A glass-front bar cabinet looks simple on a drawing and complicated on site. This article sets out the record procurement teams should keep when specifying Santerson Glass Front Bar Cabinets for villa, hospitality and apartment projects — what to confirm before an order is placed, and what to hold on file for handover.
Bar cabinets sit at the junction of joinery, glass, lighting, plumbing sometimes, and interior styling. That makes them a poor place to improvise. Because the Santerson range is made to measure rather than supplied in fixed sizes, almost every dimension, material and hardware decision comes back to what your team documented at specification stage. The list below follows the order in which those decisions actually get made on a project.
1. Start with the room data, not the product image
The Glass Front Bar Cabinets page describes a configurable unit for residential living projects, with finish, layout and dimensions specified per space. That means the drawing package you send is the specification. Capture these items in one place before you request a quotation:
- The opening or wall run the unit occupies, with finished floor and finished ceiling levels, plus floor-to-floor heights for each storey.
- Adjacent materials — flooring type, wall finish, skirting detail — so the site conditions can be recorded in one package.
- Services already fixed in that zone: power outlets, data points, water supply and waste for a wet bar, and any chilled-water or extraction line.
- Door swing, drawer clearance and traffic paths, including the clear width needed when the glass doors stand open.
- Access route from the loading point to the room, with lift and stair dimensions for full-height units.
A single sheet per unit, signed off by the designer and the site contractor, prevents the two most common disputes: a cabinet that arrives 20 mm too wide, and glass doors that foul a pendant or a tapware spout.
2. Record what "glass front" means on this unit
Glass is not one option but several, and each one changes price, safety handling and cleaning. Note the choice for every elevation rather than writing "glass front" as a blanket term:
| Decision | What to write down |
|---|---|
| Glass type and colour | Clear, frosted, ribbed or smoked glass, and the frame finish it pairs with. The Santerson catalogue lists these same glass and frame combinations across its wardrobe and cabinet ranges, so name the exact combination rather than a look. |
| Frame system | Aluminium frame or timber-framed door, profile colour, and whether the frame is slim-line or a heavier section. |
| Door operation | Hinged, sliding or folding; hinge side and stack direction; handle or handleless edge pull. |
| Glazing safety detail | How the glass is retained and edged, and what the site team should expect on delivery. Confirm this with the factory for each project rather than assuming a standard. |
| Interiors behind the glass | Shelf material, shelf spacing, backing panel, and any display niche or glass shelving. |
Where the bar sits next to kitchen cabinetry, keep the frame finish and door profile on the same schedule as the glass front aluminium frame cabinets so that one finish review covers both.
3. Specify lighting as part of the cabinet, not after it
A glass front only performs once there is light inside it. Decide and document:
- Whether LED tape sits in the shelf edge, the carcass top or a vertical channel, and where the driver is reachable for maintenance.
- Switching: door-activated, wall switch, or a scene on the room control system. Record who supplies the switch and who wires it.
- Colour temperature and dimming behaviour, matched to the room's other integrated cabinet lighting.
- The spare-parts route for drivers and tape, agreed before handover.
The interface between trades is where glass-front cabinets fail most often. One line in the record — "cabinet supplier provides the LED strips and drivers; electrical contractor provides the feed and switch" — settles it.
4. Match the bar type to the project type
The Bar Cabinets collection covers several configurations, and a procurement record should show why one was chosen over another:
- Compact bar cabinets for apartments and smaller villas, where the brief is storage and presentation in a shallow footprint.
- Glass-front units where bottles and glassware are part of the interior composition and need to read as display.
- Tall bar cabinets for full-height storage runs, typically paired with a pantry or appliance wall.
- Integrated bar systems where the bar is continuous with kitchen or living joinery and must share carcass construction and handles.
Villa work and hospitality work pull in different directions. A private residence usually wants the bar to read as furniture; a hotel or serviced-apartment unit has to survive daily housekeeping, guest use and a replacement cycle. Note which of those pressures drove the configuration you chose, especially where the same detail repeats across several keys — that is the case for custom built-in cabinetry supplied as interior fixtures rather than bought as loose furniture.
Record the reasoning in one sentence per unit. Six months later, that note answers a variation request from a contractor who wants to swap configurations mid-programme.
5. Confirm finishes against samples, and keep the samples
Made-to-measure work is specified from physical boards and shop drawings, not from catalogue photography. For each unit, file:
- The approved carcass, door and interior finish codes, with the physical sample labelled and dated.
- Glass samples held against the frame finish under the room's actual lighting.
- Hardware schedule — hinges, slides, handles — with brand and model where a project standard applies.
- The approved shop drawing revision, initialled by the designer.
Santerson's custom and OEM service covers bespoke finishes, textures and prototyping alongside manufacturing, so a finish that does not exist in the standard range can still be quoted. What matters for procurement is that the approved board number and revision appear on the purchase order, not only in an email thread.
6. Document the delivery and installation sequence
Glass-front units arrive in a specific order and need a clean, dry, secure store. Record:
- Incoterms, port of discharge and final delivery address for each shipment.
- Packaging list per room or unit number, so the site team can confirm what is missing on the day rather than at installation.
- Storage conditions agreed with the builder — glass-front doors should not be stood loose on a wet screed.
- Who installs: the supplier's installation and after-sales service covers on-site fitting, inspection of snags, spare parts and maintenance, so name the scope in the contract and note which items fall to the local contractor.
- The snag list format and sign-off sheet used at handover.
7. Keep one file per unit through handover
The practical test of procurement quality is whether a facilities team can maintain the cabinet three years on. A complete handover file for each bar cabinet holds: room data sheet, approved shop drawing, finish and glass sample record, hardware schedule, lighting wiring note, delivery note with unit numbers, snag sign-off, and the supplier contact for spares.
SANTERSON works as a furniture and building materials manufacturer supplying project packages from one source, with design coordination, custom/OEM production, door-to-door logistics and installation support under the same contract. For procurement teams that means fewer interfaces to manage — and a stronger reason to keep the record tight, because one supplier can be held to one documented specification.
Send us your bar cabinet schedule
Share the room data, glass and finish preferences, and installation programme for your project, and our team will confirm configurations, made-to-measure sizing and delivery scope for a quotation.
Contact: PHILLIP | Phone / WhatsApp: +86-13928214007 | Email: santerson@qq.com
Related ranges: Wall Mounted Bar Units · Island Bar Units · Interior Fixtures