A carpet quotation for guest room flooring rarely fails on price alone. It fails on missing information: the wrong repeat scale, an unspecified pile height at the bedside, or a pattern that was never tested against the room's lighting. Below is the exact brief we need to quote our custom blue white stripe ink pattern carpet for hotel guest rooms — and what each item changes in the finished floor.

Why This Pattern Needs a Brief, Not Just a Colour Code

The design pairs vertical blue-and-white banding with a soft ink-wash abstraction that bleeds across the stripes. That combination is what makes it work in a modern guest room — and what makes it sensitive to scale. The same motif printed at 1:1 on a runner reads as texture; enlarged to wall-to-wall width in a 28 sq m room, it can read as noise behind the bed.

Because we make this carpet to order — size, colour and fibre blend are all set per project rather than picked from stock rolls — the information you send directly determines whether the first sample matches what you pictured. Send the items below and we can return a firm quotation with a sample plan instead of a range of guesses.

1. Room Dimensions and Installation Layout

Give us the clear floor dimensions of each guest room type, in metres, plus how the carpet is intended to be laid. Wall-to-wall in a standard guest room, wall-to-wall with a bedside inset, or a loose area rug under the bed are three different products with different waste allowances and different pattern layouts.

What to sendWhy it matters for the quote
Clear length and width per room type, in metresSets roll width choice and cutting waste; narrow corridors and standard rooms are quoted differently
Room type breakdown (standard, deluxe, suite, corridor)Pattern scale can be adjusted per type without changing the design intent
Total area or number of keys per typeDrives production batch size and whether one dye lot is enough for the whole order
Fixing method: direct glue, double-sided tape, or loose layAffects backing specification and underlay recommendation
Transition details at door thresholds and skirtingDetermines edge finishing and how pile height meets adjacent flooring

If your drawings are still at concept stage, send the room count and typical dimensions from the design pack — we can quote an indicative figure and refine it once measured surveys arrive.

2. Pattern Scale, Repeat and Direction

This is where guest room carpets most often go wrong. Tell us:

  • Repeat size you expect — the width of one stripe cycle in centimetres, or a reference photo with an object of known size in it.
  • Pattern direction relative to the bed — stripes running head-to-foot elongate a narrow room; running side-to-side widen it. State which your designer intends.
  • Where the pattern should be centred — on the bed axis, on the window wall, or trimmed evenly at both walls.
  • Crop tolerance — whether a partial stripe at the wall is acceptable, or the layout must finish on a full repeat.

A simple annotated floor plan, even hand-drawn and photographed, removes most of this ambiguity. If you have a reference image from another property where the scale worked, send that too — it is faster than describing proportions in words.

3. Colour Reference and Lighting Conditions

Blue on white shifts noticeably with lighting temperature and pile direction. Please specify:

  • A colour standard where one exists — Pantone reference, or a physical swatch posted to us.
  • The blue range you are working within: the cooler slate end of this design, or the deeper ink tones.
  • Lamp colour temperature in the guest rooms (for example 2700 K warm white versus 4000 K neutral), and whether daylight dominates the room.
  • Whether the whites should stay pure or move toward a warm ivory to sit with your wall and joinery palette.

Colour matching on an ink-wash pattern is graded, not binary: the wash fades through several tones between full saturation and white. Confirm which tone in that gradient is your anchor colour, and we match against it.

4. Fibre, Pile and Backing Specification

Fibre blend is chosen for traffic and maintenance, not appearance. Tell us the traffic level of the space and how housekeeping will care for it, then we recommend the blend; or specify your own if you already have a standard.

  • Traffic band: guest room only, guest room plus corridor, or public area. Corridor and lobby use need a tighter, denser construction than a bedroom floor.
  • Pile preference: low and firm for suitcase wheels and easy rolling, or higher and softer underfoot at the bedside.
  • Fibre direction: wool, nylon, or a blend — we make to your specification across all three.
  • Maintenance regime: daily vacuuming, periodic extraction cleaning, spot-cleaning products used by your team.
  • Backing and underlay: fixing method from item 1, plus any acoustic requirement between floors.

Where a project needs the guest room floor to carry acoustic performance between storeys, say so at the request stage — it changes both backing and underlay, and therefore the price.

5. Quantity, Batch Planning and Phasing

Quote accuracy depends heavily on how the order is phased:

  • Total square metres and key count per room type.
  • Whether all rooms are carpeted in one phase or split across blocks, towers, or a staged opening.
  • Whether spare rolls are required for future replacement — and if so, how many years of cover you want to plan for.
  • Any mock-up room quantity separate from the production order.

Dye lots vary. For a multi-phase hotel, tell us the full programme even if only phase one is being ordered now, so we can advise on reserving material from one batch rather than matching a second lot later.

6. Sample Approval Before Production

We produce samples before starting production on this carpet. That step protects both sides, and it works best when you tell us what the sample must prove:

  • Colour approval only, or colour plus pattern scale.
  • Sample size needed — a swatch for the finish library, or a larger piece to lay in a mock-up room and view under real lighting.
  • Who signs it off, and how long sign-off typically takes on your side.
  • Whether the approved sample becomes the reference standard held for future orders.

Build one sample round into your programme before the production order closes. A sample reviewed in the actual guest room lighting — not in an office — is what prevents a costly reprint.

7. Delivery, Site Conditions and Documentation

The commercial part of the quotation needs the same level of detail as the technical part:

ItemDetails to provide
Delivery address and accessPort or site, floor level, lift dimensions, and whether rolls can be delivered horizontally
Required on-site dateThe date carpet must be available for installation, working back from your programme
Incoterms preferenceFactory, port, or door-to-door; we handle freight and customs paperwork if you want it arranged
Storage on siteWhether conditioned storage is available — carpet laid into a damp or cold slab will not behave as specified
DocumentationWhich test reports, declarations or import documents your consultant or authority requires for submission

Tell us which approvals your project requires and supply the relevant clauses. We will confirm in writing which of them this specification meets before production, rather than after.

A Ready-to-Send Request Checklist

  • Room dimensions per type, total area or key count, and installation method
  • Pattern repeat size, direction relative to the bed, centring rule and crop tolerance
  • Colour standard (Pantone or posted swatch) plus room lighting temperature
  • Traffic band, pile preference, fibre blend and housekeeping regime
  • Order phasing, spare-roll plan and mock-up quantity
  • Sample purpose, size required and who signs it off
  • Delivery address, required date, Incoterms and documentation needed for approval

If you are comparing this design against alternatives for the same room type, our blue grey ink pattern carpet for hotel guest rooms and villas uses a softer wash with less contrast between bands — useful where the blue white stripe version reads too graphic against pale joinery. For corridors, ballrooms and other public areas in the same property, our customizable commercial carpet for hotel, banquet hall and villa projects is built to a heavier construction and can carry the matching design language through the rest of the building.

SANTERSON manufactures furniture and building materials under one roof, so guest room flooring can be quoted alongside hospitality project furnishing, joinery, lighting and finishes. One specification pack, one production coordination point, one delivery programme — which is where the real saving on a guest room fit-out usually appears.

Send your brief for a firm quotation

Email your room schedule, pattern notes and colour reference to santerson@qq.com, or reach PHILLIP directly on WhatsApp at +86 13928214007. Include the room type breakdown and your required on-site date, and we will come back with a specification sheet and sample plan.

Specifications, fibre options and documentation are confirmed per project against your drawings and applicable standards before production begins. Sample approval precedes the production order.