A two tone acrylic wardrobe looks simple on a drawing: two contrasting fronts, one clean line, a run of cabinetry fitted to a wall. Ordering it from an overseas manufacturer is where projects go wrong — mismatched finishes between rooms, sizes that no longer match the site, and documentation that never arrives. This guide walks through how OEM sourcing for these wardrobes runs at SANTERSON, step by step, and what to confirm before production starts.

What "OEM" means for this product

In our Two Tone Acrylic Wardrobes, the finish sits on panel fronts, and the product record lists made-to-measure sizing, material and finish options, and a layout tailored to each project. "Two tone" therefore describes the pairing of finishes you specify — not one fixed colour scheme, and no single standard size.

OEM sourcing means you supply the requirement and we build to it: your dimensions, your finish pairing, your internal layout, and where you want it branded, our Custom & OEM Service covers bespoke finishes and textures, prototyping, OEM production, flexible minimum order quantities and brand customisation such as engraving, embossing, logos and packaging. That is different from picking a catalogue item off a shelf — the specification is yours, and it is written down before anything is cut.

Step 1: Brief, drawings and room dimensions

Send what you already have. A set of architectural elevations works; so does a measured sketch. For each wardrobe run we need the width, height and depth at several points along the wall rather than one average figure, because floors, ceilings and reveals are rarely square on site. We also need the door operation — hinged, sliding or open — and whether the unit is built into a recess or freestanding.

If your team does not have drawings yet, our Interior Design Services cover space layout planning, concept design and mood boards, furniture layouts with 3D visual renderings, and coordination of drawings and production. For a whole-bedroom or whole-apartment package, the same team works across Customized Furniture so wardrobes, vanities and kitchen cabinetry are drawn to one set of dimensions instead of three.

Step 2: Confirming the two-tone specification

This is the step buyers most often rush. Before we quote, we lock down:

  • Which surfaces carry which finish. A common reading of "two tone" is contrasting doors against a neutral carcass; another is alternating door panels within one run. Tell us which you mean and mark it on the elevation.
  • Sheen, not just colour. Our Acrylic Wardrobes collection includes White Acrylic Wardrobes, Matte Acrylic Wardrobes and Black Acrylic Wardrobes. The same colour in a matte and a high-gloss surface reads as two different products on site.
  • Where the second finish continues. If the wardrobe has to match Two Tone Acrylic Cabinets in an adjoining open-plan kitchen, say so at this stage — batch and grain direction are easier to align when they are ordered together.
  • Edge and handle treatment. Handleless fronts, aluminium profiles or visible pulls change the panel order and the clearance each door needs.

Confirm dimensions and selected specifications for each project. What this article describes is the sourcing workflow — tolerances, transit terms and warranty come from your own quotation and contract.

Step 3: Quotation and detail confirmation

The cooperation steps we work to are project brief and design proposal, then quotation and detail confirmation, then production, shipment and follow-up. The quotation you receive should itemise the panel make-up, the finish schedule per elevation, the internal fittings (hanging rails, drawers, shelves, lighting), and the packing method. If any of those are missing, ask for them before signing — a price that does not say what the door is made of is not comparable with another supplier's.

For multi-unit jobs — apartment blocks, serviced apartments, hotel room sets — this is also where order quantity and batching get settled. Flexible minimum order quantities mean a first batch can prove the specification in a show unit or a single floor before the remainder is released.

Step 4: Production, inspection and paperwork

Once details are confirmed, panels are cut, edged, finished and assembled to the approved drawings. For project buyers, the practical control point is the pre-shipment check against the approved finish schedule and dimension sheet: colour and sheen on every elevation, drawer counts, hinge and slide hardware, and protection on finished faces for transit.

Ask early what your import needs in writing — commercial invoice, packing list, certificate of origin. Our Logistics & Door-to-Door Delivery service covers freight forwarding by sea, air and rail, customs paperwork, packaging and container loading, shipment tracking and door-to-door delivery. Routing, duties and Incoterms are settled case by case with your own broker or freight agent.

Step 5: Delivery, installation and support

Built-in wardrobes fail at the wall, not in the factory. Our Installation & After-sales Support covers on-site installation, inspection and snags, spare parts and replacement, and ongoing maintenance. Whichever team fixes the units, give them the approved elevation drawings and the finish schedule — installers who work from the same sheet you signed are the cheapest insurance you can buy on a joinery package.

A procurement checklist for OEM wardrobes

  • Room dimensions taken at multiple points per wall, not one average measurement
  • Elevations marked with which panels carry finish A and which carry finish B
  • Sheen stated for every surface (matte or high gloss), not colour names alone
  • Door operation and clearance shown on the drawing
  • Internal layout listed per unit: rails, drawers, shelves, lighting
  • Matching cabinetry in adjoining rooms ordered against the same finish schedule
  • Quotation itemises panel make-up, hardware and packing method
  • Import paperwork named in advance; duties and Incoterms confirmed with your broker
  • Approved drawings and finish schedule sent to whoever installs on site

Common questions

Can we order one wardrobe as an OEM sample? Minimum order quantities are flexible, so a single show unit or first batch is usually possible to prove the finish and layout before the rest of the run is released. Confirm the applicable quantity for your specification with us.

Do we have to supply our own drawings? No. Measured sketches are enough to start, and design support covers layout planning and 3D renderings if you need them.

Can the wardrobe match our kitchen cabinets? Yes, when both are specified against one finish schedule at the same time — that is where two-tone acrylic schemes hold together across an open-plan space.

Send us your elevations, room dimensions and the finish pairing you want, and we will come back with a specification sheet and quotation for Two Tone Acrylic Wardrobes. For wardrobe, kitchen and bathroom joinery on one project, our Turnkey Interior Project Solutions coordinate the whole built-in package from one team.