a standard. Otherwise ask each supplier to state what they fitted as standard.
5. Scope Boundaries: What the Supplier Is and Is Not Responsible For
The most expensive omissions are not product details but scope lines. State clearly in the RFQ:
- Whether site measuring is done by you or by the supplier, and who re-measures after flooring is laid.
- Who prepares the walls, floor level and any packing — usually the builder, not the joinery supplier.
- Whether electrical work for internal lighting is inside the wardrobe scope or a separate trade.
- Whether protection of the installed wardrobes during the rest of the works is included.
- The delivery point: kerbside, lift lobby, or into the room and assembled.
For export jobs this boundary matters more, because a manufacturer working as a one-stop furniture and building materials supplier may also be handling packing, container loading and freight. If the same party is responsible for both manufacture and delivery, say so in the RFQ and ask for the scope to be written back to you as a list.
6. Commercial Terms: Pricing Basis, Lead Time, Payment, Packaging
Ask every supplier to answer the same commercial questions, so the quotations sit side by side:
- Pricing basis and currency, and which Incoterms apply — ex-works, FOB, CIF or delivered-to-site. A low ex-works number and a delivered price are not comparable.
- What is included in the unit rate: design drafting, sampling, packing, marking, spares.
- Lead time stated as production time plus transit time separately, with the trigger date defined (deposit received, or drawings approved).
- Payment schedule and what happens to it if you approve drawings late.
- Packaging method for glass panels and who bears the cost of replacement if a panel is damaged in transit.
- Validity period of the quote, since board, hardware and freight inputs move.
- Whether spares — spare shelves, spare runners, one spare door leaf — can be ordered later at the same specification.
7. If You Are Buying as Part of a Larger Fit-Out
Wardrobes are rarely bought alone. In villa and apartment work they arrive with built-in furniture for other rooms — kitchen cabinetry, vanity units, media walls, doors and panelling — and the finish schedule has to match across all of them. If that is your situation, ask whether the same manufacturer can supply the whole built-in package and produce one coordinated drawing set. A single custom furniture and interior products manufacturer covering several trades reduces the number of interfaces where finishes get mismatched, and it puts one party on the hook for coordination.
Project buyers should also ask for a sample pack before contract: a carcass corner, a door edge with the frosted glass applied, a hardware sample, and — for multi-unit jobs — one wardrobe built as a mock-up for approval. For villa and hotel work handled through a turnkey interior project solution, that mock-up approval is the point at which finish, layout and build quality get signed off before the rest of the units are put into production.
A Ready-to-Use RFQ Checklist
- Room identification, measured runs in millimetres, stated datum level, floor and ceiling condition
- Photographs or a sketch showing obstructions and access route at site
- Door type: sliding, hinged, framed glass or glass-fronted panel; walk-in sections identified
- Glass: frosting method, opacity, construction, edge treatment, sample requested
- Carcass material and thickness, or explicit "manufacturer standard"
- Internal programme: hang lengths, shelf counts, drawer counts and types, specialist items
- Handleless or handled; hardware expectations and soft-close requirements
- Scope boundary: measuring, site preparation, electrical, protection, delivery point
- Pricing basis and Incoterms, currency, inclusions, quote validity
- Production lead time and transit time stated separately, with the trigger date
- Packaging method for glass and damage-replacement terms
- Sample pack and mock-up approval before full production
- Spare-parts availability after handover
Frequently Asked Questions
Should I send drawings or just dimensions?
Send both if you have them. If you only have dimensions, send annotated photographs of each wall run. A supplier cannot price a door type they cannot see the context for.
Is it better to ask for one price for the whole wardrobe or prices by component?
Ask for both: a total per run, and a breakdown by carcass, door leaf, glass, hardware and internal fittings. The breakdown is what lets you compare two suppliers honestly and decide where to spend.
When should the frosted glass finish be decided?
Before drawings are released for production, and after you have seen a physical sample in the actual room light. It is one of the cheapest decisions to make early and one of the more expensive ones to reverse.
Send us your wardrobe enquiry
Tell us the room, the measured runs, the door type and the finish you are considering. As a furniture and building materials manufacturer working on villa, hotel and apartment projects, SANTERSON can quote made-to-measure wardrobes against your drawings, confirm the specification with a sample pack before production, and handle packing, freight and delivery to site.
Contact PHILLIP — Phone / WhatsApp: +86-13928214007 · Email: santerson@qq.com