Open shelving looks simple on a rendering, which is exactly why it causes problems at the quotation and installation stage. This guide sets out what a buyer or project manager needs to write down before requesting pricing, so the shelves that arrive on site match the drawings.

Why open shelving is easy to under-specify

A closed cabinet hides most of its construction behind a door. An open shelving minimalist cabinet exposes everything: the shelf edges, the side panels, the fixing points, the gap between shelves and the wall, and how each item sits against the surrounding finish. In a minimalist detail there is no moulding, handle or trim to absorb an error.

That is why we recommend treating open shelving as its own line item in the procurement brief rather than a variation of the cabinetry package. The information you supply at enquiry stage determines whether a manufacturer can quote from the drawings or has to come back with questions.

What the brief must state before pricing

For each shelving run, list the following. Missing any one of them will delay the quotation or produce a price that cannot be compared with another supplier's.

Item to specifyWhat to write down
Location and room typeKitchen, bathroom, living wall, hallway or utility area. Wet and dry locations are treated as different cases.
Overall envelopeWidth, height and depth of the run, plus the finished floor or finished wall line each dimension is taken from.
Shelf layoutNumber of shelves, vertical spacing between them, and which bays are adjustable versus fixed.
Support methodFloating, concealed bracket, metal frame or recessed niche. State the preference; the manufacturer will confirm what the wall build-up allows.
Panel material and edge detailBoard type, thickness, edge treatment (mitred, rounded, square) and how visible edges face the room.
FinishColour or woodgrain, sheen level, and whether the finish must match adjacent cabinetry.
LoadingWhat the shelves will hold: books, glassware, ceramics, towels, stock. Note heavier items separately.
Integration pointsIntegrated lighting, power outlets, splashbacks, adjacent appliances or doors that affect clearance.

Match the specification to the room, not just the drawing

The same profile behaves differently in a kitchen and in a bathroom. Our corner open shelving for bathroom projects is specified with the wet envelope, wall build-up and fixing substrate confirmed first, because a corner unit has to suit both the tile line and the waterproofing detail. Kitchen runs have their own constraints — appliance clearances, worktop height and how the shelf relates to the tall cabinet beside it.

Where shelving forms part of a larger built-in package rather than standing alone, we specify it inside the storage wall so the module dimensions, panel thickness and finish carry through. See open display niches within our integrated storage wall range for that approach.

Decide the lighting detail early

Shelf lighting is the item most often added after the cabinets are already in production, and retrofitting means routing channels into finished panels. If a run is going to be lit, note it in the brief at enquiry stage: which shelves are lit, whether the driver is accessible for maintenance, and what switching arrangement applies. Our integrated cabinet lighting is coordinated with the panel build-up so the channel and the diffuser line are set out before manufacture.

How to compare quotations for the same shelving

Once you have one complete specification, ask each supplier to price against that document rather than against a picture. Three checks keep the comparison honest:

  • Scope of supply. Does the price include wall fixings, bearers and any support frame, or only the panels?
  • Finish coverage. Are all four edges finished, or only the front and visible faces? On a floating shelf both long edges are visible from standing height.
  • Tolerance responsibility. Who is responsible for setting out on site — the cabinet supplier or the builder? State it in writing before order confirmation.

What we need from you to quote

SANTERSON manufactures built-in furniture and interior fixtures as made-to-measure work, so shelving is produced to the dimensions and finish of each project rather than to a fixed module. A workable enquiry includes the room drawings or marked-up photographs, the envelope dimensions, the shelf layout you want, and your material and finish preference. Where the wall build-up is not yet decided, send what you have and we will flag the open points before production is booked.

If the shelving sits within a wider fit-out — kitchen cabinetry, wardrobes, vanities or wall panelling — it is more efficient to procure it in one package. One manufacturer then carries the coordination between the runs, and the finish reference is shared across all the timber work. Our Custom & OEM Service covers prototyping and bespoke finishes for projects where the detail is not in a standard catalogue.

Before you send the enquiry

  • Dimensions are taken from finished surfaces, with the reference line named.
  • Support method and loading are stated for every run.
  • Lighting, power and adjacent openings are marked on the drawing.
  • The finish reference is identified by name or sample number.
  • Site set-out responsibility is assigned to a named party.

Dimensions, materials and fixing details are confirmed for each project before manufacture. Specifications shown in product listings are indicative and are finalised with the drawings you supply.

Talk to us about your shelving package

Send your drawings, envelope dimensions and finish preference and we will return a quotation with the open points listed. As a China-based manufacturer of furniture and building materials, SANTERSON handles built-in furniture alongside the rest of the fit-out, from production through to door-to-door delivery.