A swim spa is one of the heaviest, most technically demanding items on a project bill of materials. Getting the Outdoor Swim Spa WS-PC06ST from our factory floor to a villa terrace or resort pool deck involves oversized freight, electrical coordination and site preparation that most buyers have never arranged before. The steps below are the ones we work through on every project order, so you can plan them into your programme instead of discovering them late.
Start with the configuration, not the shipping date
The WS-PC06ST is a configurable unit. The catalog lists it at 5900 × 2400 × 1470 mm, with a swim training system, water jets, ozone sanitation and LED lighting; the longer variant on the same platform, WS-PC06ST-L, runs to 6390 × 2400 × 1470 mm. Optional items such as heat pumps, UV sterilisation, additional water pumps, sand filtration, insulation and steps are ordered per project, and each one changes both the crate plan and the power draw at the site.
Because options change the equipment set, we ask buyers to lock the specification before production starts. The captured catalog data for this model shows a total power figure of 6.55 kW with the standard feature set, but that number moves once heat pumps or extra pumps enter the configuration — so treat it as a starting point and confirm the final load against your selected build.
Catalog data for WS-PC06ST (confirm against your order)
- Shell size: 5900 × 2400 × 1470 mm
- Swim training system: 1 set
- Control system: 1 set
- Filter pump: 1 pc; jet total: 6 pcs
- LED lights: 4
- Total power as listed: 6.55 kW
Confirm the electrical and site conditions early
This is where international orders most often stall. Your local electrician needs the confirmed equipment list — supply voltage, phase, circuit capacity, earthing requirements and the location of the control panel — before trenching or pouring the plinth. In our experience the practical sequence is:
- Send us the site drawing with access routes, crane or forklift points, and the finished level of the deck.
- Confirm the configuration and obtain the final electrical schedule from our engineering team.
- Hand that schedule to your local electrician and plumbing contractor so first-fix works match what will arrive.
- Check local permits and any pool or electrical approvals required by your council or authority. Import rules, duties and building requirements differ by country and are the buyer's responsibility; we supply the documentation, not compliance advice.
Choose the freight mode against the crate, not the calendar
A 5.9-metre shell with a 2.4-metre width does not travel as ordinary parcel freight. Our logistics team arranges sea, air and rail forwarding, packing lists, commercial invoices and certificates of origin, and books the container or flat-rack loading to suit the crate dimensions you have confirmed. For most single-unit project orders sea freight with door-to-door delivery is the normal route; where a handover date is fixed we look at faster options together with you rather than promising a transit time in advance.
Two practical points on landed cost: oversized cargo usually needs a permit for the final leg to site, and the delivery vehicle must be able to reach the property. Tell us whether the site is a tight urban villa plot or an open resort address, and we will plan around it.
Build in inspection and commissioning at handover
When the unit lands, we expect the buyer to check the crates against the packing list before the carrier leaves, photograph any damage on the delivery note, and then let our team guide commissioning: filling, jet and filter pump operation, control-system settings, ozone dosing and steps or handrail fixing. Our installation and after-sales support covers inspection, snags, spare parts and maintenance guidance; warranty terms and response commitments vary by project, so we put them in writing for your order rather than assuming a standard package.
Why buyers group the swim spa with other project items
Most clients ordering this product are also fitting out bathrooms, terraces and outdoor lounges on the same programme. Coordinating the swim spa with outdoor furniture, wall and floor finishes and bathroom fixtures in one production and shipping plan reduces the number of separate consignments, keeps finishes matched, and gives you a single point of contact from design through handover. That is how our one-stop solution works for villa and hospitality projects: consultation, design and planning, production, logistics, installation and after-sales in one chain.
If you are sourcing several product families for the same development, our custom and OEM service also lets you match cabinet finishes, frame colours and fabric tones across the building and the pool deck, with prototyping and material samples before mass production.
Plan a project order for the WS-PC06ST
Send us the site drawings, target handover date and country of delivery. We will return a configuration proposal, the confirmed equipment and electrical schedule, and a door-to-door freight plan for your review.
Contact: PHILLIP · Phone/WhatsApp +86-13928214007 · Email santerson@qq.com · Enquiries at our contact page.