A swim spa of this size is not a catalogue item you simply drop into a container. Before tooling, shell fabrication and equipment procurement begin, the configuration has to be locked down in writing — otherwise change orders arrive after production has started, and every late revision moves the delivery date. The checklist below is the one we work through with buyers who specify Outdoor Swim Spa WS-S12-T for villas, resorts and private residences.
Start from the shell, not the options list
WS-S12-T sits in our configurable outdoor swim and hydrotherapy range. The published catalogue dimensions are 11740 × 2200 × 1470 mm, and those figures should be treated as the starting point for site design rather than as a fixed final size. Confirm three things first:
- Footprint versus structure. A shell of this length needs a slab and footing designed for the loaded weight, plus clear access for delivery and craning. Send us the foundation drawing and the site access photos before we quote production.
- Cover or enclosure intent. Whether the unit is open-air, partially covered or enclosed changes insulation grade and how the heat pump is sized.
- Water line, drainage and plant space. Filter pump and control locations need to be reachable for routine service, not buried behind finished walls.
Confirm the equipment set that actually ships
The catalogue specification for this model shows one control system, one swim training system, two water pumps, one filter pump, 73 jets in total, one LED fitting with 50 small LED lights, and a total power figure of 7.65 kW. Features listed are water jets, LED lighting, ozone and the swim training system.
Two points matter commercially. First, that equipment set is what the catalogue shows — it is not automatically the set you receive unless your purchase document repeats it line by line. Second, the options we list for this range (control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps) vary in availability and compatibility between models. Quote requests that say only "WS-S12-T with options" cannot be priced consistently; send a marked-up equipment schedule instead.
| Item to confirm | Why it delays production if left open |
|---|---|
| Jet count and layout | Jet positions are drilled into the shell; moving one after fabrication means scrapping a shell section. |
| Swim training system specification | Determines pump duty, nozzle size and the length of the swim lane that must be held clear. |
| Heat pump and insulation grade | Sized against year-round water temperature targets and whether the unit is enclosed. |
| Ozone and UV sterilisation combination | Affects plumbing routing and the control panel layout. |
| Steps, seating and LED arrangement | Changes mould tooling and internal fit-out before assembly. |
| Total power and electrical supply | The catalogue figure must be matched to the local supply available on site; confirm the supply before we finalise pump selection. |
Electrical and commissioning scope
This is where most project timelines slip. The 7.65 kW total power shown in the catalogue must be reconciled with what the site can actually deliver — supply phase, breaker rating, cable run length and earthing arrangement are all local decisions made by the buyer's electrical contractor. We confirm the equipment's requirements; your contractor confirms what the installation needs locally. Neither side should assume the other has done this work.
Agree in writing who commissions the unit on site, what is checked at handover, and which items are covered by spares support afterwards. Our installation and after-sales support service describes on-site installation, inspection and snags, warranty coverage, spare parts and ongoing maintenance — but terms, response times and exclusions should be attached to the order, not assumed.
Freight planning for an oversize unit
A shell of this length is not standard cargo. Packaging method, container type, route and delivery point have to be settled before production ends, because they influence how the unit is crated and whether it ships as one piece. Our logistics and door-to-door delivery service handles freight forwarding by sea, air and rail, customs paperwork, packaging and container loading, shipment tracking and delivery to site — with import terms, duties and transit time confirmed case by case for the destination in question.
Where this model fits in the wider range
If the site cannot accommodate 11.7 m, or if the swim training system is not required, compare the configuration against neighbouring models before committing to tooling — for instance Outdoor Swim Spa WS-S12, which shares the same catalogue shell dimensions and jet count but is listed without the swim training system. Shorter options are catalogued across the Swimming Pools and Swim Spas category, and where no standard model matches a project's plan, our custom and OEM service covers bespoke design, prototyping and material selection.
Before you release the order, ask us for a signed configuration sheet: shell dimensions as built, jet schedule with positions, pump and control set, swim training system, sterilisation package, insulation grade, heat pump duty, LED arrangement, steps, total power and the electrical supply assumed. If it is on that sheet, it is what we produce.
A short pre-production checklist
- Foundation and access drawings received and reviewed against the selected configuration.
- Equipment schedule confirmed line by line against the catalogue specification.
- Options selected and checked for compatibility with this model.
- Electrical supply on site verified against the total power requirement.
- Packaging, container plan and delivery point agreed before production closes.
- Commissioning, snag list and spares scope attached to the order.
Send us your site drawings and target configuration, and we will return a build sheet for WS-S12-T with anything unresolved flagged before production opens, so the schedule is settled before fabrication starts.