A black acrylic wardrobe looks simple on a rendering: one flat, reflective panel, no handles, sharp edges. That is exactly why it is easy to get wrong when the order leaves the factory gate. Surface quality, edge work and the way carcass and door are specified all have to be agreed before production starts, because once the acrylic sheet is pressed and cut there is very little that can be corrected.
If you are buying these wardrobes for a villa, an apartment development or a hotel room floor, the usual route is OEM: your dimensions and details, somebody else's factory line. Below is how that process actually runs at SANTERSON, and what to prepare so the quotation you receive is comparable with the others on your desk.
What "OEM" Means for a Wardrobe Order
OEM manufacturing means the factory builds to your specification rather than selling you a standard catalogue item. For Black Acrylic Wardrobes, our product page lists made-to-measure sizing, material and finish options, and a layout tailored to the project — which is the practical definition of OEM here. You are not choosing from three fixed widths; you are supplying openings, and we produce to them.
This matters commercially because it changes what you are comparing between suppliers. A catalogue price covers an item. An OEM price covers a make-up you defined: substrate, surface, edge treatment, hardware, interior fittings, packaging standard and the level of drawing detail behind it. Two quotations for "one black acrylic wardrobe, 2400 mm wide" can sit far apart for entirely legitimate reasons.
Stage 1: Drawings Before Anything Is Cut
The first deliverable is not a sample, it is a drawing set. For a wardrobe run this normally means elevation drawings for each unit with overall width, height and depth marked; a plan showing the interior zoning — hanging sections, drawers, shelving, any integrated lighting; and a door schedule giving the lay of every door and how it opens.
What we need from your side at this stage:
- Room dimensions taken on site, including skirting, architraves, cornice lines, ceiling level variation and anything that stops a carcass sitting flush to a wall.
- The finished floor level. A built-in wardrobe is dimensioned from the completed floor, not the slab.
- Door type: hinged, sliding or an open system, and whether handles are required or a handleless profile.
- Interior make-up per unit — how many hanging rails, drawer banks, tall sections, and whether any section is for luggage or seasonal storage.
- Whether the units are for one show villa or repeated across many identical rooms. Repetition changes both tooling and packaging.
Stage 2: Specifying the Black Acrylic Surface Properly
"Black acrylic" is not a single specification, and vague wording in an enquiry produces vague pricing. Two details decide most of the cost and most of the complaints.
Gloss or matte
A high-gloss black door reads as a mirror panel and shows fingerprints, dust and every unevenness in the substrate beneath it. A matte acrylic door hides those things but feels different in the hand and reflects far less light. Both sit in our acrylic range: Matte Acrylic Wardrobes for a soft, low-reflection front, White Acrylic Wardrobes and Two Tone Acrylic Wardrobes when a room needs the same construction in a lighter or split colour. Say which one you want, because gloss and matte are not interchangeable on site.
Edges and the substrate under the surface
On a dark gloss door the edge is where quality becomes visible. Specify the radius of the edge profile, whether the wrap turns continuously around all four sides or mitres at the corners, and what substrate sits beneath the acrylic sheet. The substrate affects flatness on tall doors, how hinges hold, and how the panel behaves in a heated room. We work with engineered boards, metals, engineered stone and laminates across our custom programme, so the carcass and the door face are specified separately — which is also how you keep a budget under control by varying the carcass while holding the visible surface constant.
For tall wardrobe runs, ask whether the doors are produced as one full-height panel or ganged from two. Both are workable; they look different and cost differently.
Stage 3: Samples You Can Judge in Real Light
Before a production order, request a door sample in the exact specification — same colour, same gloss level, same edge radius, same substrate — and view it in the room where it will be installed, not only under showroom lighting. Black gloss behaves very differently under warm downlights and daylight from a north facing window. A physical sample also lets you check how the surface takes handling marks after a week of use.
Stage 4: Quotation Structure and MOQs
Ask for the quotation broken into the same lines every time so competing suppliers can be compared honestly:
| Line item | What to have stated |
|---|---|
| Carcass | Board type and thickness, colour of interior faces, edge banding on visible interior edges. |
| Doors | Acrylic surface, gloss or matte, substrate, edge profile radius, size of each door. |
| Hardware | Hinge brand and closing type, slide rating for drawers, sliding gear make-up and load rating. |
| Interior fittings | Rails, drawer banks, shelving spans, any lighting and its transformer location. |
| Packaging | Panel-by-panel packing list, corner protection, carton marks matched to the room schedule. |
| Freight | Port of loading, delivery terms, whether inland delivery at destination is included. |
Minimum order quantity is negotiable on OEM work rather than fixed, and it moves with the finish. A colour already running in the acrylic range costs less to order in than a bespoke one. If you are furnishing a development, ask whether the same carcass can carry different door colours across unit types — that keeps volume in one production family while giving each apartment type its own look.
Stage 5: Production Checks and Site Fit
For a multi-unit order, agree the check points before cutting starts: approved drawing revision number, signed-off door sample reference, and photographs of the first units off the line before they are packed. These three items settle almost every dispute that would otherwise arise after delivery.
Because our scope covers design consultation and space planning through to manufacturing and quality control, then project management and site coordination, the same team holds the drawing set from approval to handover — which is where make-to-measure joinery either fits on the first visit or does not. Our One-stop Solution covers that chain, and Turnkey Solutions covers villa, hospitality and office projects where wardrobes arrive alongside flooring, doors, vanities and lighting rather than as an isolated purchase.
A Short Pre-Order Checklist
- Site dimensions recorded against the finished floor level, with ceiling variation noted.
- Gloss or matte stated in writing on the drawing and the purchase order.
- Edge profile radius and substrate confirmed for every door size.
- Door sample viewed in the actual room before the order is released.
- Hardware brands and load ratings named, not described as "soft close".
- Carton marks matched to a room-by-room schedule so installers know where each panel belongs.
- First-article photographs approved before the balance of the run is packed.
Send us the floor plans, the unit count and the finish you have in mind, and we will come back with a drawing set and an itemised quotation rather than a single line price. That is the point of OEM sourcing: the specification does the work before the steel-cutting does.